| Mahatma Gandhi National Rural Employment Guarantee Act | ||||
| Schemes Sanctioned under MGNREGS, Development Block Salooni | ||||
| BACK | ||||
| Sanction No.-DRDA-CBA-(NREGA)/2012-13-709-16 | Dated:- 21.05.2012 | |||
| Total No of Schemes :-1192 | Amount | 21,49,16,000 | ||
| Sr.No | Name of Scheme | Activity Name/Sub Head | Gram Panchayat | Amount Sanctioned |
| 1 | C/o Irrigation Scheme Nagni Nalla to Dehrog | Irrigation | Ayal | 300,000 |
| 2 | C/o Panihara at Village Dehrog -II | Renovation of Traditional Water Bodies | Ayal | 100,000 |
| 3 | C/o Land Development Bharnu | Land Development | Ayal | 150,000 |
| 4 | C/o Protection Work Dehrog-I | Flood Control | Ayal | 150,000 |
| 5 | C/o Panihara at Village Khairna-II | Renovation of Traditional Water Bodies | Ayal | 100,000 |
| 6 | C/o Protection Work Sagwari | Flood Control | Ayal | 150,000 |
| 7 | C/o Protection Work Hiyan | Flood Control | Ayal | 150,000 |
| 8 | C/o Crate Work Salian | Flood Control | Ayal | 150,000 |
| 9 | C/o Crate Work Saroga | Flood Control | Ayal | 150,000 |
| 10 | C/o Crate Work Kalihan | Flood Control | Ayal | 150,000 |
| 11 | C/o Protection Work Khajrala | Flood Control | Ayal | 150,000 |
| 12 | C/o Land Development Khairna | Land Development | Ayal | 300,000 |
| 13 | C/o Land Development Khangu | Land Development | Ayal | 300,000 |
| 14 | C/o Protection Work Mohala | Flood Control | Ayal | 150,000 |
| 15 | C/o Protection Work Thenela | Flood Control | Ayal | 150,000 |
| 16 | C/o Protection Work Chinalui | Flood Control | Ayal | 150,000 |
| 17 | C/o Panihara at Village Jiwala | Renovation of Traditional Water Bodies | Ayal | 100,000 |
| 18 | C/o Panihara at village Sagwari | Renovation of Traditional Water Bodies | Ayal | 100,000 |
| 19 | C/o Protection Work Sagwari | Flood Control | Ayal | 150,000 |
| 20 | C/o Land Development Sahu | Land Development | Ayal | 150,000 |
| 21 | C/o Panihara Sahu-I | Renovation of Traditional Water Bodies | Ayal | 80,000 |
| 22 | C/O Protection work at village Ludrera (PS) | Flood control | Ayal | 300,000 |
| 23 | C/O Protection work at village Bhalodi (PS) | Flood control | Ayal | 200,000 |
| 24 | C/o Panihara Sahu-II | Renovation of Traditional Water Bodies | Ayal | 100,000 |
| Total | 3,930,000 | |||
| 1 | C/o Irrigation Scheme Kharkila (I) | Irrigation | Panjei | 300,000 |
| 2 | C/o Land Development.at Village Patola | Land Development | Panjei | 150,000 |
| 3 | C/o Land Development.at Village Kharkila | Land Development | Panjei | 100,000 |
| 4 | C/o Land Development.at Village Ralhei | Land Development | Panjei | 100,000 |
| 5 | C/o Land Development.at Village Chuani | Land Development | Panjei | 150,000 |
| 6 | C/o Land Development. At Village Katoga | Land Development | Panjei | 150,000 |
| 7 | C/o Irrigation Tank Chuani | Irrigation | Panjei | 150,000 |
| 8 | C/o Irrigation Tank Katoga | Irrigation | Panjei | 150,000 |
| 9 | C/o Pond at Village Chechi | Water Harvesting | Panjei | 100,000 |
| 10 | C/o Land Development.Kunda Kharkila | Land Development | Panjei | 150,000 |
| 11 | C/o Land Development Challa | Land Development | Panjei | 150,000 |
| 12 | C/o Land Development Cheteri | Land Development | Panjei | 150,000 |
| 13 | C/o Land Development Palnoti | Land Development | Panjei | 150,000 |
| 14 | C/o Land Development Sahi | Land Development | Panjei | 150,000 |
| 15 | C/o Land Development Ramyound | Land Development | Panjei | 150,000 |
| 16 | C/o Land Development Sawi | Land Development | Panjei | 150,000 |
| 17 | C/o Land Development Sidhoth | Land Development | Panjei | 150,000 |
| 18 | C/o Land Development Fullra | Land Development | Panjei | 150,000 |
| 19 | C/o Land Development Liswarka | Land Development | Panjei | 150,000 |
| 20 | C/o Land Development Bhadowa | Land Development | Panjei | 150,000 |
| 21 | C/o Land Development work Panchyat Land GP Panjei | Land Development | Panjei | 300,000 |
| 22 | C/o Irrigation Scheme Swai (I) | Irrigation | Panjei | 150,000 |
| 23 | C/O Protection drain at village Katoga (PS) | Flood Control | Panjai | 300,000 |
| Total | 3,750,000 | |||
| 1 | C/o Protection Work GPS Khangu (I) | Flood Control | Banantar | 150,000 |
| 2 | C/o Panihara Ajyani (I) | Renovation of Traditional Water Bodies | Banantar | 100,000 |
| 3 | C/o Protection Work Seru (II) | Flood Control | Banantar | 150,000 |
| 4 | C/o Protection Work Chipedla | Flood Control | Banantar | 150,000 |
| 5 | C/o Protection Work Rakh | Flood Control | Banantar | 150,000 |
| 6 | C/o Panihar Kidwas | Renovation of Traditional Water Bodies | Banantar | 100,000 |
| 7 | C/o Protection Work Chirwadi 1 | Flood Control | Banantar | 150,000 |
| 8 | C/o Protection Work Rinda | Flood Control | Banantar | 150,000 |
| 9 | C/o Irrigation Scheme Deloei | Irrigation | Banantar | 150,000 |
| 10 | C/o Panihara Panchyat Ghar | Renovation of Traditional Water Bodies | Banantar | 100,000 |
| 11 | C/o Protection work Tungla | Flood Control | Banantar | 150,000 |
| 12 | C/o Soil Conversion Work Siura 1 | Flood Control | Banantar | 150,000 |
| 13 | C/o Protection work Chilli | Flood Control | Banantar | 150,000 |
| 14 | C/o Panihar Lampati 2 | Renovation of Traditional Water Bodies | Banantar | 75,000 |
| 15 | C/o Protection Drain Sudla | Flood Control | Banantar | 100,000 |
| 16 | C/o Protection Work Rakh | Flood Control | Banantar | 150,000 |
| 17 | C/o Protection Work Gursan | Flood Control | Banantar | 150,000 |
| 18 | C/o Protection Work Khamwas | Flood Control | Banantar | 150,000 |
| 19 | C/o Irrigation Tank Behi | Irrigation | Banantar | 100,000 |
| 20 | C/o Irrigation Tank Lampyak | Irrigation | Banantar | 150,000 |
| 21 | C/o Soil Conversion Work Sudla | Flood Control | Banantar | 150,000 |
| 22 | C/o Irrigation Tank at Village Chundi | Irrigation | Banantar | 150,000 |
| 23 | C/o Protection Drain Chundi | Flood Control | Banantar | 100,000 |
| 24 | C/o Panihara with Tank at Chipdela | Renovation of Traditional Water Bodies | Banantar | 150,000 |
| 25 | C/o Panihara Janderi ghat | Renovation of Traditional Water Bodies | Banantar | 50,000 |
| 26 | C/o Soil Conversion Work Chelei | Flood Control | Banantar | 150,000 |
| 27 | C/O Land Dev. work at village Rolaka (PS) | Land Dev | Banantar | 200,000 |
| 28 | C/O Protection work at village Pangawali-2 (PS) | Flood control | Banantar | 200,000 |
| Total | 3,825,000 | |||
| 1 | C/o Protection Work at Bhangatu | Flood Control | Badka | 80,000 |
| 2 | C/o Protection Kulah at Gadan | Flood Control | Badka | 100,000 |
| 3 | C/o Panihara at Darogi | Renovation of Traditional Water Bodies | Badka | 30,000 |
| 4 | C/o Protection Kulah at Nagali | Flood Control | Badka | 80,000 |
| 5 | C/o Irr Kulah at Shahan | Irrigation | Badka | 100,000 |
| 6 | C/o Land Dev Work at Dhibher | Land Development | Badka | 80,000 |
| 7 | C/o Irrigation Tank at Diyol | Irrigation | Badka | 80,000 |
| 8 | C/o Protection Work at Salot | Flood Control | Badka | 50,000 |
| 9 | C/o Irrigation Kulah at Chho to Patotri | Irrigation | Badka | 200,000 |
| 10 | C/o Irrigation Tank at Tabari | Irrigation | Badka | 80,000 |
| 11 | C/o Protection Work at Anoga | Flood Control | Badka | 100,000 |
| 12 | C/o Crate work at Salot | Flood Control | Badka | 80,000 |
| 13 | C/o Protection work at Anoga 2nd | Flood Control | Badka | 80,000 |
| 14 | C/O Crate work at Deyoga (PS) | Flood control | Badka | 400,000 |
| 15 | Protection work for Kuhal at at village Gadhav (PS) | Flood control | Badka | 300,000 |
| 16 | C/o Protection Work at Chhihot | Flood Control | Badka | 200,000 |
| 17 | C/o Khadunja Path with Drain -Main Road to Khundi | Rural Connectivity | Badka | 200,000 |
| 18 | C/o Khadunja Path with Drain - GPS Bhedoi to main Road | Rural Connectivity | Badka | 210,000 |
| 19 | C/o Khadunja Path with Drain at Bhedoi | Rural Connectivity | Badka | 120,000 |
| 20 | C/o Khadunja Path with Drain Jhoda to Anoga | Rural Connectivity | Badka | 70,000 |
| 21 | C/o Khadunja Path with Drain Lahrota to Panihara | Rural Connectivity | Badka | 120,000 |
| 22 | C/O Khadunja Path with drain Kokua to Dadhot | Rural Connectivity | Badka | 66000 |
| 23 | Gharnu to Patotri | Rural Connectivity | Badka | 75000 |
| 24 | C/o Khadunja Path with Drain at Kalichhand | Rural Connectivity | Badka | 150,000 |
| Total | 3,051,000 | |||
| 1 | C/o Protection Work Poutha | Flood Control | Bhajotra | 200,000 |
| 2 | C/o Protection Work Ghared | Flood Control | Bhajotra | 150,000 |
| 3 | C/o Crate Work Khaloh | Flood Control | Bhajotra | 150,000 |
| 4 | C/o Protection Work Khadkota | Flood Control | Bhajotra | 200,000 |
| 5 | C/o Protection Work Village Siroti | Flood Control | Bhajotra | 150,000 |
| 6 | C/o Irrigation Tank Village Bhajotra | Irrigation | Bhajotra | 120,000 |
| 7 | C/o Irrigation Tank Chatela | Irrigation | Bhajotra | 120,000 |
| 8 | C/o Protection Work Village Panjoga | Flood Control | Bhajotra | 150,000 |
| 9 | C/o Irrigation Tank Drod-II | Irrigation | Bhajotra | 120,000 |
| 10 | C/o Crate Work Bhota-II | Flood Control | Bhajotra | 200,000 |
| 11 | C/o Irrigation Tank Village Ranhoti | Irrigation | Bhajotra | 120,000 |
| 12 | C/o Protection Work Village Kut | Flood Control | Bhajotra | 150,000 |
| 13 | C/o Protection Work Cheen Nalla | Flood Control | Bhajotra | 150,000 |
| 14 | C/O Crate work at village Girjindoo (PS) | Flood control | Bhajotra | 400,000 |
| 15 | C/O Crate work at village Dadwal (PS) | Flood control | Bhajotra | 400,000 |
| 16 | C/O Crate work at village Drrod (PS) | Flood control | Bhajotra | 400,000 |
| 17 | C/O Crate work at village Mullar (PS) | Flood control | Bhajotra | 400,000 |
| 18 | C/o Crate Work Matwad | Flood Control | Bhajotra | 150,000 |
| 19 | C/o Protection Work Village Shalla | Flood Control | Bhajotra | 150,000 |
| 20 | C/o Khadunja Path with Drain - Chondi Ghodi to Garh Mata | Rural Connectivity | Bhajotra | 250,000 |
| 21 | C/o Khadunja Path with Drain Road to Garjindu - II | Rural Connectivity | Bhajotra | 100,000 |
| 22 | C/o Khadunja Path with Drain at Jamota | Rural Connectivity | Bhajotra | 80,000 |
| Total | 4,310,000 | |||
| 1 | C/o Protection Kulah at Guland | Flood Control | Mouda | 250,000 |
| 2 | C/o Protection Work at Khill Katal | Flood Control | Mouda | 300,000 |
| 3 | C/o Protection Kulah at Ruhani Dhera | Flood Control | Mouda | 200,000 |
| 4 | C/o Crate Work at Telka Katal | Flood Control | Mouda | 150,000 |
| 5 | C/o Panihara at Jajanu Telka | Renovation of Traditional Water Bodies | Mouda | 100,000 |
| 6 | C/o Land Development Work at Telka 1st | Land Development | Mouda | 200,000 |
| 7 | C/o Panihara at Guland | Renovation of Traditional Water Bodies | Mouda | 800,000 |
| 8 | C/o Panihara at Vill Hallela | Renovation of Traditional Water Bodies | Mouda | 100,000 |
| 9 | C/o Crate Work at Rouhani | Flood Control | Mouda | 250,000 |
| 10 | C/o Panihara at Vill Kasani | Renovation of Traditional Water Bodies | Mouda | 80,000 |
| 11 | C/o Protection work at Lamang Salan | Flood Control | Mouda | 200,000 |
| 12 | C/o Irrigation Tank at Vill Salan Banger | Irrigation | Mouda | 150,000 |
| 13 | C/o Protection Work at Hallela | Flood Control | Mouda | 300,000 |
| 14 | C/o Protection Work at Banjeru | Flood Control | Mouda | 300,000 |
| 15 | C/o Protection Work at Khill | Flood Control | Mouda | 150,000 |
| 16 | C/o Crate Work at Kasani | Flood Control | Mouda | 200,000 |
| 17 | C/o Kacha Talab at Khamdah | Water Harvesting | Mouda | 100,000 |
| 18 | C/o Panihara at Khamdah | Renovation of Traditional Water Bodies | Mouda | 50,000 |
| 19 | C/o Irrigation Tank at Hallela Atalu | Water Harvesting | Mouda | 150,000 |
| 20 | C/o Irrigation Tank at Nadu | Water Harvesting | Mouda | 150,000 |
| 21 | C/O Protection work at village Thaloga (PS) | Flood control | Mouda | 300,000 |
| 22 | C/O land development work at village Dehaie (PS) | Land Dev | Mouda | 400,000 |
| 23 | C/O Protection work at village Mouda (PS) | Flood control | Mouda | 400,000 |
| 24 | C/o Khadunja Path with Drain -Lanot to Talai | Rural Connectivity | Mouda | 150,000 |
