Sanction No.-DRDA-CBA-(NREGA)/2011-12-457-61    Dated:-              26.04.2011
Total No of Schemes: 1243                          Amount 19,79,50,000
Sr.No.
          Name of Scheme
Gram Panchayat Amount Sanctioned
1 C/o Jeep Road Khakhroon TO Chamheta Khargatta 400000
2 C/O Jeep Road Nalatu Phase-11 Khargatta 400000
3 C/O Soil Cons. (Check Dam ) Bhujjal Nalli  Khargatta 200000
4 C/O Panihar at Salhotu Khargatta 80000
5 C/O Check Dam Bithal Nallah  Khargatta 200000
6 C/O Soil Cons. (Check Dam ) Kudkanu Nalli Nalatu  Khargatta 100000
7 C/O Crate Work Naled Nallah  Khargatta 150000
8 C/O Kuhal at Ruhad To Khakhroon  Khargatta 150000
9 C/O Bowali at Padeeni Nadda  Khargatta 60000
10 C/O Kuhal Phet Ghardaani  Phase -11 Khargatta 100000
11 C/O Soil Cons. Work Ruhad Faati  Khargatta 100000
12 C/O Bowali at Gudhal  Khargatta 50000
  Total    1990000
1 C/o Bowadi at vill. Bhitt Balera 40000
2 C/o water storage work vill. Faroli(Patti) Balera 40000
3 C/o water storage work vill. Chaltuni Balera 50000
4 C/o Public water Tank vill. Aloot Balera 50000
5 C/o check Dam at Panjinala Balera 200000
6 C/o Irr. Tank Sadhu Ram Land vill. Kutt No.II Balera 100000
7 C/o Public Tank vill. Bassa(Balera) near Sahni Devi House Balera 50000
8 C/o Public water storage Tank vill. Suhagallu Balera 50000
9 C/o Bowadi at vill SathelaBassi Balera 50000
10 C/o Bowadi at vill. Kutt No.ll Balera 40000
11 C/o Bowadi at vill. Makolsu Balera 40000
12 C/o irr. Tank vill. Makolsu Balera 50000
13 C/o Bowadi at vill. Kuddan Balera 40000
14 C/o Bowadi at vill Kalanal Balera 40000
15 C/o Bowadi at vill Aloot Balera 40000
16 C/o Kuhal at Pattinala to Vill. Aloot Balera 50000
17 C/o Land Dev. S.C Basti vill. Aloot Balera 50000
  Total    980000
1 C/O Traditional Water Source at Tharpu Kahari 60000
2 C/O Traditional Water Source at Dramanu Kahari 70000
3 C/O Irrigation water Tank vill. Tikker Raid Kahari 140000
4 C/O Irrigation Kuhal at Talagarth to Chouri Kahari 150000
5 C/O Talab at Tharpu Kahari 150000
6 C/O Traditional Water source at Banni Kahari 50000
7 C/O Water Tank at Kutt (Kanda) Kahari 150000
8 C/O Irrigation Kuhal at Kulwara Kahari 140000
9 C/O Water Tank at Kahair Kahari 140000
10 C/O Traditional Water Source at Galli Kahari 50000
11 C/O Traditional water Source Ghot Kahari 70000
12 C/O Pacci Nalli at Dhogriyada Kahari 140000
13 C/O Irrigation Kuhal Nagiyar to Chouri Kahari 150000
14 C/O Land Dev. Work at G M S Kahari Kahari 150000
15 C/O Traditional Water Source at Sundhar Kahari 60000
16 C/O Crate Work at Kulwara Nalla Kahari 150000
17 C/O Pacci Nalli at S C Basti at Dumela Kahari 140000
18 C/O Traditional Water Source at Siya di Bai Kahari 60000
19 C/O Traditional Water Source at Kalavan Kahari 50000
20 C/O Traditional Water Source at ghoat Kahari 70000
21 C/O Soil Con. Work at S.T Basti at Kalavan Kahari 150000
22 C/O Soil Con. Work at G.M.S Rakhed Kahari 150000
23 C/O Traditional Water Source Raid Kahari 70000
  Total   2510000
1 PACCA TALAB AT MATIYAR SAMLETRA Gahar          3,00,000
2 KUHAL AT DAGALLI TO RUHANI Gahar          2,50,000
3 BOWLY AT LANOH,KAKDE THE BOWLY DEVA Gahar          1,50,000
4 SOIL CON.WORK NEAR KUT SCHOOL Gahar          1,50,000
5 CRATE WORK HATTINALLA Gahar          1,50,000
6 PANIHARA AT BADDI NALLA Gahar          1,50,000
7 PANIHARA AT CHAMOLA THE NAADA Gahar          1,50,000
8 SOIL CON WORK TRIMBLI FALETH Gahar          2,00,000
9 BOWLY AT NICHLA KUAT Gahar             40,000
10 GEEP ROAD AT GAHRE THE GHATU TO THER Gahar          4,00,000