| 25 | C/o Khadunja Path with Drain - Dihoi to Panihar | Rural Connectivity | Mouda | 200,000 |
| 26 | C/o Khadunja Path with Drain -Dihoi to Shamshangat | Rural Connectivity | Mouda | 200,000 |
| 27 | C/o Khadunja Path with Drain - Jangalwad to Drabdu | Rural Connectivity | Mouda | 160,000 |
| 28 | C/o Khadunja Path with Drain - Siya to Banjedu | Rural Connectivity | Mouda | 200,000 |
| 29 | C/O Khadunja Path with drain Main road to village Halela | Rural Connectivity | Mouda | 100000 |
| 30 | C/O Khadunja Path with drain Telka to Ashmala | Rural Connectivity | Mouda | 100000 |
| 31 | C/O Khadunja Path with drainThaloga to GMS Thaloga | Rural Connectivity | Mouda | 200000 |
| 32 | C/O Khadunja Path with drainShallan to Shiv Mandir | Rural Connectivity | Mouda | 94000 |
| 33 | C/o Khadunja Path with Drain Shallan to GPS Thaloga | Rural Connectivity | Mouda | 140,000 |
| Total | 6,824,000 | |||
| 1 | C/o Irrigation Tank at manderwad | Water Harvesting | Bhadela | 150,000 |
| 2 | C/o Irrigation Tank at Jelot | Water Harvesting | Bhadela | 150,000 |
| 3 | C/o Irrigation Tank at Balvaas | Water Harvesting | Bhadela | 150,000 |
| 4 | C/o Panihara at vill Hangoi | Renovation of Traditional Water Bodies | Bhadela | 150,000 |
| 5 | C/o Irrigation Tank at Kathyadi | Water Harvesting | Bhadela | 80,000 |
| 6 | C/o Panihara at vill Bhundedota | Renovation of Traditional Water Bodies | Bhadela | 100,000 |
| 7 | C/o crate Work at shepyada | Flood Control | Bhadela | 150,000 |
| 8 | C/o crate Work at Manderwade | Flood Control | Bhadela | 150,000 |
| 9 | C/o crate Work at Pukharog | Flood Control | Bhadela | 150,000 |
| 10 | C/o protection work at VillTaleie | Flood Control | Bhadela | 150,000 |
| 11 | C/o crate Work at Dugh | Flood Control | Bhadela | 150,000 |
| 12 | C/o Drain at Vill kapal | Flood Control | Bhadela | 200,000 |
| 13 | C/o protection Drain nachnoti | Flood Control | Bhadela | 150,000 |
| 14 | C/o protection Drain Dalund | Flood Control | Bhadela | 150,000 |
| 15 | C/o pond at vill Shukrah | Water Harvesting | Bhadela | 120,000 |
| 16 | C/o protection Drain Ranhetar | Flood Control | Bhadela | 150,000 |
| 17 | C/O Ptotection work at village Halour (PS) | Flood Control | Bhadela | 200,000 |
| 18 | C/o Khadunja Path with Drain Dehrog to Ghambhir | Rural Connectivity | Bhadela | 177,000 |
| Total | 2,677,000 | |||
| 1 | C/o Crate work Jundhawal | Flood Control | Diur | 400,000 |
| 2 | C/o Drain Work Guwadi | Flood Control | Diur | 400,000 |
| 3 | C/o Protection Work Dadba | Flood Control | Diur | 150,000 |
| 4 | C/o Crate work Dhaneli | Flood Control | Diur | 150,000 |
| 5 | C/o Panihara Dhutta | Renovation of Traditional Water Bodies | Diur | 50,000 |
| 6 | C/o Plantation Work Labb | Drought Proofing | Diur | 200,000 |
| 7 | C/o Protection Work Bhinga | Flood Control | Diur | 200,000 |
| 8 | C/o Check dam Vill lab Nalla | Flood Control | Diur | 150,000 |
| 9 | C/o Plantation Work Laggdotta | Drought Proofing | Diur | 150,000 |
| 10 | C/o Drain Work Kihog | Flood Control | Diur | 150,000 |
| 11 | C/o Irrigation tank klanju | Water Harvesting | Diur | 150,000 |
| 12 | C/o Irrigation tank klanju | Water Harvesting | Diur | 150,000 |
| 13 | C/o Plantation Work Shalodi | Drought Proofing | Diur | 150,000 |
| 14 | C/oPanihara at vill Bag | Renovation of Traditional Water Bodies | Diur | 150,000 |
| 15 | C/o Crate work Sidhan | Flood Control | Diur | 150,000 |
| 16 | C/o Crate work at Vill Lab | Flood Control | Diur | 200,000 |
| 17 | C/o Protection Work Dobi | Flood Control | Diur | 200,000 |
| 18 | C/o Protection Work Kareri | Flood Control | Diur | 200,000 |
| 19 | C/O Crate work at village Maru Nalla (PS) | Flood control | Duir | 300,000 |
| 20 | C/o Protection Work Upper Kuthed | Flood Control | Diur | 200,000 |
| 21 | C/o Khadunja Path with Drain Ram Nagar to Bhinga | Rural Connectivity | Diur | 100,000 |
| 22 | C/o Khadunja Path with Drain - Ram Nagar to Judawal | Rural Connectivity | Diur | 188,000 |
| Total | 4,138,000 | |||
| 1 | C/o Panihara at Vil Birwadi | Renovation of Traditional Water Bodies | Lanot | 80,000 |
| 2 | C/o Protection Work at Vill Birwadi | Flood Control | Lanot | 150,000 |
| 3 | C/o Irrigation Tank at Vill Parhed | Water Harvesting | Lanot | 150,000 |
| 4 | C/o Irrigation Tank at Vill Aghar | Water Harvesting | Lanot | 150,000 |
| 5 | C/o Irrigation Tank at Vill Khikhar | Water Harvesting | Lanot | 150,000 |
| 6 | C/o Protection Work at Vill lanot | Flood Control | Lanot | 150,000 |
| 7 | C/o Crate work at Vill Banjla | Flood Control | Lanot | 150,000 |
| 8 | C/o Crate work at Vill Basewa | Flood Control | Lanot | 150,000 |
| 9 | C/o Protection Work at Vill Birwadi | Flood Control | Lanot | 200,000 |
| 10 | C/o Irrigation tank at Notod Biyata | Water Harvesting | Lanot | 150,000 |
| 11 | C/o Panihara at Vill Gharedi | Rural Connectivity | Lanot | 150,000 |
| 12 | C/o Crate work at Vill Bagel | Flood Control | Lanot | 150,000 |
| 13 | C/o Protection Work at Vill Fagdog | Flood Control | Lanot | 150,000 |
| 14 | C/o Crate work at Vill Biyata | Flood Control | Lanot | 150,000 |
| 15 | C/o Crate work at Vill Birwadi | Flood Control | Lanot | 150,000 |
| 16 | C/o Protection Work at Vill Bagel | Flood Control | Lanot | 150,000 |
| 17 | C/o Irrigation tank at Shaklu | Water Harvesting | Lanot | 150,000 |
| 18 | C/o Irrigation tank at Fagdog | Water Harvesting | Lanot | 150,000 |
| 19 | C/o Crate work at Vill Tadgan | Flood Control | Lanot | 150,000 |
| 20 | C/o Irrigation tank at Hallan | Water Harvesting | Lanot | 150,000 |
| 21 | C/o Irrigation tank at vill Ghreddi | Water Harvesting | Lanot | 150,000 |
| 22 | C/o Crate work at Vill Seer | Flood Control | Lanot | 150,000 |
| 23 | C/O Protection work at village Notod (PS) | Flood Control | Lanot | 200,000 |
| 24 | C/o Land dev at Vill Lanot First | Land Development | Lanot | 150,000 |
| 25 | C/o Protection Work at Vill Baroti | Flood Control | Lanot | 150,000 |
| 26 | C/o Protection work at Agahar | Flood Control | Lanot | 200,000 |
| 27 | C/o Khadunja Path with Drain Dibbar to Sirgala | Rural Connectivity | Lanot | 155,000 |
| 28 | C/o Khadunja Path with Drain Main Road to Banjla | Rural Connectivity | Lanot | 37,000 |
| Total | 4,172,000 | |||
| 1 | C/o Panihara at vill Loddli | Renovation of Traditional Water Bodies | Pichhla Diur | 80,000 |
| 2 | C/o crate Work at Kund Nala | Flood Control | Pichhla Diur | 150,000 |
| 3 | C/o Irrigation Tank at Kuppdu | Water Harvesting | Pichhla Diur | 200,000 |
| 4 | C/o crate Work at Dadhwad | Flood Control | Pichhla Diur | 150,000 |
| 5 | C/o crate Work at Bagoli | Flood Control | Pichhla Diur | 200,000 |
| 6 | C/o Land dev at Vill hadiyan | Land Development | Pichhla Diur | 200,000 |
| 7 | C/o crate Work at Notod | Flood Control | Pichhla Diur | 200,000 |
| 8 | C/o crate Work at Loddli | Flood Control | Pichhla Diur | 200,000 |
| 9 | C/o Land dev at Vill shawani | Land Development | Pichhla Diur | 150,000 |
| 10 | C/o Land dev at Vill haddla | Land Development | Pichhla Diur | 150,000 |
| 11 | C/o Crate Work at kulayi | Flood Control | Pichhla Diur | 150,000 |
| 12 | C/o Drain Work at Satoli | Flood Control | Pichhla Diur | 150,000 |
| 13 | C/o Panihara at vill Gulel Seri | Renovation of Traditional Water Bodies | Pichhla Diur | 50,000 |
| 14 | C/O Crate work at village Grohan (PS) | Flood control | Pichhla Diur | 200,000 |
| 15 | C/O Crate work atb village Loudali (PS) | Flood control | Pichhla Diur | 350,000 |
| 16 | C/o Link Road Shalli to Gulel | Rural Connectivity | Pichhla Diur | 400,000 |
| 17 | C/o Link Road - Bagoli to Daloi | Rural Connectivity | Pichhla Diur | 300,000 |
| 18 | C/o Khadunja Path with Drain - Main Road to Grohan - I | Rural Connectivity | Pichhla Diur | 200,000 |
| Total | 3,480,000 | |||
| 1 | C/o Irrigation Kuhal Bharotu nalla to Kandi | Irrigation | Bhalei | 150,000 |
| 2 | C/o Panihara at Village Kanhar | Renovation of Traditional Water Bodies | Bhalei | 100,000 |
| 3 | C/o Crate Work at Village Lahmani | Flood Control | Bhalei | 250,000 |
| 4 | C/o Protection Work at Village Surela | Flood Control | Bhalei | 100,000 |
| 5 | C/o Crate Work at Village Bambeu | Flood Control | Bhalei | 100,000 |
| 6 | C/o Drain Work Mahad 400mtr | Flood Control | Bhalei | 200,000 |
| 7 | C/o Crate Work Kanhar Mahad | Flood Control | Bhalei | 200,000 |
| 8 | C/o Panihara at Village Naled | Renovation of Traditional Water Bodies | Bhalei | 100,000 |
| 9 | C/o Panihara at Village Rasna | Renovation of Traditional Water Bodies | Bhalei | 100,000 |
| 10 | C/o Drain Dhrmunu Majru | Flood Control | Bhalei | 400,000 |
| 11 | C/o Crate Work Talaie | Flood Control | Bhalei | 250,000 |
| 12 | C/o Plantation Work Nallu (Bhalei) | Drought Proofing | Bhalei | 100,000 |
| 13 | C/o Drain at Village Kiyol-II | Flood Control | Bhalei | 500,000 |
| 14 | C/o plantation Work at vill lamani 1st -2nd | Drought Proofing | Bhalei | 150,000 |
| 15 | c/o drain Surella | Flood Control | Bhalei | 400,000 |
| 16 | c/o Panihara Aardi | Renovation of Traditional Water Bodies | Bhalei | 100,000 |
| 17 | C/o Link Road Main Road to Bassa Lamni | Rural Connectivity | Bhalei | 800,000 |
| 18 | C/o Khadunja Path with Drain Talai to Kanhar | Rural Connectivity | Bhalei | 100,000 |
| Total | 4,100,000 | |||
| 1 | C/o Drain at Banotu | Flood Control | Brangal | 100,000 |
| 2 | C/o Drain at Matodu | Flood Control | Brangal | 200,000 |
| 3 | C/o Drain at Brangal-I | Flood Control | Brangal | 300,000 |
| 4 | C/o Crate Work Makan Nala | Flood Control | Brangal | 200,000 |
| 5 | C/o Panihara at Brangal | Renovation of Traditional Water Bodies | Brangal | 100,000 |
| 6 | C/o Crate Work Brangal Nala | Flood Control | Brangal | 200,000 |
| 7 | C/o Protection Work Majhala Sapahan to Nala | Flood Control | Brangal | 100,000 |
| 8 | C/o Drain at Dhudasapad | Flood Control | Brangal | 100,000 |
| 9 | C/o Irrigation Tank Tikkari | Water Harvesting | Brangal | 50,000 |
| 10 | C/o Drain at School to Bharan Babadi | Flood Control | Brangal | 150,000 |
| 11 | C/o Drain at Pijanu | Flood Control | Brangal | 200,000 |
| 12 | C/o Soil Erosion Brangal-I | Flood Control | Brangal | 300,000 |
| 13 | C/O Land Dev. work at village Bhrana (PS) | Land Dev | Brangal | 300,000 |
| 14 | C/o Khadunja Path with Drain Pinjnu to Dharboonu | Rural Connectivity | Brangal | 120,000 |
| 15 | C/o Khadunja Path with Drain Hadla to Rampur | Rural Connectivity | Brangal | 120,000 |
| Total | 2,540,000 | |||
| 1 | C/o Panihara at Village Sapiyara | Renovation of Traditional Water Bodies | Gawalu | 100,000 |
| 2 | C/o Protection Work at Village Maloor | Flood Control | Gawalu | 100,000 |
| 3 | C/o Crate Work at Village Kutt | Flood Control | Gawalu | 200,000 |
| 4 | C/o Irrigation Tank at Village Balhota | Water Harvesting | Gawalu | 80,000 |
| 5 | C/o Protection Work at Village Jatrund-I | Flood Control | Gawalu | 100,000 |
| 6 | C/o Protection Work at Village Bhing | Flood Control | Gawalu | 100,000 |
| 7 | C/o Panihara at Village Pavin | Flood Control | Gawalu | 100,000 |
| 8 | C/o Protection Work at Village Chandi | Irrigation | Gawalu | 200,000 |
| 9 | C/o Irrigation Kuhal at Village Sapiyara | Irrigation | Gawalu | 200,000 |
| 10 | C/o Land Development Work at Village Katbad | Land Development | Gawalu | 250,000 |
| 11 | C/o Protection Work at Village Kupahadi | Flood Control | Gawalu | 150,000 |
| 12 | C/o Protection Work at Village Ghatta | Flood Control | Gawalu | 100,000 |
| 13 | C/o Check Dam & Crate Work Kilod Nala to Dhar | Flood Control | Gawalu | 200,000 |
| 14 | C/o Protection Work at Kadeda | Flood Control | Gawalu | 100,000 |
| 15 | C/o Protection Work at Village Bhatoli | Flood Control | Gawalu | 150,000 |
| 16 | C/o Drain at Village Thanoul | Flood Control | Gawalu | 100,000 |
| 17 | C/o Panihara at Village Dhadot-I | Renovation of Traditional Water Bodies | Gawalu | 100,000 |
| 18 | C/o Crate Work Fangei Ghar | Flood Control | Gawalu | 250,000 |
| 19 | C/o Protection Work at Village Fangei | Flood Control | Gawalu | 250,000 |