11 REPAIR GEEP ROAD ROAD TO TORNU Gahar          2,50,000
  Total        21,90,000
1 C/O Water Tank Chola dhal Awan 100000
2 C/O Pulli at Hobardi Khad Awan 400000
3 C/O Check Dam at Jhande de Mal Awan 100000
4 C/O Crate Work at Trimbali Nalla Awan 100000
5 C/O Irri. Kuhal Flaith to Purkhad Tak Awan 100000
6 C/O Irri. Kuhal Karnailo Machaine To Flaith Awan 800000
7 C/O Panihar at Parihara Awan 50000
8 C/O Check Dam at Baniska Nalla Awan 100000
9 C/O Water Tank at Jhande De Mal Awan 100000
10 C/O Talab at Dhamkhali Awan 100000
11 C/O Pacci Nalli at Banuni to Awan (PWD) Awan 500000
12 C/O Irrigation  Tank at Badu Awan 100000
13 C/O Irrigation Water Tank at Baniska Awan 100000
14 C/O Irrigation Kuhal Nachali Sail To sadak Tak Awan 200000
15 C/O Irrigation Kuhal Nachali Sail To Khartu Tak Awan 150000
16 C/O Jeep Road Chambe To Draman Tak Awan 500000
  Total   3500000
1 C/O Kuhal Dramman To Naharani Nallah Tikkri  150000
2 c/o Chashma at Pukhreta -1 Tikkri  80000
3 C/O Kachha Talab at Talai Tikkri  100000
4 C/O Kaccha Talab at Lalaoh Angrej Singh land Tikkri  100000
5 C/O Kaccha Talab at Domredu Tikkri  100000
6 C/O Kuhal at Tarheda to Rattan Singh land Tikkri  150000
7 C/O Check Dam at Gud Nallah Tikkri  150000
8 C/O Kachha Talab at Pukhreta Tikkri  100000
9 C/O Kuhal Dumredu To Baad Tikkri  300000
10 C/O Chashma at Siyada  Tikkri  100000
11 C/O Check Dam at Gud Nallah -II Tikkri  150000
12 c/o Chashma Vill Pukhreta -II Tikkri  80000
13 C/O Panihar AT Bajadi Kupadi Tikkri  60000
14 C/O Soil cons.check Dam Tikkri Near Gagan Singh House  Tikkri  150000
15 C/O Panihar at vill Gharoon Tikkri  50000
16 C/O Chashma at Vill Tikkri near Prem  Raj House Tikkri  50000
  Total   1870000
1 c/o Kuhal at Drabbad TO Kutt  Surpara 200000
2 C/O Kuhal at Surpara Nallah TO Beharu  Surpara 200000
3 C/O Irrigation Tank at Nava tod Surpara 150000
4 C/O Irrigation Tank Uppali Mihayad Surpara 150000
5 C/O Check Dam at  lohalu  Khadd  Surpara 200000
6 C/O Bowali Vill at  Grodu Vill. Surpara 50000
7 C/O Irrigatio Tank at Kuie Village  Surpara 150000
8 c/o Irrigation Tank at  Nahani Village  Surpara 150000
9 C/O Irrigation Tank at Talla  Surpara 150000
10 C/O Irrigation Tank AT Khola Village  Surpara 150000
11 C/O Bowali at Nichli Manjhoie Surpara 50000
12 C/O Irrigation Tank Talai Kuie  Surpara 100000
13 C/O Irrigation Tank  at  Chaffadu  Surpara 100000
14 C/O Irrigation Tank AT Beharu Village Surpara 150000
15 C/O Check Dam at  Galeed Nallah  Surpara 160000
16 C/o Jeep Road Surpara To Chatrar Nag (PS) Surpara 100000
17 C/O Jeep Road Surpar To  Panchayat Ghar  Distance  2  km Surpara 2000000
  Total   4210000
1 C/o Jeep Road Main Road to seri Kut Samote 500000
2 C/o Water Tank Vill Dukher  Samote 200000
3 C/o Check dam Vijay Singh Singyh House Gharoti Samote 200000
4 C/o Jeep Road Main Road to Halder Vill Samote 400000
5 C/o Pacci Kuhal Fat to Behi Samote 300000
6 c/o Check Dam Nagogh Near Chashma Samote 200000
9 C/o Pacci Kuhal Pukher to Chapui Samote 200000
12 C/o Pacci Kuhal Nawan Tod Har Samote 150000
15 C/o Jeep Road ( Ambuless Road) PHC Samote to Vill Dukher Samote 500000
18 C/o Check dam Kunde Nala Samote 200000
21 C/o Check dam Chowai Nala Samote 300000
24 C/o Check Dam Chatoula  (PS) Samote 200000
27 C/o Check dam naroli Nala Samote 300000
  Total   3650000
1 C/o Pacci Kuhal Gharat Bag to Nimoli  Khanora 300000
2 C/o Pacci Kuhal Manghul Kherara to mandiyana  Khanora 200000
3 c/o Pacci KuhalJhandul to Dharna Khanora 300000