| 20 | C/o Crate Work Galu | Flood Control | Gawalu | 300,000 |
| 21 | C/o Khadunja Path with Drain - Dhar to Nahera Nalla | Rural Connectivity | Gawalu | 150,000 |
| 22 | C/o Khadunja Path with Drain - Fangei to Siur | Rural Connectivity | Gawalu | 120,000 |
| Total | 3,400,000 | |||
| 1 | C/o Pond at Village Shukrela | Water Harvesting | Bhandal | 50,000 |
| 2 | C/o Panihara at Thanoti | Renovation of Traditional Water Bodies | Bhandal | 80,000 |
| 3 | C/o Panihara at Bhaint | Renovation of Traditional Water Bodies | Bhandal | 50,000 |
| 4 | C/o Land Development at Langera | Land Development | Bhandal | 150,000 |
| 5 | C/o Crate work at Jaithal | Flood Control | Bhandal | 300,000 |
| 6 | C/o Protection Kulh at Jaithal | Flood Control | Bhandal | 250,000 |
| 7 | C/o Panihara at VillageSanghni | Renovation of Traditional Water Bodies | Bhandal | 60,000 |
| 8 | C/o Panihara at Bhujan | Renovation of Traditional Water Bodies | Bhandal | 60,000 |
| 9 | C/o Panihara at Lahdi Bhitti | Renovation of Traditional Water Bodies | Bhandal | 80,000 |
| 10 | C/o Plantation work at Priyungal | Drought Proofing | Bhandal | 200,000 |
| 11 | C/o Crate work at Drabla | Flood Control | Bhandal | 200,000 |
| 12 | C/o Panihara at Bhalka | Renovation of Traditional Water Bodies | Bhandal | 50,000 |
| 13 | C/o Panihara at Mashad | Renovation of Traditional Water Bodies | Bhandal | 50,000 |
| 14 | C/o Panihara at Puthiyal | Renovation of Traditional Water Bodies | Bhandal | 80,000 |
| 15 | C/o Pond at Jiladi | Water Harvesting | Bhandal | 30,000 |
| 16 | C/o Panihara at Village Bhadei-I | Renovation of Traditional Water Bodies | Bhandal | 50,000 |
| 17 | C/o Panihara at Village Thathi-I | Renovation of Traditional Water Bodies | Bhandal | 50,000 |
| 18 | C/o Pond at Shaloran | Water Harvesting | Bhandal | 40,000 |
| 19 | C/O Crate work at village Rajani (PS) | Flood control | Bhandal | 200,000 |
| 20 | C/O Irrigation Tank at village Bhaint (PS) | Irrigation | Bhandal | 300,000 |
| 21 | C/O Panihara at village Matog (PS) | Traditional water bodies | Bhandal | 150,000 |
| 22 | C/O Irrigation Kuhal village Jalot to padati (PS) | Traditional water bodies | Bhandal | 300,000 |
| 23 | C/O Check Dam at village Jalot (PS) | Flood control | Bhandal | 150,000 |
| 24 | C/O Panihara at village Kodi (PS) | Traditional water bodies | Bhandal | 100,000 |
| 25 | C/o Khadunja Path with Drain - Main Road to GPS Langera | Rural Connectivity | Bhandal | 160,000 |
| 26 | C/o Khadunja Path with Drain at Jiladi | Rural Connectivity | Bhandal | 220,000 |
| 27 | C/o Khadunja Path with Drain Jiladi to Bhalka | Rural Connectivity | Bhandal | 300,000 |
| 28 | C/o Khadunja Path with Drain Matoon to Shamshanghat | Rural Connectivity | Bhandal | 250,000 |
| 29 | C/o Khadunja Path with Drain Main Road to Upper Digodi | Rural Connectivity | Bhandal | 300,000 |
| Total | 3,410,000 | |||
| 1 | C/o Out let Drain at Gadda | Flood Control | Kilod | 150,000 |
| 2 | C/o Protection work at Jakhral | Flood Control | Kilod | 150,000 |
| 3 | C/o Protection work at Chamdu | Flood Control | Kilod | 150,000 |
| 4 | C/o Protection work Kilod Thadal | Flood Control | Kilod | 150,000 |
| 5 | C/o Out let Drain at Dandeta | Flood Control | Kilod | 150,000 |
| 6 | C/o Protection work at Paddi-I,II | Flood Control | Kilod | 200,000 |
| 7 | C/o Panihara at Jakhral | Renovation of Traditional Water Bodies | Kilod | 80,000 |
| 8 | C/o Irrigation Tank at Goth | Water Harvesting | Kilod | 150,000 |
| 9 | C/o Protection work GMS Kilod-II | Flood Control | Kilod | 150,000 |
| 10 | C/o Panihara at Paddi | Renovation of Traditional Water Bodies | Kilod | 80,000 |
| 11 | C/o Protection work at Talai | Flood Control | Kilod | 150,000 |
| 12 | C/o Pond at Drabad | Water Harvesting | Kilod | 100,000 |
| 13 | C/o Protection work at Ruwani | Flood Control | Kilod | 150,000 |
| 14 | C/o Protection work at Roan | Flood Control | Kilod | 150,000 |
| 15 | C/o Protection work at Bharoda-II | Flood Control | Kilod | 150,000 |
| 16 | C/o Panihara at Chamdeu | Renovation of Traditional Water Bodies | Kilod | 80,000 |
| 17 | C/o Outlet Drain at Bharoda | Flood Control | Kilod | 200,000 |
| 18 | C/o Protection work at Chowata Kilod | Flood Control | Kilod | 200,000 |
| 19 | C/o Protection work at Mantu Tribhol | Flood Control | Kilod | 150,000 |
| 20 | C/o Irrigation Tank at Mantu Tribhol | Water Harvesting | Kilod | 150,000 |
| 21 | C/o Protection work Bishubagg | Flood Control | Kilod | 150,000 |
| 22 | C/o Protection work at Nimad | Flood Control | Kilod | 150,000 |
| 23 | C/o Panihara at Kilod | Renovation of Traditional Water Bodies | Kilod | 80,000 |
| 24 | C/o Panihara at Dandeta | Renovation of Traditional Water Bodies | Kilod | 80,000 |
| 25 | C/o Protection work at Gohar Paddi | Flood Control | Kilod | 150,000 |
| 26 | C/o Protection work Gadda | Flood Control | Kilod | 150,000 |
| 27 | C/o Protection work at Banjli | Flood Control | Kilod | 200,000 |
| 28 | C/o Protection work at Thasiyunda | Flood Control | Kilod | 150,000 |
| 29 | C/o Protection work at Jakhral Challi | Flood Control | Kilod | 160,000 |
| 30 | C/o Irrigation Tank at Taplu | Water Harvesting | Kilod | 150,000 |
| 31 | C/O Panihara at Rouni (PS) | Traditional water bodies | Kilod | 200,000 |
| 32 | C/o Protection work at Banjwad | Flood Control | Kilod | 150,000 |
| 33 | C/o Protection work Jakhral Chuwata | Flood Control | Kilod | 150,000 |
| 34 | C/o Khadunja Path with Drain -Ruwani To Tribhol | Rural Connectivity | Kilod | 300,000 |
| 35 | C/o Khadunja Path with Drain - Kilod Rest House to village Kilod | Rural Connectivity | Kilod | 400,000 |
| 36 | C/o Khadunja Path with Drain at Gadda | Rural Connectivity | Kilod | 160,000 |
| Total | 5,670,000 | |||
| 1 | C/o Panihara at Bhulanju | Renovation of Traditional Water Bodies | Sanooh | 60,000 |
| 2 | C/o Panihara at Bithwad-II | Renovation of Traditional Water Bodies | Sanooh | 100,000 |
| 3 | C/o Plantation work at Panchayat Bagicha Sanooh | Drought Proofing | Sanooh | 200,000 |
| 4 | C/o Protection work at Sarwas Sanooh | Flood Control | Sanooh | 150,000 |
| 5 | C/o Land Development at Village Kainthly | Land Development | Sanooh | 150,000 |
| 6 | C/o Land Development at Village Gagal | Land Development | Sanooh | 100,000 |
| 7 | C/o Panihara Kainthly Notodi | Renovation of Traditional Water Bodies | Sanooh | 100,000 |
| 8 | C/o Panihara at Kathiyad | Renovation of Traditional Water Bodies | Sanooh | 80,000 |
| 9 | C/o Protection work at Bhidroh | Flood Control | Sanooh | 150,000 |
| 10 | C/o Protection work at Banjala | Flood Control | Sanooh | 150,000 |
| 11 | C/o Protection work at Chuted | Flood Control | Sanooh | 150,000 |
| 12 | C/o Panihara at VillageChuted | Renovation of Traditional Water Bodies | Sanooh | 100,000 |
| 13 | C/o Panihara at Adap | Renovation of Traditional Water Bodies | Sanooh | 80,000 |
| 14 | C/o Pond at Bhasua-I | Water Harvesting | Sanooh | 150,000 |
| 15 | C/o Panihara Notod Bhasua | Renovation of Traditional Water Bodies | Sanooh | 80,000 |
| 16 | C/o Protection work at Dighog ghala Bhasua | Flood Control | Sanooh | 150,000 |
| 17 | C/o Panihara at Lower Bhasua | Renovation of Traditional Water Bodies | Sanooh | 80,000 |
| 18 | C/o Protection work at Gareli | Flood Control | Sanooh | 150,000 |
| 19 | C/o Panihara at Gareli | Renovation of Traditional Water Bodies | Sanooh | 100,000 |
| 21 | C/o IrrigationTank at Bhasua-II | Water Harvesting | Sanooh | 100,000 |
| 23 | C/o Protection work at Banodi | Flood Control | Sanooh | 150,000 |
| 24 | C/o Panihara at Banodi-II | Renovation of Traditional Water Bodies | Sanooh | 100,000 |
| 25 | C/o Protection work Lower Bhasua | Flood Control | Sanooh | 150,000 |
| 26 | C/o Protection work at Upper Juwans | Flood Control | Sanooh | 150,000 |
| 27 | C/o Land Development at Surkhand | Land Development | Sanooh | 150,000 |
| 28 | C/o IrrigationTank at Bhatoli | Water Harvesting | Sanooh | 100,000 |
| 29 | C/o IrrigationTank at Juwans | Water Harvesting | Sanooh | 100,000 |
| 30 | C/o Protection Kulh at Juwans | Flood Control | Sanooh | 100,000 |
| 31 | C/o Land Development at Bhatoli | Land Development | Sanooh | 150,000 |
| 32 | C/o Protection work at Bhagdiyala | Flood Control | Sanooh | 150,000 |
| 33 | C/o Protection work at Upper Bhatoli | Flood Control | Sanooh | 150,000 |
| 34 | C/o Panihara at Masjid Juwans | Renovation of Traditional Water Bodies | Sanooh | 100,000 |
| 35 | C/o Protection work at Dhoula | Flood Control | Sanooh | 150,000 |
| 36 | C/o Protection work at Shali | Flood Control | Sanooh | 150,000 |
| 37 | C/o Crate work at Gadhetra | Flood Control | Sanooh | 200,000 |
| 38 | C/o Paniahara at Gadhetra | Renovation of Traditional Water Bodies | Sanooh | 100,000 |
| 39 | C/o Protection work at Thundla | Flood Control | Sanooh | 100,000 |
| 40 | C/o Protection work at Badi | Flood Control | Sanooh | 200,000 |
| 41 | C/o Irrigation Tank at Nolsu | Water Harvesting | Sanooh | 150,000 |
| 42 | C/o Panihara at Nolsu | Renovation of Traditional Water Bodies | Sanooh | 100,000 |
| 43 | C/o Panihara at Panoga | Renovation of Traditional Water Bodies | Sanooh | 100,000 |
| 44 | C/o Protection work at Panoga | Flood Control | Sanooh | 250,000 |
| 45 | C/o Protection work at Radholla | Flood Control | Sanooh | 150,000 |
| 46 | C/o Land Development At Chandiyol-II | Land Development | Sanooh | 150,000 |
| 47 | C/o Land Development at Gitwali | Land Development | Sanooh | 150,000 |
| 48 | C/o Pond at Khani | Water Harvesting | Sanooh | 50,000 |
| 49 | C/o Panihara at Puddan | Renovation of Traditional Water Bodies | Sanooh | 50,000 |
| 50 | C/o Paniahara at Sua | Renovation of Traditional Water Bodies | Sanooh | 100,000 |
| 51 | C/o Irrigation Tank at Sua-II | Water Harvesting | Sanooh | 100,000 |
| 52 | C/o Protection work at Darbheran | Flood Control | Sanooh | 150,000 |
| 53 | C/o Panihara at Darbheran | Renovation of Traditional Water Bodies | Sanooh | 100,000 |
| 54 | C/o Protection work at Dulla | Flood Control | Sanooh | 100,000 |
| 55 | C/o Minnor Irrigation Scheme Bhidroh Nallah to Juwans | Irrigation | Sanooh | 500,000 |
| 56 | C/o Crate work at Punhel | Flood Control | Sanooh | 300,000 |
| 57 | C/o Protection work at Badi | Flood Control | Sanooh | 300,000 |
| 58 | C/o Irrigation Tank at VillageKainthly | Water Harvesting | Sanooh | 150,000 |
| 59 | C/o Land Development work at Bhidroh | Land Development | Sanooh | 150,000 |
| 60 | C/o Protection Drain at Bhasua | Flood Control | Sanooh | 150,000 |
| 61 | C/o Panihara at Salan | Renovation of Traditional Water Bodies | Sanooh | 50,000 |
| 62 | C/o Irrigation Tank & Pipe line Darati nallah | Water Harvesting | Sanooh | 300,000 |
| 63 | C/O Crate work at village Dop Adap (PS) | Flood control | Sanooh | 300,000 |
| 64 | C/O Protection work at village Gagal (PS) | Flood control | Sanooh | 200,000 |
| 65 | C/O Protection work at village Sanooh Nalli (PS) | Flood control | Sanooh | 200,000 |
| 66 | C/O Panihara at village Bajala 1-2 (PS) | Flood control | Sanooh | 200,000 |
| 67 | C/O Protection work at village Nollsu (PS) | Flood control | Sanooh | 300,000 |
| 68 | C/O Protection work at Puddan (PS) | Flood control | Sanooh | 300,000 |
| 69 | C/O Panihara at village Punhel (PS) | Flood control | Sanooh | 125,000 |
| 70 | C/o Link road Main Road to SC Village Kainthli | Rural Connectivity | Sanooh | 1,300,000 |
| 71 | C/o Khadunja Path with Drain Upper Juwas to Bhatoli | Rural Connectivity | Sanooh | 160,000 |
| 72 | C/o Khadunja Path with Drain Shallan to Sanoon | Rural Connectivity | Sanooh | 200,000 |
| 73 | C/o Khadunja Path with Drain Gagal Pul to Panoga | Rural Connectivity | Sanooh | 250,000 |
| 74 | C/o Khadunja Path with Drain at Banodi | Rural Connectivity | Sanooh | 150,000 |
| 75 | C/o Khadunja Path with Drain at Gareli | Rural Connectivity | Sanooh | 170,000 |
| 76 | C/o Khadunja Path with Drain at Bhasua | Rural Connectivity | Sanooh | 250,000 |
| 77 | C/o Khadunja Path with Drain at Harijan Basti Dholla | Rural Connectivity | Sanooh | 90,000 |