4 C/o Jeep Road Ghatta to Vill Thona Khanora 800000
5 C/o Check Dam at Kuya Nala Khanora 150000
6 C/o Pacci Babli at Chullan Khanora 100000
7 C/o Pacci Babli at chounda de Rai Khanora 80000
8 C/o Chack Dam at Gharat Bag to Kalnu Khanora 200000
9 C/o Talab at Vill Thona Khanora 50000
10 C/o Pacci Kuhal Jhulara to Baggi Khanora 150000
11 C/o Chaeck dam at Chulan Nala Khanora 150000
12 C/o Pacci Kuhal Ganed to Narelu Khanora 130000
13 C/o Pacci Kuhal Ganed to Kakadnala Khanora 200000
14 C/o Pacci babli Medho De Rai Khanora 50000
15 C/o Babli at Beri da langa Khanora 50000
16 C/o Babli at Kamarti  Khanora 50000
17 C/o Pacci Kuhal Jhulara to Bhumali Khanora 80000
18 C/o Pacci Kuhal nadu to Awansi Khanora 180000
19 C/o Soil con. Work Near Play Ground GPS Narwari Khanora 150000
20 C/o Check dam Ched Nalato kakad Nala Khanora 150000
  Total   3520000
1 Repair Of Talab at Taragarh Taragrah 100000
2 C/o Talab at Guliyal Bassa Taragrah 80000
3 C/o irrigation Tank at Kalani Taragrah 100000
4 C/o Drinking Water Tank at G.P.S Barian Taragrah 40000
5 C/o irrigation Tank at Samtre Taragrah 100000
6 R/o Talab at Birjo Dhar Taragrah 40000
7 C/o Irrigation Tank near Sanjay kumar House at Barian Taragrah 100000
8 C/o Bowali at Taragarh near Garden Taragrah 50000
9 C/o Bowali at Lahala-II Taragrah 50000
10 C/o Irrigation Tank at Vill. Bhaddreta Taragrah 100000
11 R/o Talab at Ladhuni Taragrah 50000
12 C/o Bowali with Bathroom at Badnal Taragrah 50000
13 C/o Talab at Katlu Taragrah 80000
14 C/o Bowali at Bareau Taragrah 50000
16 C/o Bowali at Ladhuni Taragrah 50000
17 C/o Bowali at Kapadi Taragrah 50000
18 R/o Jeepable Road Main Road to Vill. Bhutani Taragrah 150000
19 C/o Irrigation Tank at Odian Taragrah 100000
20 C/o Irrigation Tank Dangari-Guliyal Taragrah 150000
21 C/o Irrigation Tank at Kiddu Bassa Taragrah 100000
22 C/o Irrigation Tank Bareau near Tilak Raj House Taragrah 100000
23 C/o Talab at  Aali Taragrah 50000
24 C/o Irrigation Tank at Kharchar Taragrah 100000
25 C/o Drinking Water Tanki Gaddiyara near Lakhdata Mandir Taragrah 50000
26 C/o Irrigation Tank at Baila Taragrah 100000
27 C/o Irrigation Tank  Taragarh Taragrah 100000
28 C/o Irrigation Tank Jattan Da Baag Taragrah 100000
29 R/o Kuhal Bassa to Mahala Taragrah 100000
30 C/o Drinking Water Tanki at Kalani Taragrah 80000
31 C/o Talab at Khabaran Taragrah 100000
32 R/o Jeepable Road Main Road to Vill. Kalan Taragrah 80000
33 C/o Bowali at Katali Taragrah 40000
34 R/o Road Chakki to Ludhian  Taragrah 150000
35 R/o Road Kholu to Dangari Taragrah 150000
36 C/o Road Main Road to V.ll. Bareau Taragrah 150000
37 R/o Road Dangari to Chounkiian Moud Taragrah 150000
38 R/o Jeepable Road khabran to Lohala Taragrah 150000
39 C/o Irrigation Tank Badota Taragrah 100000
                         Total    3440000
1  C/o Talab at Vill Kathlu Parchhore 80,000
2  C/o Irrigation Tank at vill Bag Bandera Parchhore 100000
3 C/o Pucci Nalli at Naddal Parchhore 1,00,000
4  C/o Bawali at vill Sulera Parchhore 50,000
5  C/o Panihar at vill Chanihan Parchhore 50,000
6  C/o Jeep Road Repair Parwat Parchhore 2,00,000
7 C/o Soil Conservation Work  at Parchhore Parchhore 1,00,000
8 C/o Irrigation Tank at Bani da Nala Parchhore 80,000
9 C/o Kuhal from  Mandir to lahru (300Mtr) Parchhore 80,000
10 C/o Kuhal from  Chakki to Vill Ghatasani  Parchhore 200000
11  C/o Soil Conservation Work at Bassa Parchhore Parchhore 8,00,000
12 C/o  Irrigation tank at Vill Naddal Parchhore 80,000