| 78 | C/o Khadunja Path with Drain at Banjala | Rural Connectivity | Sanooh | 350,000 |
| 79 | C/o Khadunja Path with Drain - Main Road to Nolsu | Rural Connectivity | Sanooh | 200,000 |
| 80 | C/o Khadunja Path with Drain - Bhatoli to Bhasua | Rural Connectivity | Sanooh | 400,000 |
| 81 | C/o Khadunja Path with Drain - Main Road to Kainthly | Rural Connectivity | Sanooh | 220,000 |
| Total | 13,795,000 | |||
| 1 | C/o Crate Work Village vali Nala | Flood Control | Bhunad | 300,000 |
| 2 | C/o Panihara Anoyi | Renovation of Traditional Water Bodies | Bhunad | 50,000 |
| 3 | C/o Crate Work Ulhead 2nd | Flood Control | Bhunad | 150,000 |
| 4 | C/o Land Development Dharu Ram S/o Badri R/o Bhalara IAY | Land Development | Bhunad | 35,000 |
| 5 | C/o Panihar With Tank Panjola | Renovation of Traditional Water Bodies | Bhunad | 70,000 |
| 6 | C/o Protection Drain Bhalara | Flood Control | Bhunad | 150,000 |
| 7 | C/o Crate Work Kapdiah nala | Flood Control | Bhunad | 200,000 |
| 8 | C/o Panihara With Tank Kapdiah | Renovation of Traditional Water Bodies | Bhunad | 70,000 |
| 9 | C/o Link Road main |road To Bhalogi | Rural Connectivity | Bhunad | 500,000 |
| 10 | C/o crate Work Panjola Nala | Flood Control | Bhunad | 150,000 |
| 11 | C/o Land Devlopment Raj Kumar S/o baku R/o Ulhead | Land Development | Bhunad | 35,000 |
| 12 | C/o Land Devlopment mohan Lal S/o hem raj R/o bhalogi | Land Development | Bhunad | 35,000 |
| 13 | C/o Land Devlopment hans Raj S/o baldev R/o bhalogi | Land Development | Bhunad | 35,000 |
| 14 | C/o Protection drain panjola | Flood Control | Bhunad | 150,000 |
| 15 | C/o Land Devlopment Suniti Widow Bhagto R/o Nughwah | Land Development | Bhunad | 35,000 |
| 16 | C/O Irrigation tank at village Panjola (PS) | Irrigation | Bhunad | 150,000 |
| 17 | C/O Crate work at village Kapadia (PS) | Flood control | Bhunad | 200,000 |
| 18 | C/O Crate work at village Bhuned (PS) | Flood control | Bhunad | 200,000 |
| 19 | C/O Tank and Crate work at village Annoi (PS) | Irrigation | Bhunad | 200,000 |
| 20 | C/o Panihara trodi | Renovation of Traditional Water Bodies | Bhunad | 40,000 |
| Total | 2,755,000 | |||
| 1 | C/o Crate Work Nunu nala | Flood Control | Kanged | 400,000 |
| 2 | C/o Crate Work baggi Nala | Flood Control | Kanged | 400,000 |
| 3 | C/o Panihara Tikri | Renovation of Traditional Water Bodies | Kanged | 80,000 |
| 4 | C/O Irrigation tank at village Karue (PS) | Irrigation | Kanged | 300,000 |
| 5 | C/O Irrigation tank at village Parchi (PS) | Irrigation | Kanged | 300,000 |
| 6 | C/O Irrigation tank at village Baggi (PS) | Irrigation | Kanged | 300,000 |
| 7 | C/O Irrigation tank at village Meharan (PS) | Irrigation | Kanged | 300,000 |
| 8 | C/O Protection work at village Mandla (PS) | Flood control | Kanged | 600,000 |
| 9 | C/O Protection work at village Khillgra (PS) | Flood control | Kanged | 600,000 |
| 10 | C/O Check Dam at village Samah (PS) | Flood control | Kanged | 500,000 |
| 12 | C/O Crate work at village Sakdiyah (PS) | Flood control | Kanged | 200,000 |
| 13 | C/O Crate work at village Kufiyani (PS) | Flood control | Kanged | 200,000 |
| 14 | C/o Link Road/Jeepable Road - Baggi to Bassa Village | Rural Connectivity | Kanged | 1,000,000 |
| Total | 5,180,000 | |||
| 1 | C/o Protection Drain Jutrahan | Flood Control | Naddal | 100,000 |
| 2 | C/o Irrigation Tank Doriwan | Water Harvesting | Naddal | 80,000 |
| 3 | C/o Irrigation Tank gatti | Water Harvesting | Naddal | 80,000 |
| 4 | C/o Crate Work nagod Nala | Flood Control | Naddal | 200,000 |
| 5 | C/o Crate Work Pagoi | Flood Control | Naddal | 100,000 |
| 6 | C/o Crate Work Sala nala | Flood Control | Naddal | 120,000 |
| 7 | C/o Irrigation Tank Guhal | Water Harvesting | Naddal | 100,000 |
| 8 | C/o Protection Drain Sarih | Flood Control | Naddal | 200,000 |
| 9 | C/o Irrigation Tank sarih | Water Harvesting | Naddal | 100,000 |
| 10 | c/o Irrigation tank Kunda | Water Harvesting | Naddal | 80,000 |
| 11 | C/o Panihara Sarih | Renovation of Traditional Water Bodies | Naddal | 30,000 |
| 12 | C/o Protection Drain Belnuu | Flood Control | Naddal | 200,000 |
| 13 | C/o Crate work at Jutrahan | Flood Control | Naddal | 300,000 |
| 14 | C/o irrigation Tank Ladnera | Water Harvesting | Naddal | 100,000 |
| 15 | C/o Crate Work Upper Kiyani | Flood Control | Naddal | 100,000 |
| 16 | C/o Protection Drain Atalu | Flood Control | Naddal | 100,000 |
| 17 | C/o Panihara natodi Kiyani | Renovation of Traditional Water Bodies | Naddal | 30,000 |
| 18 | C/o Protection Drain rindoh | Flood Control | Naddal | 300,000 |
| 19 | C/o Protection Drain ||naddal | Flood Control | Naddal | 150,000 |
| 20 | C/o Protection Drain Mihoth | Flood Control | Naddal | 200,000 |
| 21 | C/o Protection Drain Flota To Gadnu | Flood Control | Naddal | 150,000 |
| 22 | C/o Protection Drain Kramog | Flood Control | Naddal | 150,000 |
| 23 | C/o Link Road Seri to Dhigat | Rural Connectivity | Naddal | 150,000 |
| 24 | C/o Protection Drain Kutlu | Flood Control | Naddal | 200,000 |
| 25 | C/o Panihara Seri | Renovation of Traditional Water Bodies | Naddal | 40,000 |
| 26 | c/o Panihara Jhuta | Renovation of Traditional Water Bodies | Naddal | 30,000 |
| 27 | C/o panihara with tank Salot | Renovation of Traditional Water Bodies | Naddal | 70,000 |
| 28 | C/o Protection Drain pagoi | Flood Control | Naddal | 80,000 |
| 29 | C/O Crate work at village Talu (PS) | Flood control | Naddal | 200,000 |
| 30 | C/O Land development work at village Nagod (PS) | Land Dev | Naddal | 400,000 |
| 31 | C/O Land Development work at village Banjal (PS) | Land Dev | Naddal | 400,000 |
| 32 | C/o Khadunja Path with Drain Thall | Rural Connectivity | Naddal | 100,000 |
| Total | 4,640,000 | |||
| 1 | C/O Protection Work at Banwali | Flood Control | Biyana | 200,000 |
| 2 | C/O Protection Drain Hathni to Khamoth Nalla | Flood Control | Biyana | 200,000 |
| 3 | C/O Protection Work at Galiyan | Flood Control | Biyana | 100,000 |
| 4 | C/o Crate Work at Sambhal | Flood Control | Biyana | 200,000 |
| 5 | C/O Water Storage Tank at Kandhla | Water Harvesting | Biyana | 100,000 |
| 6 | C/O Protection Work Khamoth | Flood Control | Biyana | 100,000 |
| 7 | C/O Jeep Road P W D Road to Bhatiyund | Rural Connectivity | Biyana | 500,000 |
| 8 | C/O Protection Work at Bhatiyund | Flood Control | Biyana | 100,000 |
| 9 | C/O Protection Work at Dugh | Flood Control | Biyana | 50,000 |
| 10 | C/O IrrigationTank at Bhangoli | Water Harvesting | Biyana | 50,000 |
| 11 | C/O Crate work at village Shiv Nalla (PS) | Flood control | Biyana | 200,000 |
| 12 | C/O Crate work at village Surgani (PS) | Flood control | Biyana | 300,000 |
| 13 | C/o Protection work at village Saili (PS) | Flood control | Biyana | 300,000 |
| 14 | C/O Crate work at village Kandla (PS) | Flood control | Biyana | 200,000 |
| 15 | C/O Crate Work at Naglori | Flood Control | Biyana | 100,000 |
| 16 | C/O Crate Work at Bhangoli | Flood Control | Biyana | 100,000 |
| 17 | C/o Khadunja Path with Drain Banwali I to Rest House Biana | Rural Connectivity | Biyana | 120,000 |
| 18 | C/o Khadunja Path with Drain Banwali II to Banwali - III | Rural Connectivity | Biyana | 100,000 |
| 19 | C/o Khadunja Path with Drain at Village surgani | Rural Connectivity | Biyana | 170,000 |
| 20 | C/o Khadunja Path with Drain - Main Road to Shiv Nalla | Rural Connectivity | Biyana | 100,000 |
| 21 | C/o Khadunja Path with Drain - Biana to Bus Stand Biana | Rural Connectivity | Biyana | 300,000 |
| 22 | C/o Khadunja Path with Drain - Satar Nalla to Nanglodi | Rural Connectivity | Biyana | 250,000 |
| 23 | C/o Khadunja Path with Drain - Satar Nalla to Sambal Nanglodi | Rural Connectivity | Biyana | 200,000 |
| Total | 4,040,000 | |||
| 1 | C/o Protection Work at Prajna | Flood Control | Dighai | 300,000 |
| 2 | C/o Check Dam at Prajna | Water Harvesting | Dighai | 300,000 |
| 3 | C/o Check Dam At shalei | Water Harvesting | Dighai | 200,000 |
| 4 | C/o Protection work bhedog | Flood Control | Dighai | 200,000 |
| 5 | C/o Protection Work Bhandar | Flood Control | Dighai | 200,000 |
| 6 | C/o Land Development Village Bhedog | Land Development | Dighai | 150,000 |
| 7 | C/o Drain at Natod | Flood Control | Dighai | 150,000 |
| 8 | C/o Drain Work at Chari | Flood Control | Dighai | 150,000 |
| 9 | C/o Protection work at Mandoga | Flood Control | Dighai | 150,000 |
| 10 | C/o Protection Work at Tukred | Flood Control | Dighai | 150,000 |
| 11 | C/o Protection work at inderwal | Flood Control | Dighai | 150,000 |
| 12 | C/o Babdi At Village Suthan | Renovation of Traditional Water Bodies | Dighai | 30,000 |
| 13 | C/o Panihara At Dakhra | Renovation of Traditional Water Bodies | Dighai | 100,000 |
| 14 | C/o Irrigation Tank at Bhedog | Water Harvesting | Dighai | 100,000 |
| 15 | C/o Panihara at Shall | Renovation of Traditional Water Bodies | Dighai | 100,000 |
| 16 | C/o Crate Work at Suthan | Flood Control | Dighai | 150,000 |
| 17 | C/o Irrigation Tank Natod | Water Harvesting | Dighai | 100,000 |
| 18 | C/o Khadunja Path with Drain at Bhedog | Rural Connectivity | Dighai | 125,000 |
| 19 | C/o Khadunja Path with Drain at Bhedog to GMS Bhandar | Rural Connectivity | Dighai | 300,000 |
| Total | 3,105,000 | |||
| 1 | C/o Crate Work Manjeer Panchyat Ghar | Flood Control | Manjeer | 300,000 |
| 2 | C/o Irrigation Tank at Pantah | Water Harvesting | Manjeer | 150,000 |
| 3 | C/o Irrigation Tank at Kotta | Water Harvesting | Manjeer | 150,000 |
| 4 | C/o Panihara & Tank at Tallota | Renovation of Traditional Water Bodies | Manjeer | 200,000 |
| 5 | C/o Irrigation Tank at Nanan | Water Harvesting | Manjeer | 200,000 |
| 6 | C/o Irrigation Tank at jusav | Water Harvesting | Manjeer | 200,000 |
| 7 | C/o Irrigation Tank at Dhanawal | Water Harvesting | Manjeer | 200,000 |
| 8 | C/o Land Development At Ranu | Land Development | Manjeer | 150,000 |
| 9 | C/o Check Dam at Kasar Nalla | Flood Control | Manjeer | 200,000 |
| 10 | C/o Drain at Kotta | Flood Control | Manjeer | 200,000 |
| 11 | C/o Irrigation Tank at Drabad | Water Harvesting | Manjeer | 200,000 |
| 12 | C/o Crate Work at Nanan Nalla | Flood Control | Manjeer | 200,000 |
| 13 | C/o Protection Work Opriyanu | Flood Control | Manjeer | 150,000 |
| 14 | C/o Drain at Jalpani | Flood Control | Manjeer | 150,000 |
| 15 | C/o Link Road Nanan to Manjeer | Rural Connectivity | Manjeer | 200,000 |
| 16 | C/o Link Road gangla to Malan | Rural Connectivity | Manjeer | 100,000 |
| 17 | C/o Tank at Jasav Nalla (PS) | Irrigation | Manjeer | 200,000 |
| 18 | C/O Crate work & Panhira at village Kadola (PS) | Flood Control | Manjeer | 200,000 |
| 19 | C/o Drain at Pantah -2 | Flood Control | Manjeer | 150,000 |
| 20 | C/o Link Road - Main Road to Gangla | Rural Connectivity | Manjeer | 500,000 |
| 21 | C/o Khadunja Path with Drain - Jusav to GPS Kassar | Rural Connectivity | Manjeer | 139,000 |
| 22 | C/o Khadunja Path with Drain at Jusav | Rural Connectivity | Manjeer | 170,000 |
| 23 | C/o Khadunja Path with Drain Gangla II to Kandola | Rural Connectivity | Manjeer | 180,000 |
| 24 | C/o Khadunja Path with Drain at village Upranu | Rural Connectivity | Manjeer | 100,000 |
| Total | 4,589,000 | |||
| 1 | C/o Panihara At Salwin (Bhadwani) | Renovation of Traditional Water Bodies | Cheeh | 100,000 |
| 2 | C/o Protection Work Panchyat Ghar Cheeh | Flood Control | Cheeh | 150,000 |
| 3 | C/o Nursary At Shidyalu | Drought Proofing | Cheeh | 150,000 |
| 4 | C/o Panihara At Cheeh | Renovation of Traditional Water Bodies | Cheeh | 60,000 |
| 5 | C/o Crate Work At GPS Himgiri | Flood Control | Cheeh | 150,000 |
| 6 | C/o Soil Consarvation At Village Biyotan | Flood Control | Cheeh | 150,000 |
| 7 | C/o Protection Work At Khakdi | Flood Control | Cheeh | 150,000 |
| 8 | C/o Drain At kaliyass | Flood Control | Cheeh | 150,000 |
| 9 | C/o Protection Work At Village Padhari | Flood Control | Cheeh | 150,000 |
| 10 | C/o Panihara At Biyotan | Renovation of Traditional Water Bodies | Cheeh | 100,000 |
| 11 | C/o Protection Work At Shidyalu I | Flood Control | Cheeh | 150,000 |
| 12 | C/o Crate Work At Dhabbi | Flood Control | Cheeh | 150,000 |
| 13 | C/o Protection Work Guwadi | Flood Control | Cheeh | 150,000 |
| 14 | C/o Crate Work At Chalotu | Flood Control | Cheeh | 150,000 |
| 15 | C/o Panihara At Bhadwani | Renovation of Traditional Water Bodies | Cheeh | 150,000 |
| 16 | C/o Drain At Bhadwani | Flood Control | Cheeh | 150,000 |
| 17 | C/o Panihara At Village Maloei | Renovation of Traditional Water Bodies | Cheeh | 150,000 |
| 18 | C/o Link Road At Dhabi To Sukhdhar | Rural Connectivity | Cheeh | 150,000 |
| 19 | C/o Irrigation Tank At Maloei | Water Harvesting | Cheeh | 100,000 |
| 20 | C/o Irrigation Tank At Cheeh -I | Water Harvesting | Cheeh | 100,000 |
| 21 | C/o Protection Work At Shidyalu -II | Flood Control | Cheeh | 150,000 |
| 22 | C/o Panihara At Shidyalu (Padharotu) | Renovation of Traditional Water Bodies | Cheeh | 70,000 |
| 23 | C/o Protection Work At Kaliyas | Flood Control | Cheeh | 150,000 |
| 24 | C/O Protection work & crate work at village Salwan (PS) | Flood Control | Cheeh | 300,000 |
| 25 | C/o Land Development at Radu Shadiyalu (IRDP No 646157) | Land Development | Cheeh | 300,000 |
| Total | 3,680,000 | |||
| 1 | C/o Irrigation Scheme Khandyaru Nalla to Dulara | Irrigation | Himgiri | 150,000 |
| 2 | C/o Panihara Kuhog | Renovation of Traditional Water Bodies | Himgiri | 60,000 |
| 3 | C/o Crate Work Khandyaru Stage III | Flood Control | Himgiri | 150,000 |
| 4 | C/o Crate Work Ladhodi | Flood Control | Himgiri | 150,000 |
| 5 | C/o Crate Work Kuhag Kindra Ghara | Flood Control | Himgiri | 200,000 |
| 6 | C/o Protection Wall Tikri II | Flood Control | Himgiri | 150,000 |
| 7 | C/o Crate Work Kundi II | Flood Control | Himgiri | 150,000 |
| 8 | C/o Crate Work at Kasturba Gandhi Hostel Himgiri Kothi | Flood Control | Himgiri | 150,000 |
| 9 | C/o Irrigation Tank & Pipeline at Seri | Water Harvesting | Himgiri | 250,000 |
| 10 | C/o Protection Drain Akhodu | Flood Control | Himgiri | 150,000 |
| 11 | C/o Protection Drain Achui | Flood Control | Himgiri | 150,000 |
| 12 | C/o Protection Work with Pacci Gali Achoi | Flood Control | Himgiri | 150,000 |
| 13 | C/o Land Development Villge Kundi I | Land Development | Himgiri | 150,000 |
| 14 | C/o Land Development Work Diyotnar | Land Development | Himgiri | 150,000 |
| Total | 2,160,000 | |||
| 1 | C/o Panihara At Kundi SC | Renovation of Traditional Water Bodies | Khadjota | 100,000 |
| 2 | C/o Panihara At Molan | Renovation of Traditional Water Bodies | Khadjota | 100,000 |
| 3 | C/o Link Road At Jhajja To Siunl Pul | Rural Connectivity | Khadjota | 150,000 |
| 4 | C/o Link Road Bhadog To Lahara | Rural Connectivity | Khadjota | 200,000 |
| 5 | C/o Link Road Lahra To Malhola | Rural Connectivity | Khadjota | 300,000 |
| 6 | C/o Link Road At Bhadog To Baya Kupad At Lahra | Rural Connectivity | Khadjota | 300,000 |
| 7 | C/o Plantation At Lamhota Ghara | Drought Proofing | Khadjota | 300,000 |
| 8 | C/o Link Road At Main Road To Jaglala | Rural Connectivity | Khadjota | 300,000 |
| 9 | C/o Panihara At Siunl | Renovation of Traditional Water Bodies | Khadjota | 100,000 |
| 10 | C/o Link Road At Dhalla To Jaglala | Rural Connectivity | Khadjota | 150,000 |
| 11 | C/o Link Road Jaglala To Dugoei | Rural Connectivity | Khadjota | 150,000 |
| 12 | C/O Protection drain ladar (PS) | Flood Control | Khadjota | 300,000 |
| 13 | C/O Protection work at village Yandiyot (PS) | Flood Control | Khadjota | 300,000 |
| 14 | C/o Panihara At Lader | Renovation of Traditional Water Bodies | Khadjota | 100,000 |
| 15 | C/o Protection Work At Shagla | Flood Control | Khadjota | 150,000 |
| 16 | C/o Khadunja Path with Drain - Mandroga | Rural Connectivity | Khadjota | 186,000 |
| 17 | C/o Khadunja Path with Drain - Banjedu | Rural Connectivity | Khadjota | 200,000 |
| Total | 3,386,000 | |||
| 1 | C/o Minor Irrigation Scheme at Village Goth | Irrigation | Drekadi | 150,000 |
| 2 | C/o Land Protection at Village Goth | Land Development | Drekadi | 150,000 |
| 3 | C/o Land Development At Village Saleida | Land Development | Drekadi | 150,000 |
| 4 | C/o Land Protection at Village Alanoon-I | Land Development | Drekadi | 300,000 |
| 5 | C/o Panihara at Village Rahnoti-II | Renovation of Traditional Water Bodies | Drekadi | 50,000 |
| 6 | C/o Land Development At Village Shali Bajmouta | Land Development | Drekadi | 200,000 |
| 7 | C/o Crate Work at Bajmouta-I | Flood Control | Drekadi | 300,000 |
| 8 | C/o Minor Irrigation Scheme at Village Choura | Irrigation | Drekadi | 300,000 |
| 9 | C/o Protection Kuhal at Rana Chouga to Naryadu | Flood Control | Drekadi | 150,000 |
| 10 | C/o Water Storege Tank at Village Khankud-I | Water Harvesting | Drekadi | 50,000 |
| 11 | C/O Land developmen work at village Sarar(Dhuga) (PS) | Land Dev | Drekadi | 300,000 |
| 12 | C/o Land Development At Village Kachiyund | Land Development | Drekadi | 300,000 |
| 13 | C/o Khadunja Path with Drain Kachhiyund to Satoli Nalla | Rural Connectivity | Drekadi | 177,000 |
| Total | 2,577,000 | |||
| 1 | C/o Irrigation Tank Parla Ladwah | Water Harvesting | Ligga | 80,000 |
| 2 | C/o Panihara at Village Ladwah | Renovation of Traditional Water Bodies | Ligga | 60,000 |
| 3 | C/o Crate Work at Village Ladwah | Flood Control | Ligga | 150,000 |
| 4 | C/o Protection Work at Village Halela | Flood Control | Ligga | 100,000 |
| 5 | C/o Irrigation Tank & Pipe Line at Village Sandhi | Water Harvesting | Ligga | 150,000 |
| 6 | C/o Irrigation Tank at Village Halela | Water Harvesting | Ligga | 100,000 |
| 7 | C/o Irrigation Tank at Village Rolka | Water Harvesting | Ligga | 100,000 |
| 8 | C/o Protection Kuhal at Village Halela | Flood Control | Ligga | 100,000 |
| 9 | C/o Irrigation Tank at Village Draman (Ligga) | Water Harvesting | Ligga | 100,000 |
| 10 | C/o Irrigation Tank at Village Choau-II | Water Harvesting | Ligga | 120,000 |
| 11 | C/o Creat Work at Village Choau-II | Flood Control | Ligga | 150,000 |
| 12 | C/o Creat Work at Village Ligga | Flood Control | Ligga | 150,000 |
| 13 | C/o Irrigation Tank at Village Darbhunni | Water Harvesting | Ligga | 100,000 |
| 14 | C/o Protection Kuhal at Village Salwani | Flood Control | Ligga | 150,000 |
| 15 | C/o Land Development At Village Salwani | Land Development | Ligga | 150,000 |
| 16 | C/o Creat Work at Village Salot | Flood Control | Ligga | 150,000 |
| 17 | C/o Creat Work at Darbhunni | Flood Control | Ligga | 150,000 |
| 18 | C/o Irrigation Tank at Village Aterna | Water Harvesting | Ligga | 100,000 |
| 19 | C/o Irrigation Tank at Village Dhaleu | Water Harvesting | Ligga | 100,000 |
| 20 | C/o Protection Work at Village Dighaie | Flood Control | Ligga | 150,000 |
| 21 | C/o Irrigation Tank at Village Dighaie | Water Harvesting | Ligga | 120,000 |
| 22 | C/o Irrigation Tank at Village Kasuni | Water Harvesting | Ligga | 100,000 |
| 23 | C/o Irrigation Kuhal at Village Kasuni | Water Harvesting | Ligga | 150,000 |
| 24 | C/o Protection Work at Village Kasuni | Flood Control | Ligga | 150,000 |
| 25 | C/o Irrigation Tank at Village Choue | Water Harvesting | Ligga | 150,000 |
| 26 | C/O Land Dev. work at village Katara & Chhambar (PS) | Land Dev | Ligga | 400,000 |
| 27 | C/O Drain from upper Ladwah to road at village ligga (PS) | Flood control | Ligga | 200,000 |
| 28 | C/o Irrigation Tank at Village Salot | Water Harvesting | Ligga | 100,000 |
| 29 | C/o Khadunja Path with Drain Ligga to Gahli | Rural Connectivity | Ligga | 160,000 |
| 30 | C/o Khadunja Path with Drain -Salot to Kasooni | Rural Connectivity | Ligga | 200,000 |
| Total | 4,140,000 | |||
| 1 | C/o Irrigation Tank & Pipe Line at Village Padhar | Water Harvesting | Siyula | 150,000 |
| 2 | C/o Protection Kuhal at Village Sarar | Flood Control | Siyula | 150,000 |
| 3 | C/o Irrigation Tank at Village Shala | Water Harvesting | Siyula | 100,000 |
| 4 | C/o Proctetion Kuhal at Village Shala | Flood Control | Siyula | 150,000 |
| 5 | C/o Creat Work at Khagla Nala | Flood Control | Siyula | 150,000 |
| 6 | c/o Panihara at Village Kulhala | Renovation of Traditional Water Bodies | Siyula | 60,000 |
| 7 | C/o Crate Work at Shali | Flood Control | Siyula | 150,000 |
| 8 | C/o Land Development At Village Kund Padher | Land Development | Siyula | 200,000 |
| 9 | C/o Panihara at Village Gadda | Renovation of Traditional Water Bodies | Siyula | 60,000 |
| 10 | C/o Creat Work at Village Dhanawal | Flood Control | Siyula | 150,000 |
| 11 | C/o Panihara at Village Tikree | Renovation of Traditional Water Bodies | Siyula | 60,000 |
| 12 | C/o Irrigation Tank with Pipe Line Janderghodi (Siula) | Water Harvesting | Siyula | 150,000 |
| 13 | Plantation work at village Jaloie (PS) | Drought proof | Siyula | 300,000 |
| 14 | C/o Protection Kuhal at Village Padhar-II | Flood Control | Siyula | 250,000 |
| 15 | C/o Khadunja Path with Drain Jatiyah to Drabadi | Rural Connectivity | Siyula | 150,000 |
| 16 | C/o Link Road/Jeepable Road - Main Road to Sarar | Rural Connectivity | Siyula | 1,000,000 |
| 17 | C/o Link Road/Jeepable Road - Main Road to Sarola | Rural Connectivity | Siyula | 500,000 |
| 18 | C/o Khadunja Path with Drain Siyula to Shamshanghat | Rural Connectivity | Siyula | 150,000 |
| 19 | C/o Khadunja Path with Drain GMS Sarar to Add | Rural Connectivity | Siyula | 100,000 |
| Total | 3,980,000 | |||
| 1 | C/o Crate Work Kangel | Flood Control | Dand | 250,000 |
| 2 | C/o Protection Work falanju | Flood Control | Dand | 180,000 |
| 3 | C/o Drain Work Tiloga | Flood Control | Dand | 150,000 |
| 4 | C/o Panihara Dobi | Renovation of Traditional Water Bodies | Dand | 60,000 |
| 5 | C/o Irrigation Tank Tiloga Serri | Water Harvesting | Dand | 300,000 |
| 6 | C/o Plantation Work Serri | Drought Proofing | Dand | 80,000 |
| 7 | C/o Protection Work Khandwala | Flood Control | Dand | 200,000 |
| 8 | C/o Protection Khul Chakhoter | Flood Control | Dand | 600,000 |
| 9 | C/o Irrigation Tank Kandwala | Water Harvesting | Dand | 400,000 |
| 10 | C/o Panihara Molkihar | Renovation of Traditional Water Bodies | Dand | 60,000 |
| 11 | C/o Panihara Girwani | Renovation of Traditional Water Bodies | Dand | 80,000 |
| 12 | C/o Drain Work Dharyani | Flood Control | Dand | 200,000 |
| 13 | C/o Drain Work Chaploga | Flood Control | Dand | 100,000 |
| 14 | C/o Irrigation Tank Theba | Water Harvesting | Dand | 100,000 |
| 15 | C/o Irrigation Tank Dobi | Water Harvesting | Dand | 80,000 |
| 16 | C/o Panihara Bhadol | Renovation of Traditional Water Bodies | Dand | 50,000 |
| 17 | C/o Drain Work village Poona | Flood Control | Dand | 50,000 |
| 18 | C/o Crate Work Vill Poona | Flood Control | Dand | 250,000 |
| 19 | C/o Drain Work Bhadol | Flood Control | Dand | 400,000 |
| 20 | C/o Jeepable Road Shakloei Nalla to Bhadol | Rural Connectivity | Dand | 600,000 |
| 21 | C/o Panihara Poona-II | Renovation of Traditional Water Bodies | Dand | 80,000 |
| 22 | C/o Panihara Chakhdi | Renovation of Traditional Water Bodies | Dand | 60,000 |
| 23 | C/o Irrigation Tank Chakhdi With Pipe Line | Water Harvesting | Dand | 60,000 |
| 24 | C/o Drain Work Haloori | Flood Control | Dand | 400,000 |
| 25 | C/o Irrigation Kuhul Sindla | Water Harvesting | Dand | 500,000 |
| 26 | C/o Drain Work Bhigater | Flood Control | Dand | 400,000 |
| 27 | C/o Plantation Work Village Molkihar | Drought Proofing | Dand | 400,000 |
| 28 | C/o Irrigation Tank Molkihar-II | Water Harvesting | Dand | 100,000 |
| 29 | C/o Crate Work Molkihar | Flood Control | Dand | 250,000 |
| 30 | C/o Panihara Kundal-I | Renovation of Traditional Water Bodies | Dand | 100,000 |
| 31 | C/O Crate work at village Bhukdia (PS) | Flood control | Dand | 300,000 |
| 32 | C/O Protection work at village Jalaha (PS) | Flood control | Dand | 300,000 |
| 33 | C/O Protection work to kuhal at village mangali (PS) | Flood control | Dand | 300,000 |
| 34 | C/O water dranage Kuhal at village Dori to Dori Nallah (PS) | Flood control | Dand | 100,000 |