13  Irrigation Tank at Vill Parwat Parchhore 80,000
14 C/o Talab at Hathi Dhar Parchhore 80,000
15 C/o Irrigation Tank at Vill Barla Parchhore 80,000
16 C/o Irrigation Tank at Vill Burjan Narola Parchhore 80,000
17 C/o Bawali at vill Khalal Parchhore 50,000
18 C/o Kuhal From  Bhati Nala to Bagoth Parchhore 100000
19 R/O Jeep Road from Sanjhi  Nala to Chakki  Parchhore 200000
20 C/o Bowali  at vill Ghatasani near Krishan chand house Parchhore 50,000
21 C/o Soil Conservation Work at vill. Khalal Parchhore 80,000
22 C/o Irrigation tank at vill Naddal Parchhore 80,000
23 C/o Land Development work at Lahru Parchhore 100000
24 C/o Soil Conservation Work at Naddal Parchhore 100000
25 C/o Kuhal from nalla to Pail Parchhore 80,000
26 C/o Galli Pluging at Narola Parchhore 80,000
27 C/o Bawali at vill Parwai Parchhore 50,000
28 C/o Check Dam at Bai Nala & Sulera Nala Parchhore 150000
29 C/o Soil Conservation & Work Barla Ghai Da Ghar Parchhore 2,50,000
30 C/o Soil Conservation work at Trimbali  Nalla Parchhore 1,00,000
  Total    37,10,000
1 C/O Bawli At Talara Kakira Kasba 40000
2 C/O Bawli at Kaluganj Kakira Kasba 40000
3 C/O Talab at Bidingi Kakira Kasba 50000
4 C/O Soil Cons. Work Awarli Bidingi Kakira Kasba 45000
5 C/O Soil Cons. Work Talara Kakira Kasba 50000
6 C/O Bawli at Kakira near Hut Kakira Kasba 50000
7 C/O soil Cons Work Bidingi Kakira Kasba 50000
8 C/O Soil Cons. Work Kakira Ward Kakira Kasba 50000
9 C/O Soil Cons Work Kakira Ward 2 Kakira Kasba 50000
  Total   425000
1 C/O Bawli at Kamleru near Devigaon Kakira Jarai 50000
2 C/O Bawli vill. Bhagnad Kakira Jarai 50000
3 C/O Bawli at samlar vill Kakira Jarai 50000
4 C/O Bawli at Bhekar Kakira Jarai 50000
5 C/O Bawli at Bhatoli Kakira Jarai 50000
6 C/O water Tank vill. Bhatoli at Gandhi Land Kakira Jarai 50000
7 C/O Bawli at vill. Magnooh Kakira Jarai 50000
11 C/O water Tank vill. Bhatoli  Kakira Jarai 50000
12 C/O kuhl Kamluni vill. Samlar Kakira Jarai 50000
13 R/O Jeepable road Chhandi mod to Ruhroo Kakira Jarai 100000
14 R/O Jeepable road Shiv Mandir to Bhatoli Kakira Jarai 100000
15 C/O Jeepable road Kehla to Devigaonvia Bhekar Kakira Jarai 100000
  Total   750000
1 C/O Bawli at Lower Tulad Ghatsani 40000
2 C/O Bawli at Upper Mamul Ghatsani 40000
3 C/O Bawli Near Shamshan Ghat Ghatasni  Ghatsani 40000
4 C/O Talab Upper Mamul Ghatsani 60000
5 C/O Babli Near Drabad Ghatasni Ghatsani 40000
6 C/o Link Road Tulad Road to Lower Kudera  Ghatsani 150000
7 C/O Bawli Near the House Angrej Ghatsani 40000
8 C/O Check Dam Jhaman Nalla L/Mamul Ghatsani 40000
  Total   450000
1 C/o Bowly at Talai Kuddi 50000
2 C/o Pucci Nali at Delag Village Kuddi 150000
3 C/o Pucca water Tank at Kapadi Kuddi 200000
4 C/o Water tank at Panjwar Near Talab Kuddi 100000
5 C/o Bowly at Chafadu Seyan Kuddi 50000
6 C/o Pucci Kuhal from Kulthair to tank Kuddi 200000
7 C/o Pucca Talab at Baiska Dibbaru Kuddi 100000
8 C/o Talab at Harnet Kuddi 100000
9 C/o Bowly at Naag di Naali Kuddi 50000
10 C/o Pucci Nali at thanoli Kuddi 150000
11 C/o Water Tank at Khopru Near Bowly Kuddi 150000
12 C/o Bowly at Jawali Kuddi 50000
13 C/o Check Dam at Khadkumba Nala Kuddi 150000
14 C/o Check Dam at Chontadu Nala Kuddi 150000
15 C/o Talab at Draman Kuddi 100000
16 C/o Bowly at Khopru Phaat Kuddi 50000
17 C/o Kuhal from Matholu to Barula Kuddi 300000
18 C/o Bowly at Jattu Di Reh Kuddi 50000
19 C/o Kuhal at Road to Nichali Bhugnar Kuddi 200000
20 C/o Bowly at Farnaily Kuddi 50000
21 C/o Pucci Kuhal Kontar Khana to Lahar Kuddi 150000