| 35 | C/o Panihara Wanu | Renovation of Traditional Water Bodies | Dand | 80,000 |
| 36 | C/o Land Development & Irrigation Tank Tiloga | Land Development | Dand | 300,000 |
| 37 | C/o Khadunja Path with Drain Middle School to Hullar | Rural Connectivity | Dand | 200,000 |
| 38 | C/o Khadunja Path with Drain Dugsu Nalla to Kundal | Rural Connectivity | Dand | 300,000 |
| 39 | C/o Khadunja Path with Drain Hullar to Dhobi | Rural Connectivity | Dand | 200,000 |
| Total | 8,620,000 | |||
| 1 | C/o Crate Work Khedi Village Kundolu | Flood Control | Kandhwara | 300,000 |
| 2 | C/o Irrigation Tank Sarotu | Water Harvesting | Kandhwara | 100,000 |
| 3 | C/o Crate Work Vill Papod Nsalla | Flood Control | Kandhwara | 300,000 |
| 4 | C/o Drain Work Vill Kilooni | Flood Control | Kandhwara | 250,000 |
| 5 | C/o Crate Work Vill Dobhru | Flood Control | Kandhwara | 250,000 |
| 6 | C/o Crate Work Chandi Nalla | Flood Control | Kandhwara | 150,000 |
| 7 | C/o Drain Work Candi-II | Flood Control | Kandhwara | 200,000 |
| 8 | C/o Protection Work Vill Billa (Prem Lal) | Flood Control | Kandhwara | 150,000 |
| 9 | C/o Drain Work Shalei | Flood Control | Kandhwara | 300,000 |
| 10 | C/o Drain Work Papod | Flood Control | Kandhwara | 300,000 |
| 11 | C/o Irrigation Tank Hirnota | Water Harvesting | Kandhwara | 100,000 |
| 12 | C/o Crate Work Kilooni | Flood Control | Kandhwara | 450,000 |
| 13 | C/o Drain Work Kilooni | Flood Control | Kandhwara | 250,000 |
| 14 | C/o Irrigation Tank Chandi | Water Harvesting | Kandhwara | 100,000 |
| 15 | C/o Irrigation Tank Gadesru | Water Harvesting | Kandhwara | 100,000 |
| 16 | C/o Irrigation Tank Nabnod | Water Harvesting | Kandhwara | 100,000 |
| 17 | C/o Drain Work Kotla | Flood Control | Kandhwara | 250,000 |
| 18 | C/o Drain Work Vill Seru | Flood Control | Kandhwara | 200,000 |
| 19 | C/o Crate work Vill kut | Flood Control | Kandhwara | 150,000 |
| 20 | C/o Drain Work Vill Laran | Flood Control | Kandhwara | 150,000 |
| 21 | C/o Crate Work Laran | Flood Control | Kandhwara | 200,000 |
| 22 | C/o Drain Work Jandrei | Flood Control | Kandhwara | 150,000 |
| 23 | C/o Drain Work Shanni | Flood Control | Kandhwara | 400,000 |
| 24 | C/o Crate Work Halela | Flood Control | Kandhwara | 350,000 |
| 25 | C/o Drain Work Halela | Flood Control | Kandhwara | 200,000 |
| 26 | C/o Link Raod Kilooni to Fatti | Rural Connectivity | Kandhwara | 200,000 |
| 27 | C/o Crate Work maniyoga Moher Singh | Flood Control | Kandhwara | 400,000 |
| 28 | C/O Crate work at village Salai(Drabad) (PS) | Flood control | Kandhwara | 300,000 |
| 29 | C/O Crate work at villaga Shaini (PS) | Flood control | Kandhwara | 300,000 |
| 30 | C/o Crate Work vill Malooni | Flood Control | Kandhwara | 250,000 |
| 31 | C/O Khadunja Path with drain at village Kandhwara | Rural Connectivity | Kandhwara | 70000 |
| 32 | C/O Khadunja Path with drain at village Khedi | Rural Connectivity | Kandhwara | 250000 |
| 33 | C/o Khadunja Path with Drain Lakhnota | Rural Connectivity | Kandhwara | 70,000 |
| Total | 7,290,000 | |||
| 1 | C/o Protection Work Cholindi -I-II | Flood Control | Kihar | 250,000 |
| 2 | C/o Protection Work Jandrei -I-II | Flood Control | Kihar | 350,000 |
| 3 | C/o Crate Work Shamshan Ghat Deghi | Flood Control | Kihar | 300,000 |
| 4 | C/o Protection Work Panchyat Ghar Kihar | Flood Control | Kihar | 300,000 |
| 5 | C/o Protection Work Binseer Panihara | Flood Control | Kihar | 200,000 |
| 6 | C/o Panihara Dand II | Renovation of Traditional Water Bodies | Kihar | 80,000 |
| 7 | C/o Protection Drain Drabli to Madpnihar | Flood Control | Kihar | 350,000 |
| 8 | C/o Crate Work Kalhuwa Adwar | Flood Control | Kihar | 300,000 |
| 9 | C/o Irrigation Tank with Pipe Line Vill Drabli | Water Harvesting | Kihar | 250,000 |
| 10 | C/o Protection Work Lahwa | Flood Control | Kihar | 250,000 |
| 11 | C/o Crate Work Triglooni | Flood Control | Kihar | 300,000 |
| 12 | C/o Irrigation Tank with Pipe Line Vill Drad to Dader | Water Harvesting | Kihar | 250,000 |
| 13 | C/o Panihara Lanot(Drabli) | Renovation of Traditional Water Bodies | Kihar | 800,000 |
| 14 | C/o Land Development Alas-II | Land Development | Kihar | 200,000 |
| 15 | C/o Panihar Alas | Renovation of Traditional Water Bodies | Kihar | 100,000 |
| 16 | C/o Drain Work Sandra | Flood Control | Kihar | 200,000 |
| 17 | C/o Protection Work Maddi to Kandu | Flood Control | Kihar | 400,000 |
| 18 | C/o Irrigation Tank With Pipe Line Khani | Water Harvesting | Kihar | 300,000 |
| 19 | C/o Irrigation Tank With Pipe Line Genhetra | Water Harvesting | Kihar | 300,000 |
| 20 | C/o Irrigation Kuhul Drobdi Nalla to Bag | Irrigation | Kihar | 250,000 |
| 21 | C/o Panihara Shakriyana | Renovation of Traditional Water Bodies | Kihar | 80,000 |
| 22 | C/o Protection Work Sarog -II | Flood Control | Kihar | 250,000 |
| 23 | C/o Protection Drain Dand to Adana | Flood Control | Kihar | 350,000 |
| 24 | C/o Protection Work Cholindi | Flood Control | Kihar | 250,000 |
| 25 | C/o Irrigation Tank With Pipe Line Dand | Water Harvesting | Kihar | 300,000 |
| 26 | C/o Panihara Kunda | Renovation of Traditional Water Bodies | Kihar | 100,000 |
| 27 | C/o Panihara Dhadunja | Renovation of Traditional Water Bodies | Kihar | 100,000 |
| 28 | C/o Protection Work Bidwad | Flood Control | Kihar | 200,000 |
| 29 | C/o Panihara Rajindu | Renovation of Traditional Water Bodies | Kihar | 100,000 |
| 30 | C/o Check Dam Thentha | Flood Control | Kihar | 200,000 |
| 31 | C/o Irrigation Tank Bad -II | Water Harvesting | Kihar | 150,000 |
| 32 | C/o Protection Work Didoter Nabtod | Flood Control | Kihar | 200,000 |
| 33 | C/o Check Dam Shitha Nalla | Flood Control | Kihar | 250,000 |
| 34 | C/O Crate work at village Dedotra Rakh (PS) | Flood control | Kihar | 400,000 |
| 35 | C/o Protection wark at village Rajindoo (PS) | Flood control | Kihar | 400,000 |
| 36 | C/O Irrigation Channal Saroga nallah to Panchyat Ghar (PS) | Irrigation | Kihar | 600,000 |
| 37 | C/O Irrigation Channal at village Puddan (PS) | Irrigation | Kihar | 400,000 |
| 38 | C/o Panihara Dhadunja | Renovation of Traditional Water Bodies | Kihar | 200,000 |
| 39 | C/o Crate Work Sarog | Flood Control | Kihar | 300,000 |
| 40 | C/o Khadunja Path with Drain - Kashiri to Langoi | Rural Connectivity | Kihar | 133,000 |
| 41 | C/o Khadunja Path with Drain at Dand | Rural Connectivity | Kihar | 180,000 |
| 42 | C/o Khadunja Path with Drain at Sundra | Rural Connectivity | Kihar | 150,000 |
| 43 | C/o Khadunja Path with Drain at Taintha | Rural Connectivity | Kihar | 246,000 |
| 44 | C/o Khadunja Path with Drain -Sarog to Dighi | Rural Connectivity | Kihar | 250,000 |
| 45 | C/O Khadunja Path with drain at Alash to Kuned | Rural Connectivity | Kihar | 200000 |
| 46 | C/O Khadunja Path with drain Kashiri to Suil | Rural Connectivity | Kihar | 200000 |
| 47 | C/O Khadunja Path with drain Main road to Kashiri | Rural Connectivity | Kihar | 200000 |
| 48 | C/O Khadunja Path with drain at Kapraid | Rural Connectivity | Kihar | 189000 |
| 49 | C/O Khadunja Path with drain Main road to lower Seri | Rural Connectivity | Kihar | 100000 |
| 50 | C/O Khadunja Path with drain at Kandoh | Rural Connectivity | Kihar | 182000 |
| 51 | C/O Khadunja Path with drain at Seri | Rural Connectivity | Kihar | 150000 |
| 52 | C/O Khadunja Path with drain Kuned to Jadotar | Rural Connectivity | Kihar | 300000 |
| 53 | C/O Khadunja Path with drainMad panihara to Kapraid | Rural Connectivity | Kihar | 280000 |
| 54 | C/O Khadunja Path with drain kapraid to Langoie | Rural Connectivity | Kihar | 250000 |
| 55 | C/o Khadunja Path with Drain Uchanu to That | Rural Connectivity | Kihar | 170,000 |
| Total | 13,740,000 | |||
| 1 | C/o Protection Kuhal at Lalmatti | Flood Control | Karwal | 150,000 |
| 2 | C/o Panihara at Dolu | Renovation of Traditional Water Bodies | Karwal | 80,000 |
| 3 | C/o Panihara at Banjni | Renovation of Traditional Water Bodies | Karwal | 80,000 |
| 4 | C/o Protection Kuhal at Jagot | Flood Control | Karwal | 150,000 |
| 5 | C/o Panihara at Charena | Renovation of Traditional Water Bodies | Karwal | 90,000 |
| 6 | C/o Panihara at Village Nangali | Renovation of Traditional Water Bodies | Karwal | 80,000 |
| 7 | C/o Crate work at Killer Ghara | Flood Control | Karwal | 200,000 |
| 8 | C/o Crate work at Nangali | Flood Control | Karwal | 150,000 |
| 9 | C/o Land Development at Karwal (Krishan S/o Prithi) | Land Development | Karwal | 150,000 |
| 10 | C/o Panihara at Siyar | Renovation of Traditional Water Bodies | Karwal | 80,000 |
| 11 | C/o Crate work at Bani | Flood Control | Karwal | 150,000 |
| 12 | C/O Crate work at village Kalwaha 1-2&3 (PS) | Flood control | Karwal | 500,000 |
| 13 | C/O Irrigation Tank at village tikkar (PS) | Irrigation | Karwal | 400,000 |
| 14 | C/O Irrigation tank at village Bihali (PS) | Irrigation | Karwal | 300,000 |
| 15 | C/o Irrigation Tank at Gadleyi | Water Harvesting | Karwal | 90,000 |
| 16 | C/o Drain at Samoth | Flood Control | Karwal | 180,000 |
| 17 | C/o Drain at Sanog | Flood Control | Karwal | 150,000 |
| 18 | C/o Khadunja Path with Drain | Rural Connectivity | Karwal | 230,000 |
| Total | 3,210,000 | |||
| 1 | C/o Crate work at wahnu nali | Flood Control | Salwan | 300,000 |
| 2 | C/o Panihara at Kinoda | Flood Control | Salwan | 100,000 |
| 3 | C/o Protection work at Bindokhi | Flood Control | Salwan | 150,000 |
| 4 | C/o Protection work at Dehloi | Flood Control | Salwan | 150,000 |
| 5 | C/o Drain at Banjodi | Flood Control | Salwan | 150,000 |
| 6 | C/o Protection work at Fakku | Flood Control | Salwan | 150,000 |
| 7 | C/o land development at Shel | Land Development | Salwan | 200,000 |
| 8 | C/o Protection drain Bahanu to Gajwani | Flood Control | Salwan | 300,000 |
| 9 | C/o Drain at Salwan 1 | Flood Control | Salwan | 200,000 |
| 10 | C/o Crate work at Maha kali mode | Flood Control | Salwan | 300,000 |
| 11 | C/o Protection work at Talunj | Flood Control | Salwan | 150,000 |
| 12 | C/o Irrigation Tank at Fakku | Water Harvesting | Salwan | 100,000 |
| 13 | C/o Crate work Kothi nala | Flood Control | Salwan | 300,000 |
| 14 | C/o Protection work at Birnaal | Flood Control | Salwan | 150,000 |
| 15 | C/o Drain at Kothi | Flood Control | Salwan | 150,000 |
| 16 | C/o Irrigation Tank at village Orka (PS) | Irrigation | Salwan | 200,000 |
| 17 | C/o Crate work at village Chhibru Nallah (PS) | Flood control | Salwan | 300,000 |
| 18 | C/o Protection drain at Salwan II | Flood Control | Salwan | 150,000 |
| 19 | C/o Khadunja Path with Drain at Telka | Rural Connectivity | Salwan | 100,000 |
| Total | 3,600,000 | |||
| 1 | C/o Protection work at andral | Flood Control | Seri | 300,000 |
| 2 | C/o Protection work at nabehi | Flood Control | Seri | 150,000 |
| 3 | C/o Protection work at badi | Flood Control | Seri | 250,000 |
| 4 | C/o Protection work gagalu | Flood Control | Seri | 300,000 |
| 5 | C/o Plantation work at shaloga | Drought Proofing | Seri | 250,000 |
| 6 | C/o Protection work at kabarstan tikari | Flood Control | Seri | 250,000 |
| 7 | C/o Protection work at bhulkundu | Flood Control | Seri | 300,000 |
| 8 | C/o Protection kuhal at gheka | Flood Control | Seri | 200,000 |
| 9 | C/o Protection work at gheka | Flood Control | Seri | 300,000 |
| 10 | C/o Protection kuhal at nabehi | Flood Control | Seri | 250,000 |
| 11 | C/o Protection work at chamber | Flood Control | Seri | 300,000 |
| 12 | C/o Irrigation tank at andral | Water Harvesting | Seri | 150,000 |
| 13 | C/o Irrigation Tank & Kuhal at village Andral (PS) | Irrigation | Seri | 300,000 |
| 14 | C/O Irrigation Kuhal at Badi (PS) | Irrigation | Seri | 300,000 |
| 15 | C/O Crate work at village Seri (PS) | Flood control | Seri | 400,000 |
| 16 | C/O Protection work at village Anddral (PS) | Flood control | Seri | 300,000 |
| 17 | C/O Protection work at village Alla (PS) | Flood control | Seri | 300,000 |
| 18 | C/O Check Dam at village Batrwaha (PS) | Flood control | Seri | 300,000 |
| 19 | C/O Check Dam at village Saru Nallah (PS) | Flood control | Seri | 300,000 |
| 20 | C/O Protection work at village Mandali (PS) | Flood control | Seri | 300,000 |
| 21 | C/O Check Dam at village Saloga (PS) | Flood control | Seri | 300,000 |
| 22 | C/o Land development work at khabali | Land Development | Seri | 150,000 |
| 23 | C/o Panihara at upper chhamber | Renovation of Traditional Water Bodies | Seri | 100,000 |
| 24 | C/o Khadunja Path with Drain Bhivdoga SC | Rural Connectivity | Seri | 100,000 |
| 25 | C/o Khadunja Path with Drain Manju Nalla to GMS Pantah | Rural Connectivity | Seri | 300,000 |
| 26 | C/o Khadunja Path with Drain Bhadei to Bhadei II | Rural Connectivity | Seri | 300,000 |
| 27 | C/o Khadunja Path with Drain Asha to Shamshanghat Satar | Rural Connectivity | Seri | 230,000 |
| TOTAL | 6,980,000 | |||
| 1 | C/o Panihara at Kanderi | Renovation of Traditional Water Bodies | Kharal | 100,000 |
| 2 | C/o Protection Kuhal Lohani - II | Flood Control | Kharal | 250,000 |
| 3 | C/o Crate work at Banjal Drabu Nalla | Flood Control | Kharal | 220,000 |
| 4 | C/o Protection Kuhal at Patrooma | Flood Control | Kharal | 200,000 |
| 5 | C/o Protection Kuhal at Dibhroo | Flood Control | Kharal | 200,000 |
| 6 | C/o Panihara at Kilodu - II | Renovation of Traditional Water Bodies | Kharal | 100,000 |
| 7 | C/o Protection work at Malla | Flood Control | Kharal | 200,000 |
| 8 | C/o Irrigation Tank at Drabdu Lohani | Water Harvesting | Kharal | 100,000 |
| 9 | C/o Crate work at Guwadi Nalla | Flood Control | Kharal | 200,000 |
| 10 | C/o Protection Kuhal at Tikroo | Irrigation | Kharal | 200,000 |
| 11 | C/o Crate work at Jalai Karedu | Flood Control | Kharal | 150,000 |
| 12 | C/o Protection Work Village Galh | Flood Control | Kharal | 250,000 |
| 13 | C/o Protection Work Village Atalu | Flood Control | Kharal | 200,000 |
| 14 | C/o Protection Work Village Tolu | Flood Control | Kharal | 200,000 |
| 15 | C/O Irr. Scheme cum Tank at village Ghada (PS) | Irrigation | Kharal | 300,000 |
| 16 | Plantation work at village Abbali (PS) | Drought proof | Kharal | 300,000 |
| 17 | C/o Protection Kuhal Khalodi | Flood Control | Kharal | 200,000 |
| 18 | C/o Khadunja Path with Drain Lohani to GPS Lohani | Rural Connectivity | Kharal | 98,000 |
| Total | 3,468,000 | |||
| 1 | C/o Pond at Chuni-2 | Water Harvesting | Kharothi | 100,000 |
| 2 | C/o Crate Work at Chandoga Tala | Flood Control | Kharothi | 150,000 |
| 3 | C/o Check Dam Matahi Kharothi | Flood Control | Kharothi | 150,000 |
| 4 | C/o Protection Kulah at Shali | Flood Control | Kharothi | 150,000 |
| 5 | C/o Crate Work at Banjeen | Flood Control | Kharothi | 150,000 |
| 6 | c/o Crate Work at Bhatoli | Flood Control | Kharothi | 150,000 |
| 7 | C/o Irrigation Tank & Pipe Line Dunali | Water Harvesting | Kharothi | 150,000 |
| 8 | C/o Drain at lakhani to Sukreth | Flood Control | Kharothi | 150,000 |
| 9 | C/o Irrigation Tank Bhanal | Water Harvesting | Kharothi | 150,000 |
| 10 | C/o Water Maintiness Source Khola | Renovation of Traditional Water Bodies | Kharothi | 50,000 |
| 11 | C/o Irrigation Tank Padhari | Water Harvesting | Kharothi | 150,000 |
| 12 | C/o Protectino Kulah at Padhari | Flood Control | Kharothi | 150,000 |
| 13 | C/o Check Dam Nalood | Water Harvesting | Kharothi | 150,000 |
| 14 | C/O Check Dam at villageb Patrani (PS) | Flood Control | Khorthi | 300,000 |
| 15 | C/O Panhira & Drain at village patrani (PS) | Traditional water bodies | Khorthi | 300,000 |
| Total | 2,400,000 | |||
| 1 | C/o Crate work Surela Ghar-II | Flood Control | Pukhri | 150,000 |
| 2 | C/o Drain at Pukhari to Road | Flood Control | Pukhri | 100,000 |
| 3 | C/o Crate work at Khilla | Flood Control | Pukhri | 150,000 |
| 4 | C/o Crate work at Pukhari | Flood Control | Pukhri | 150,000 |
| 5 | C/o Crate work at Ghar | Flood Control | Pukhri | 200,000 |
| 6 | C/o Drain at Surela -II | Flood Control | Pukhri | 150,000 |
| 7 | C/o Crate work at Lai Panihar | Flood Control | Pukhri | 150,000 |
| 8 | C/o Crate work at Shaali Nala | Flood Control | Pukhri | 150,000 |
| 9 | C/o Check Dam at Panjara Nala | Water Harvesting | Pukhri | 150,000 |
| 10 | C/o Panihara at Bindokhi | Renovation of Traditional Water Bodies | Pukhri | 50,000 |
| 11 | C/o Check Dam at Poi Nala | Water Harvesting | Pukhri | 150,000 |
| 12 | C/o Land devlopment at Bichuni | Land Development | Pukhri | 150,000 |
| 13 | C/o Plantation at Bindokhi -II | Drought Proofing | Pukhri | 150,000 |
| 14 | C/o Protection work at Khilla -II | Flood Control | Pukhri | 100,000 |
| 15 | C/o Protection work at Pukhri | Flood Control | Pukhri | 150,000 |
| 16 | C/o Protection work at Keehend | Flood Control | Pukhri | 150,000 |
| 17 | C/o Protection work Halondi-II | Flood Control | Pukhri | 150,000 |
| 18 | C/o Khadunja Path with Drain Main Road to Panjara | Rural Connectivity | Pukhri | 111,000 |
| 19 | C/o Khadunja Path with Drain Bindokhi to Panjara | Rural Connectivity | Pukhri | 160,000 |
| 20 | C/o Khadunja Path with Drain -Kindh to Bindokhi III | Rural Connectivity | Pukhri | 300,000 |
| 21 | C/o Khadunja Path with Drain - Bindokhi to Keendh | Rural Connectivity | Pukhri | 300,000 |
| 21 | C/o Khadunja Path with Drain - Katara to Bindokhi | Rural Connectivity | Pukhri | 300,000 |
| Total | 3,571,000 | |||
| 1 | C/o Protection work at Sindi | Flood Control | Manjhli | 200,000 |
| 2 | C/o Protection work at Trimuhand Nala | Flood Control | Manjhli | 150,000 |
| 3 | C/o Drain Line Village Manjhli | Flood Control | Manjhli | 120,000 |
| 4 | C/o Panihara Primery School Malal | Renovation of Traditional Water Bodies | Manjhli | 100,000 |
| 5 | C/o Drain at Village Biula-II | Flood Control | Manjhli | 150,000 |
| 6 | C/o Protection work at Saryarua | Flood Control | Manjhli | 200,000 |
| 7 | C/o Drain at Village Sindi-I | Flood Control | Manjhli | 200,000 |
| 8 | C/o Irrigation Tank at Village Thall | Water Harvesting | Manjhli | 150,000 |
| 9 | C/o Drain at Village Malal-I | Flood Control | Manjhli | 120,000 |
| 10 | C/o Irrigation Khul Panihar to Shali (Sindi-II) | Irrigation | Manjhli | 200,000 |
| 11 | C/o Panihara at Manhotu Malal -I | Renovation of Traditional Water Bodies | Manjhli | 50,000 |
| 12 | C/o Irrigation Tank at Aghwah (Bag) | Water Harvesting | Manjhli | 100,000 |
| 13 | C/o Protection work at Aghwah | Flood Control | Manjhli | 200,000 |
| 14 | C/o Panihara at Village Biula | Renovation of Traditional Water Bodies | Manjhli | 50,000 |
| 15 | C/o Land Development Work at village Ther-II | Land Development | Manjhli | 200,000 |
| 16 | C/o Crate work at Sinyur Grath | Flood Control | Manjhli | 200,000 |
| 17 | C/o Drain at Village Thall | Flood Control | Manjhli | 100,000 |
| 18 | C/o Crate work at Sindi Nala | Flood Control | Manjhli | 200,000 |
| 19 | C/o Protection work at Sindi Nala | Flood Control | Manjhli | 150,000 |
| 20 | C/o Protection work at Patan Nala | Flood Control | Manjhli | 200,000 |
| 21 | C/O Tank at Panihara at village Hutta. (PS) | Irrigation | Manjhali | 300,000 |
| 22 | C/O Link road from main road to Drabbu (PS) | Rural Conv. | Manjhali | 400,000 |
| 23 | C/O link road at village Hutta. (PS) | Rural Conv. | Manjhali | 300,000 |
| 24 | C/O Irrigation Tank at village Kulah (PS) | Irrigation | Manjhali | 300,000 |
| 25 | C/O Protection work at village Siur (PS) | Flood control | Manjhali | 300,000 |
| 26 | C/o Protection Work Village Tiyari | Flood Control | Manjhli | 100,000 |
| Total | 5,240,000 | |||
| 1 | C/o Drain at Chawal Danoon to Rupek Danoon Nala | Flood Control | Sundla | 150,000 |
| 2 | C/o Crate work at Tilodi Nala | Flood Control | Sundla | 300,000 |
| 3 | C/o Protection work Near by Bihali road | Flood Control | Sundla | 450,000 |
| 4 | C/o Drain at Rupnayal Danoon to Toba Nala | Flood Control | Sundla | 150,000 |
| 5 | C/o Drain at Ganhotra to Toba Nala | Flood Control | Sundla | 150,000 |
| 6 | C/o Drain Sundla-II | Flood Control | Sundla | 150,000 |
| 7 | C/o Drain Airwan-II | Flood Control | Sundla | 150,000 |
| 8 | C/o Protection work Primary School Bihali | Flood Control | Sundla | 150,000 |
| 9 | C/o Protection work Middel School Bihali | Flood Control | Sundla | 300,000 |
| 10 | C/o Crate work Talerena nala | Flood Control | Sundla | 150,000 |
| 11 | C/o Drain Tilodi Nala to Bazar to Dam | Flood Control | Sundla | 300,000 |
| 12 | C/o Crate work Kala Luna | Flood Control | Sundla | 150,000 |
| 13 | C/o Crate work Airwan-I | Flood Control | Sundla | 150,000 |
| 14 | C/o Link Road Tunhi Kholi to Baskad | Rural Connectivity | Sundla | 150,000 |
| 15 | C/o Check Dam and Crate work Toba Nala | Flood Control | Sundla | 300,000 |
| 16 | C/o Crate work Tilodi Nalla-II | Flood Control | Sundla | 150,000 |
| 17 | C/o Pucci Drain Lhari to Tavar | Flood Control | Sundla | 300,000 |
| 18 | C/o Crate work at Galu Nala | Flood Control | Sundla | 300,000 |
| 19 | C/o Crate work Bada | Flood Control | Sundla | 150,000 |
| 20 | C/o Protection work Chuwani to Kuran Nala | Flood Control | Sundla | 150,000 |
| 22 | C/o Crate work Airwan Fogla | Flood Control | Sundla | 150,000 |
| 23 | C/o Crate work at Bihali Panihar | Flood Control | Sundla | 150,000 |
| 24 | C/o Protection Drain Bada to Nalla | Flood Control | Sundla | 150,000 |
| 25 | C/o Protection Kuhal Bhatmoh | Flood Control | Sundla | 300,000 |
| 26 | C/o Crate work Sambal | Flood Control | Sundla | 150,000 |
| 27 | C/o Crate work at Fogla | Flood Control | Sundla | 150,000 |
| 28 | C/o Drain Doulang-I | Flood Control | Sundla | 150,000 |
| 29 | C/o Irrigation tank at Bharwan | Water Harvesting | Sundla | 150,000 |
| 30 | C/o Drain at Bharwan | Flood Control | Sundla | 300,000 |
| 31 | C/o Irrigation Tank at Fogla | Water Harvesting | Sundla | 150,000 |
| 32 | C/o Link Road - Main Road to village Thola | Rural Conv. | Sundla | 500,000 |
| 33 | C/O Link road from Main road to Bhalori Mandir (PS) | Rural Conv. | Sundla | 600,000 |
| 34 | C/O Drain at Drabdu Nalla tadoli (PS) | Flood Control | Sundla | 300,000 |
| 35 | C/o Link Road - Sundla to Tilodi | Rural Conv. | Sundla | 400,000 |
| 36 | C/o Khadunja Path with Drain at Chuwani | Rural Conv. | Sundla | 200,000 |
| Total | 8,000,000 | |||
| 1 | C/o Drain work at Tiyari | Flood Control | Thakri Matti | 150,000 |
| 2 | C/o Land Development At Village Chuddra Kher Singh's Land | Land Development | Thakri Matti | 150,000 |
| 3 | C/o Land Development At Village Bondriyal Sanjeev Kumar's Land | Land Development | Thakri Matti | 80,000 |
| 4 | C/o Land Development At Village Tunhi Suniti's Land | Land Development | Thakri Matti | 80,000 |
| 5 | C/o Land Development At Village Chuddra Reno Devi w/o Baso BPL | Land Development | Thakri Matti | 80,000 |
| 6 | C/o Protection work at Village Chabad | Flood Control | Thakri Matti | 150,000 |
| 7 | C/o Protection work at VillageSalotu | Flood Control | Thakri Matti | 150,000 |
| 8 | C/o Protection work at Village Lachodi | Flood Control | Thakri Matti | 150,000 |
| 9 | C/o Protection work at Village Tholwan | Flood Control | Thakri Matti | 200,000 |
| 10 | C/o Protection work at Vill Tunhi | Flood Control | Thakri Matti | 200,000 |
| 11 | C/o Link Road Upper Chuddra to Vill, Matti | Rural Connectivity | Thakri Matti | 500,000 |
| 12 | C/o Crate work at Village Matti | Flood Control | Thakri Matti | 200,000 |
| 13 | C/o Irrigation Tank at Matti | Water Harvesting | Thakri Matti | 200,000 |
| 14 | C/o Drain work at Tunhi | Flood Control | Thakri Matti | 200,000 |
| 15 | C/o Crate work at Village Bondiryal Chuddra | Flood Control | Thakri Matti | 200,000 |
| 16 | C/o Panihara at Village Panjota, Kakdota | Renovation of Traditional Water Bodies | Thakri Matti | 150,000 |
| 17 | C/o Link Road Main Road to Village Ghiyoga, Panjota, Makdoga and Kakdota | Rural Connectivity | Thakri Matti | 500,000 |
| 18 | C/o Crate work at School to Village Salotu | Flood Control | Thakri Matti | 500,000 |
| 19 | C/o Irrigation Tank at Village Kakdota | Water Harvesting | Thakri Matti | 200,000 |