22 C/o Bowly at Bassi Kuddi 50000
23 C/o Panihar at Barula Kuddi 50000
24 C/o  Kuhal From Drabad to Matholu Kuddi 300000
25 C/o Panihar at Dakhneta Kuddi 50000
26 C/o Check Dam Zhulunu Nala Kuddi 300000
  Total   3300000
1 C/o Jeepable road from Garkhra to Dalod(Forest Deppt.) Hobar 400000
2 C/o irri. Kuhal from Hobar to Jadoli (IPH Deptt.) Hobar 500000
3 C/o Land Protection & Water Nikas Nakla at Maknala Hobar 500000
4 C/o Water Tank at Baag Hobar Hobar 100000
5 C/o Soil Cons. Work at Mohru Hobar 100000
6 C/o Water drainege Line work at S/C Family Bharmoli Hobar 150000
7 C/o Land Prot. Work Near Makodu GSSS Hobar Hobar 100000
8 C/o Panihar at Bhalwar Hobar 50000
9 C/o Water Tank drabad Bassa Hobar 100000
10 C/o Soil prot. Work at Jadoli Ghaar Hobar 200000
11 C/o Kuhal from Khajjiyan to Batta Hobar 150000
12 C/o Pipe Line Bhgta to Batta sarain Hobar 150000
13 C/o Water Tank at Gharuna Hobar 100000
14 C/o Water Tank Drabad Basa Hobar 100000
15 C/o Drinking Water Tank at Rang Hobar 150000
16 C/o Bowaly at Chafadu Dalod Hobar 50000
17 C/o Water Tank Repair Kartar Land Hobar 60000
18 C/o Kuhal from Gharuna Nala to Baag Hobar 100000
19 C/o Panihar ta Bhugta Baag Hobar 50000
20 C/o Talab ta Rehadiyan Thanoli Hobar 100000
  Total   3210000
1 c/o Water Tank amaro ki Jamin at Manola Khadeda 80000
2 C/o Bowly at Mahot Khadeda 50000
3 C/o Water Tank at Gandho Ki Jamin Huletar Khadeda 80000
4 C/o Water Tank at saino ki Jamin Huletar Khadeda 80000
5 C/o Check Dam at Mukat Nala  Khadeda 60000
6 C/o Water Tank Khajji Naag drabad Manola (IPH Deptt.) Khadeda 80000
7 C/o Water tank Near Ohar Kapadi Khadeda 80000
8 C/o Check Dam at Kattly Nala Bet Khadeda 50000
9 C/o Pond at Khadeda Khadeda 100000
10 C/o Pond at Talatu Khadeda 50000
11 C/o Check Dam at Matoda Nala Khadeda 70000
12 C/o Talab at tonda Mai Bassa Khadeda 60000
13 C/o Water tank at Ohar Khadeda 50000
14 C/o Talab at Manola Khadeda 80000
15 C/o Check Dam bai Da Nalla Sapadi Khadeda 90000
16 C/o  Water Tank at Nadda Ohar Khadeda 200000
17 C/o Check Dam at Chowada Nalla Khadeda 100000
18 C/o Bowly at Ohar Khadeda 50000
19 C/o Crate work Near Bouly Ohar Khadeda 100000
20 C/o Bowly at Baila Khadeda 50000
21 C/o Repair & Maintenance Jeepable road from Garkhra to  Khadeda Khadeda 1000000
  Total   2560000
1 C/o Talab at Chamad Nainikhad 100000
2 C/o Bowly at Raina Nainikhad 70000
3 C/o Bowly at Laharu Nainikhad 70000
4 C/o Kuhal at S/c Basti Kasba Nainikhad 200000
5 C/oBowly at sukh Nala Nainikhad 60000
6 C/o Bowly at Saradu Nainikhad 50000
7 C/o Water Tank at Kehalu Nainikhad 100000
8 C/o Talab near tikkar Nainikhad 100000
9 C/o Talab at raina Nainikhad 100000
10 C/o Bowly at More Da Lahad Nainikhad 70000
11 C/o Panihar at Kasba Nainikhad 50000
12 C/o Link road at Dharmod Nainikhad 200000
13 c/o Soil Cons. Work at Tikkari Nainikhad 200000
14 C/o Soil Cons. Work at Bedal Nainikhad 200000
15 C/o Bowly at Kehalu Nainikhad 70000
16 C/o Soil Cons. Work at sail Nainikhad 200000
17 C/o soil Cons. Work at Dhawali Nainikhad 200000
18 C/o Link road at Ganod Nainikhad 200000
19 C/o Soil Cons. Work at Near Bedal Temple Nainikhad 200000
20 C/o Bowly at Sangrun Nainikhad 60000
21 C/o Water Tank near at Harad Nainikhad 200000
22 C/o Talab at Upper Laharu Nainikhad 100000
23 C/o Soil Cons. Work at s/c Basti Jarai Nainikhad 100000
24 C/o Bowly at tapparu Nainikhad 50000
25 C/o afforstation work at Bedal Nainikhad 100000
26 C/o Link road from Mukhya road to Madan Ghar Nainikhad 200000