| 20 | C/o Drain work at Village Basa | Flood Control | Thakri Matti | 200,000 |
| 21 | C/o Irrigation Tank at Village Panjota | Water Harvesting | Thakri Matti | 150,000 |
| 22 | C/o Drain at Village Lachodi | Flood Control | Thakri Matti | 200,000 |
| 23 | C/o Crate work at Village Tunhi | Flood Control | Thakri Matti | 200,000 |
| 24 | C/o Land Development At Tilak Raj R/o Tunhi BPL | Land Development | Thakri Matti | 200,000 |
| 25 | C/o Crate work at Village Bondriyal | Flood Control | Thakri Matti | 150,000 |
| 26 | C/o Kuhal work at Sinyur to Garela | Irrigation | Thakri Matti | 500,000 |
| 27 | C/O Drain at Village Salandri Nallah (PS) | Flood Cont. | Thakrimatti | 400,000 |
| 28 | C/O crate work at Kapada Khad (PS) | Flood control | Thakrimatti | 500,000 |
| Total | 6,540,000 | |||
| 1 | C/o Panihra Banetu | Renovation of Traditional Water Bodies | Ohra | 50,000 |
| 2 | C/o Panihara at Kufleni-II | Renovation of Traditional Water Bodies | Ohra | 50,000 |
| 3 | C/o Panihara at Salpadi | Renovation of Traditional Water Bodies | Ohra | 50,000 |
| 4 | C/o Crate work at Lahdi | Flood Control | Ohra | 300,000 |
| 5 | C/o Panihara at Ghata gala | Renovation of Traditional Water Bodies | Ohra | 50,000 |
| 6 | C/o Irrigation Canal Lahdi | Irrigation | Ohra | 50,000 |
| 8 | C/o Irrigation Canal Manglera to Saled | Irrigation | Ohra | 500,000 |
| 9 | C/o Protection Canal at Sangrut | Flood Control | Ohra | 300,000 |
| Total | 1,450,000 | |||
| 1 | C/o Protection Drain Pralapadher | Flood Control | Simni | 250,000 |
| 2 | C/o Pond at Village Khajura | Water Harvesting | Simni | 200,000 |
| 3 | C/o Crate work Panihra Chumooh | Flood Control | Simni | 150,000 |
| 4 | C/o Drain at Nichla Drabla | Flood Control | Simni | 250,000 |
| 5 | C/o Crate Work Pacca Path to Jandera II | Flood Control | Simni | 400,000 |
| 6 | C/o Panihara at Village Bhakhora | Renovation of Traditional Water Bodies | Simni | 50,000 |
| 7 | C/o Link Road Chamoh to Dharana | Rural Connectivity | Simni | 200,000 |
| 9 | C/o Protection Work at Village Patta | Flood Control | Simni | 200,000 |
| 12 | C/o Crate Work Dandog Nalla | Flood Control | Simni | 200,000 |
| 15 | C/o Protection Nali at Village Dhamoti | Flood Control | Simni | 200,000 |
| 16 | C/o Plantaion at Village Padhar | Drought Proofing | Simni | 200,000 |
| 17 | C/o Protection Nali at Village Simmi | Flood Control | Simni | 200,000 |
| 18 | C/o Pond at Upla Dravala | Water Harvesting | Simni | 50,000 |
| 20 | C/O Irrigation tank at village Jandrada (PS) | Irrigation | Simni | 200,000 |
| 21 | C/O Irrigation tank at village Dadog (PS) | Irrigation | Simni | 200,000 |
| 24 | C/O Protection work at village Sandhi (PS) | Flood control | Simni | 600,000 |
| 25 | C/O Protection work at village Gharan (PS) | Flood control | Simni | 600,000 |
| 26 | C/O Check Dam at village Bhakora (PS) | Flood control | Simni | 600,000 |
| 27 | C/O Check Dam at village Dadog (PS) | Flood control | Simni | 600,000 |
| 28 | C/O Panihara at village Gand (PS) | Traditional water bodies | Simni | 100,000 |
| 29 | C/O Panihara at village Jandreda (PS) | Traditional water bodies | Simni | 100,000 |
| 30 | C/o Khadunja Path with Drain Upper simni to Parli Simni | Rural Connectivity | Simni | 58,000 |
| Total | 5,608,000 | |||
| 1 | C/o Crate wok at Village Sundera | Flood Control | Wangal | 100,000 |
| 2 | C/o Panihra Salmoga | Renovation of Traditional Water Bodies | Wangal | 60,000 |
| 3 | C/o Irrigation tank Sundera | Water Harvesting | Wangal | 100,000 |
| 4 | C/o Panihra at Sundera | Renovation of Traditional Water Bodies | Wangal | 60,000 |
| 5 | C/o Crate Work at Village Mudhan | Flood Control | Wangal | 100,000 |
| 6 | C/o Panihra at Village Sugadi | Renovation of Traditional Water Bodies | Wangal | 100,000 |
| 7 | C/o Crate Work at Village Gadeti | Flood Control | Wangal | 100,000 |
| 8 | C/o Panihra Bhalotra | Renovation of Traditional Water Bodies | Wangal | 40,000 |
| Total | 660,000 | |||
| 1 | C/o Protection Work Devgah I | Flood Control | Salooni | 150,000 |
| 2 | C/o Crate Work Kuntedi(Jadi) | Flood Control | Salooni | 150,000 |
| 3 | C/o Protection Work Kimled | Flood Control | Salooni | 150,000 |
| 4 | C/o Protection Work Mundah | Flood Control | Salooni | 150,000 |
| 5 | C/o Land Development at Dibhru -II | Land Development | Salooni | 150,000 |
| 6 | C/o Drain Devgah II | Flood Control | Salooni | 150,000 |
| 7 | C/o Irrigation Tank Mundah | Water Harvesting | Salooni | 100,000 |
| 8 | C/o Land Development Shukredi | Flood Control | Salooni | 100,000 |
| 9 | C/o Crate Work Darbad | Flood Control | Salooni | 150,000 |
| 10 | C/o Panihara Kehmali | Renovation of Traditional Water Bodies | Salooni | 80,000 |
| 11 | C/o Protection Work Dhanoon Devgah | Flood Control | Salooni | 150,000 |
| 12 | C/o Panihara Daviyunda | Renovation of Traditional Water Bodies | Salooni | 150,000 |
| 13 | C/o Irrigation Tank Ahni Harijan Basti | Water Harvesting | Salooni | 150,000 |
| 14 | C/o Protection Work Devgah III | Flood Control | Salooni | 150,000 |
| 15 | C/o Protection Work Sukhda | Flood Control | Salooni | 100,000 |
| 16 | C/o Panihara at Siula | Renovation of Traditional Water Bodies | Salooni | 100,000 |
| 17 | C/o Protection Work Jatota | Flood Control | Salooni | 100,000 |
| 18 | C/o Crate Work Drod (Devgah) | Flood Control | Salooni | 150,000 |
| 19 | C/o Protection Work Nandla | Flood Control | Salooni | 150,000 |
| 20 | C/o Panihara at Jadoga | Renovation of Traditional Water Bodies | Salooni | 60,000 |
| 21 | C/o Protection Kuhal Village Paterni | Flood Control | Salooni | 100,000 |
| 22 | C/o Crate Work Drod | Flood Control | Salooni | 150,000 |
| 23 | C/o Crate Work Mundah | Flood Control | Salooni | 150,000 |
| 24 | C/O Drain from 1st Devgaha to 2nd Devgaha (PS) | Flood control | Salooni | 200,000 |
| 25 | C/O Irrigation Tank at village Devgaha (PS) | Irrigation | Salooni | 100,000 |
| 27 | C/o Protection wark at village Mundha (PS) | Flood control | Salooni | 300,000 |
| 28 | C/o Khadunja Path with Drain Tatar to Guthan | Rural Connectivity | Salooni | 160,000 |
| 29 | C/o Khadunja Path with Drain Main road to Shiual | Rural Connectivity | Salooni | 155,000 |
| 30 | C/o Khadunja Path with Drain - Goth to Brahm | Rural Connectivity | Salooni | 160,000 |
| 31 | C/o Khadunja Path with Drain - Goth to Chakhdi | Rural Connectivity | Salooni | 160,000 |
| 32 | C/o Khadunja Path with Drain - Ahni to Dibroo | Rural Connectivity | Salooni | 250,000 |
| Total | 4,475,000 | |||
| 1 | C/o Protection work at village Kundi-I | Flood Control | Singadhar | 250,000 |
| 2 | C/o Protection work at Village Singa | Flood Control | Singadhar | 400,000 |
| 5 | C/o Protection work Dhar-III | Flood Control | Singadhar | 350,000 |
| 8 | C/o Irrigation tank at village Kotala | Water Harvesting | Singadhar | 80,000 |
| 9 | C/o Protection Work Puniyadi-III | Flood Control | Singadhar | 200,000 |
| 10 | C/o Tank & Panihara Tikri | Water Harvesting | Singadhar | 200,000 |
| 11 | C/o Drain at Village Dhar | Flood Control | Singadhar | 200,000 |
| 13 | C/o Protection Work at Village Shumnu | Flood Control | Singadhar | 200,000 |
| 14 | C/o Irrigation Tank at Village Kundi near School | Water Harvesting | Singadhar | 80,000 |
| 15 | C/o Irrigation Tank at Village Kundi Galu | Water Harvesting | Singadhar | 80,000 |
| 16 | C/o Protection Kuhal Kundi-II | Flood Control | Singadhar | 200,000 |
| 17 | C/o Protection Kuhal Kotala | Flood Control | Singadhar | 200,000 |
| 18 | C/o Irrigation Tank Shalla | Water Harvesting | Singadhar | 80,000 |
| 19 | C/o Water Tank Village Dadari | Water Harvesting | Singadhar | 80,000 |
| 20 | C/o Crate Work Village Shumnu | Flood Control | Singadhar | 150,000 |
| 21 | C/o Drain Village Shar | Flood Control | Singadhar | 150,000 |
| 22 | C/o Protection Work Arkog | Flood Control | Singadhar | 100,000 |
| 23 | C/o Jeepable Road Halipad to Village Kundi | Rural Connectivity | Singadhar | 400,000 |
| 24 | C/o Crate Work Village Jukyani | Flood Control | Singadhar | 100,000 |
| 25 | C/o Drain Village Kundi-II | Flood Control | Singadhar | 100,000 |
| 26 | C/o Drain Bhid | Flood Control | Singadhar | 250,000 |
| 27 | C/o Protection Work Village Labanj | Flood Control | Singadhar | 200,000 |
| 30 | C/o Irrigation Tank Thadal | Water Harvesting | Singadhar | 80,000 |
| 31 | C/o Drain at Patakhol-I | Flood Control | Singadhar | 150,000 |
| 32 | C/o Crate Work Bidhwad | Flood Control | Singadhar | 200,000 |
| 33 | C/o Water Tank Tatoi | Water Harvesting | Singadhar | 100,000 |
| 34 | C/o Irrigation Tank Village Darkoti | Water Harvesting | Singadhar | 80,000 |
| 35 | C/o Drain Village Tikri | Flood Control | Singadhar | 200,000 |
| 37 | C/o Drain at Village Singa | Flood Control | Singadhar | 200,000 |
| 38 | C/o Crate work at village Patakhol | Flood Control | Singadhar | 200,000 |
| 39 | C/o Protection work at village Koyal | Flood Control | Singadhar | 200,000 |
| 40 | C/o Panihara & storage tank at Village Kundi (Dhiyani) | Water Harvesting | Singadhar | 100,000 |
| 41 | C/o Protection work at Village Jukyani | Flood Control | Singadhar | 200,000 |
| 42 | C/o Protection Work Link Road Dhar to Tikri | Flood Control | Singadhar | 300,000 |
| 44 | C/o Panihara & Tank Kundi | Water Harvesting | Singadhar | 100,000 |
| 48 | C/o Protection Work Eind | Flood Control | Singadhar | 200,000 |
| 51 | C/o Crate Work Dhar | Flood Control | Singadhar | 200,000 |
| 54 | C/o Crate Work Bhirungdi to Singa | Flood Control | Singadhar | 200,000 |
| 56 | C/o Water Tank Fagdotu | Water Harvesting | Singadhar | 80,000 |
| 61 | C/o Crate Work Puniyadi II | Flood Control | Singadhar | 200,000 |
| 62 | C/o Protection work at village Sumunu (PS) | Flood control | Singhadhar | 200,000 |
| 63 | C/o Irrigation Tank Ghodi | Water Harvesting | Singhadhar | 80,000 |
| 64 | C/o Khadunja Path with Drain Main Road to Shamshanghat | Rural Connectivity | Singadhar | 90,000 |
| 65 | C/o Khadunja Path with Drain at village Tikri - II | Rural Connectivity | Singadhar | 150,000 |
| Total | 7,560,000 | |||
| 1 | C/o Pond at village Gumra | Water Harvesting | Suri | 80,000 |
| 2 | C/o Pond at village Ratadwani | Water Harvesting | Suri | 160,000 |
| 3 | C/o Pond at village Suri-II | Water Harvesting | Suri | 150,000 |
| 4 | C/o Pond at village Atala | Water Harvesting | Suri | 120,000 |
| 5 | C/o Crate work at Village Pishmad | Flood Control | Suri | 300,000 |
| 6 | C/o Crate work Ghatdu | Flood Control | Suri | 300,000 |
| 7 | C/o Check Dam at Village Piasmad nala | Flood Control | Suri | 400,000 |
| 8 | C/o Check Dam at Village Dudhedi Nala | Flood Control | Suri | 300,000 |
| 9 | C/o Crate work at Village Pal -II | Flood Control | Suri | 160,000 |
| 10 | C/o Link road main road to Uthar Ganunu | Rural Connectivity | Suri | 800,000 |
| 11 | C/o Minor Irrigation Scheme Chandal Nala to Uthar Ganunu | Irrigation | Suri | 700,000 |
| 12 | C/o Check Dam at village Thisla Nala | Flood Control | Suri | 400,000 |
| 13 | C/o Irrigation Tank at village Mashoga | Water Harvesting | Suri | 250,000 |
| 14 | C/o Crate work at Village Dhadu | Flood Control | Suri | 300,000 |
| 15 | C/o Khadunja Path with Drain - Pal to shamshanghat | Rural Connectivity | Suri | 50,000 |
| 16 | C/o Khadunja Path with Drain-Atalla -II | Rural Connectivity | Suri | 160,000 |
| 17 | C/o Khadunja Path with Drain - Atala | Rural Connectivity | Suri | 80,000 |
| 18 | C/O Khadunja Path with drain at Galu to Parkaid Nalla | Rural Connectivity | Suri | 70000 |
| 19 | C/O Khadunja Path with drain at village Parkaid to Golani | Rural Connectivity | Suri | 100000 |
| 20 | C/O Khadunja Path with drain link road to village chandroon | Rural Connectivity | Suri | 160000 |
| 21 | C/O Khadunja Path with drain at village Pal | Rural Connectivity | Suri | 80000 |
| 22 | C/o Khadunja Path with Drain at Gumra | Rural Connectivity | Suri | 80,000 |
| 1192 | Total | 5,200,000 | ||
| Grand Total | 214916000 | |||
| (Rs Twenty One crore Fourty Nine lacs Sixteen Thousand only) | ||||