  Total   3250000
1 DRAINAGE LINE WARD NO 1 SHERPUR Sherpur 100000
2 DRAINAGE LINE WARD NO 2(SALARIA MOHALLA) SHERPUR Sherpur 100000
3 RENNOVATION OF PANIHAR AT VILL. CHOURHA Sherpur 60000
4 DRAINAGE LINE AT KAKIYANA VILLAGE WARD NO 4 Sherpur 100000
5 WATER STORAGE TANK AT CHANDERA KOLI VILL PANDOL Sherpur 150000
6 LAND DEVELOPMENT WORK ON PEMO DEVI LAND (S/C & BPL FAIMLY) SHERPUR -1 Sherpur 300000
7 CONSTRUCTION OF JEAPABLE ROAD FOR JAKHRODIA MOHALLA AT SHERPUR -1 Sherpur 80000
8 RENNOVATION OF KUHAL AT CHOURHA  Sherpur 50000
9 LAND DEVELOPMENT WORK NEAR CHAMAN LAL'S HOUSE AT PANDOL(BPL Faimly) Sherpur 90000
10 WATER TANK AT W.N. 2 SHERPUR Sherpur 200000
  Total   1230000
1 R/o Kuhal & Danga at Bogad Bagdhar 80000
2 C/o Pipe Line & Talab at Kapadi Drabad Bagdhar 150000
3 C/o Roof Rain Harvesting Tank at Rakesh Kumar Bogad Bagdhar 120000
4 C/o Bowali at Near Chaman Lal, Chatro Ram house's Khoon Bagdhar 70000
5 C/o Talab at vill. Batei Bagdhar 50000
6 C/o Link Road at Matoon to Ubarla Sakdeh & Parla Sakdeh Bagdhar 500000
7 C/o Rain Harvesting Tank at Ubarla Sakdeh Bagdhar 100000
8 C/o Roof Rain Harvesting Tank at Badoh Chatro Ram house Bagdhar 100000
9 R/o Panihar & Danga at Piyanku-2 Bagdhar 80000
10 R/o Kuhal at Chridi Nala to Jaman Bagdhar 70000
11 C/o Bowali at Khodu  Bagdhar 60000
12 C/o Puli at Bogad Bagdhar 200000
13 C/o Drain at Bogad Bagdhar 120000
14 C/o Drain at vill. Tunka  Bagdhar 100000
15 C/o Kuhal at Kalthoon Nala to Juted Kohli Land Bagdhar 300000
16 R/o Panihar at Parla Sakdeh Bagdhar 40000
17 C/o Drain at Rano Devi House Gagduna to Khol Nala Bagdhar 100000
18 C/o Roof Rain Harvesting Tank at Amro Ram House Mukat Bagdhar 80000
19 C/o Rain Harvesting Tank at Batei Bagdhar 100000
  Total   2420000
1 C/o Drinking Water Tank at Near vill. Baderu Panihar Dhalog 30000
2 C/o Drinking Water tank at Lower Dhared Dhalog 200000
3 C/o Rain harvesting Tank at vill. Badatu Dhalog 300000
4 C/o Drinking Water Tank at vill. Dhalog  Dhalog 250000
5 C/o Panihar with Bathroom at vill lower Dhared Dhalog 120000
6 C/o Irrigation Tank at vill. Dhared Nala kouli Land Dhalog 250000
7 C/o Soil cons. work at Badatu  Dhalog 400000
8 C/o Soil cons. & Check Dam at vill. Chadola Dhalog 300000
9 C/o Link Road at Main Road to Kaliyal Mohala Dhalog 300000
10 C/o Link Road at Chadola to Daliyal Mohala Dhalog 250000
11 C/o Link road at Suresh Kumar House Dhalog 250000
12 C/o Puli at Lower Dhared Nala Dhalog 150000
13 C/o Play Ground work at GMS Dhalog Dhalog 200000
14 C/o Play Ground work at GPS Baderu Dhalog 200000
  Total   3200000
1 C/o Lift Irrigation Scheme with store Tank at vill. Uled Sudli 200000
2 C/o Irrigation Kuhal at Nadd to Suaa Sudli 200000
3 C/o Irrigation Kuhal at Nadd to vill. Basdu Sudli 200000
4 C/o Irrigation Kuhal at Nadd to vill. Basdu-2 Sudli 100000
5 C/o Panihar with Bathroom at vill. Dugh Sudli 80000
6 C/o Irrigation Tank at vill. Ladhod Land Sudli 200000
7 R/o Bowali with Store Tank at Badhu vill. Uled Sudli 100000
8 C/o Puli at vill. Banska Nala Sudli 200000
9 C/o Irrigation Kuhal at Nala to Sandhara Sudli 200000
10 C/o Check Dam & Plantation at vill. Chambi Nala Sudli 250000
11 C/o Soil cons. work at vill. Kutt Sinharu Sudli 200000
12 C/o Soil cons. Work at vill. Sudli near Main Road Sudli 200000
13 C/o Soil cons. Work at vill. Sinharu Sudli 100000
14 C/o Land Protection work at near vill. Chambi Nala Sudli 100000
15 C/o Link Road at Main Road to Chonki Mata Mandir Sudli-2 Sudli 200000
16 C/o Link Road at Main Road to Lower Sudli-2 Sudli 100000
17 C/o Link Road at Main Road to vill. Bannu Sudli 250000
18 C/o Bowali at Harizan Basti vill. Bhatti Sudli 50000
19 C/o Land Dev. work at Panchayat Ghar Sudli Sudli 120000
  Total   3050000
1 C/o Plantation work at Panchayat Land GP Mail Mail 300000
2 C/o Talab work at Draman Mail 150000
3 C/o Kuhal at Dum to Kut Mail 200000
4 C/o Kuhal at Bassa Mail 200000
5 C/o Kuhal at Kattli Mail 250000
6 C/o Check Dam work at Damail to Sub Centre Mail 300000
7 C/o Soil cons. Work at near GSSS Mail Mail 300000
8 C/o Soil cons. Work at Dudi Draman Mail 200000
9 C/o Soil cons. Work at Bugaliyan Da Mohala Mail 300000
10 C/o Soil cons. Work at Charmed Nala Mail 200000
11 C/o Talab work at Kutt Mail 200000
12 C/o Soil cons. work at Charmani  Mail 200000
13 C/o Soil cons. Work at Gujjra Da Bassa Mail 200000
  Total   3000000
1 C/o Panihar at upper Magdhar Nagali 80000
2 C/o Panihar at Village Dralla Nagali 80000
3 C/o Panihar at Village Maled Nagali 80000
4 C/o Panihar at Village Toba Nagali 80000
5 C/o  Panihar at Dhar Faat Nagali 80000
6 C/o Panihar at Janoli Nagali 80000
7 C/o Payjal Tank at Magdhar  Nagali 200000
8 C/o Payjal tank at Village Rakog Nagali 300000
9 C/o Payjal Tank at Village Dahlan Nagali 200000
10 C/o Panihar at Village Nanhorya Nagali 80000
11 C/o Payjal Tank at Village Minda Nagali 200000
12 C/o Payjal Tank at Village Sanjap Nagali 200000
13 C/o Irrigation Kuhal at Ranged Nagali 150000
14 C/o Payhal Tank at Village Bassa Nagali 200000
15 C/o Drain & Path Lower Magdhar Nagali 150000
16 C/o Drain & Path Village Dralla Nagali 150000
17 C/o Irr. Tank village Kunera Nagali 200000
18 C/o Drain & Path Village Chalari Nagali 150000
19 C/o Drain & Path Village upper Dhar Nagali 150000
20 C/o Drain & Path Village Gedvill Nagali 150000
21 C/o Storage Drainage Water Cum Sockpit Village Sanjpoi Nagali 150000
22 C/o Panihar Village Chhukra Harijan Basti Nagali 150000
23 C/o Drain & Path lower Dhar Nagali 150000
24 C/o Link road Dralla to Janoli Nagali 300000
25 C/o Irr. Kuhal at village Maled Nagali 150000
26 C/o Link road Churdu Nalla viya Dhar tapru to Panchyat Ghar Nagali 300000
27 C/o Drain & Path Village Nanhorya  Nagali 150000
28 C/o Drain & Path Village Dulhar Nagali 100000
29 C/o Irr. Kuhal Village Nhu Nagali 150000
30 C/o Soil Cons. Work near Sub-Center Ranged Nagali 100000
31 C/o Irr. Tank at Village Nanhorya  Nagali 150000
32 C/o Payjal Tank at village Nhu Nagali 150000
33 C/o Link road Ranged to village Kunera Nagali 300000
  Total   5260000
1 C/o Soil Cons. Work & Drain Kaliyal Mohalla Kandei Samlew 300000
2 C/o Water Storage Tank 7 Payjal Scheme Samleu Samlew 400000
3 C/o Soil Cons. Work at lower Samleu Samlew 400000
4 C/o Soil Cons. Work at near Khukru Khad  Samlew 200000
5 C/o  Sockpit & Drain Village Samleu (4) no.  Samlew 50000
6 C/o Aproting Congres grass & repair rasta village Samleu Ward no. (07,04,03) Samlew 100000
7 C/o Irr. Kuhal lower Lahad upper Samleu Samlew 150000
8 C/o Irr. Water Storage Tank Suta Nalla Samlew 250000
9 C/o Irr. Tank at Baag Samlew 250000
  Total   2100000
1 C/o Soil Cons. Work & Bawali BPL familes land Kapei Chuhan 200000
2 C/o Irr. Upper Kuhal at Mugager Garh-1 Chuhan 200000
3 Repair Irr. Kuhal Banedi Garh-2 Chuhan 50000
4 Repair Irr. Kuhal Maliyad Chuhan Chuhan 50000
5 Repair Irr. Kuahl Trvaad Chuhan 50000
6 C/o Pucci Kuhal Bangla Valour thead Mihenu Chuhan 200000
7 C/o Irr. Tank Bandotu nalla Garh-2 Chuhan 180000
8 C/o Irr. Tank Katal Chuhan Chuhan 180000
9 C/o Soil Cons. Work at Kapei Chuhan 100000
10 C/o Soil Cons. Work Irr. Kuhal Jaked garh-1 Chuhan 100000
11 C/o Irr. Tank at Travad Chuhan 100000
12 C/o Soil Cons. Work Payjal & rasta tandi nalli Mihenu Chuhan 60000
13 Repair pucci Kuhal & rasta Mugager narad & pucca path  Chuhan 80000
14 C/o Bawali at Amar Singh Land Mugager Chuhan 50000
15 C/o Irri. Kuhal Chani Chuhan 90000
16 C/o Irr. Kuhal at Bohana-3 Chuhan 100000
17 C/o pucca payjal nada narrad mugager Chuhan 40000
18 C/o Soil Cons. Work payjal Bawali Mihenu Chuhan 60000
19 C/o Soil Cons. Work payjal Gram Katal  Chuhan 40000
20 C/o Soil Cons. Work GPS mihenu Chuhan 80000
21 C/o Irr. Kuhal Tadi chuhan devi toli Chuhan 60000
22 C/o Irr. Kuhal raakha garh-2 Chuhan 60000
23 C/o Soil Cons. Work garh paniyali dhar Chuhan 200000
24 C/o Soil Cons. Work Khoya nali garh  Chuhan 100000
25 C/o Check dam & Soil Cons. Work garh road to garh Chuhan 200000
26 C/o kacha Talab at maliyad Travad Chuhan 100000
27 C/o soil cons. Work maliyad basti maliyad Travad Chuhan 100000
28 C/o Irr. Tank Dodini vay kut maag Chuhan 100000
  Total   2930000
1 C/o Bowali at Samannohat  Turkara 50000
2 C/o Drainage line at mijhali rah Turkara 80000
3 C/o Panihara at M. Reh Turkara 150000
4 C/o Bowali at Faati Turkara 50000
5 C/o Panihara at cheeri Turkara 50000
6 C/o Jeep road gagahar to chafru Turkara 300000
7 C/o Jeep road Dodan to nichali kaimbli Turkara 200000
8 C?o water drainage at gulahad  Turkara 40000
9 C/o Bowali at toowalu Turkara 50000
10 C/o Water drainage at gagahar Turkara 200000
11 C/o Soil cons. Work Draman amar s/o chaad land Turkara 100000
12 C/o Jeep road talab kulera to kulera village Turkara 500000
  Total   1770000
1 C/o Water harvesting tank bassa sadal  Sadal 100000
2 C/o Pucci kuhal chaladi nalla to uwansi  Sadal 100000
3 C/o water harvesting tank village lahad Sadal 100000
4 C/o Bowali chambe di bowali at doth Sadal 40000
5 C/o Pucci kuhal dholli to jhamirthu-2 Sadal 300000
6 C/o water tank village manooh Sadal 50000
7 C/o Water tank bagh doth Sadal 150000
8 C/o Bowali at Village makolusu Sadal 50000
9 C/o Bowali at karali da othwer Sadal 40000
10 C/o Talab at manooh Sadal 100000
11 C/o Soil. Cons. Work GPS doth Sadal 100000
12 C/o water tank tunia draver kelan Sadal 150000
13 C/o bowali at Jhamirthu Sadal 50000
14 C/o crate work at nadalu Sadal 100000
15 C/o soil. Cons. Work Guddu da nalla doth Sadal 100000
16 C/o kuhal chhoti rouni  kurnar Sadal 100000
17 C/o Kuhal Daloti village kelan Sadal 100000
18 C/o Water harvesting tank village doth dibber  Sadal 100000
19 C/o Water harvesting tank village  Saian da dibber Kelan Sadal 80000
20 C/o Bowali at chaffer village kuther Sadal 60000
21 C/o kuhal balod khad village nargada village doth Sadal 300000
22 C/o Soil cons. Work Near anganwari  bhawan Sadal 300000
  Total   2570000
1 C/o Irr. Tank at matnalli Raipur 200000
2 C/o Bowali and panihara at batolan Raipur 50000
3 C/o Bowali at dibb Raipur 50000
4 C/o Panihara at Gufa nalla Raipur 50000
5 C/o Bowali at muradi malatu Raipur 40000
6 C/o Kuhal nanali to sunela Raipur 200000
7 C/o Bowali at kuddi -2 Raipur 40000
8 C/o bowali harnala singa di reh Raipur 40000
9 C/o Bowali at kathuna Raipur 40000
10 C/o Bowali and panihara at talatu Raipur 50000
11 C/o Bowali and crate at raipur Raipur 60000
12 C/o Irr. Tank Youri Raipur 100000
13 C/o pipe line batolani to  makrolu Raipur 150000
14 C/o pipe line manjhle nale to fagot  Raipur 300000
15 C/o Irr. Tank nand kishor pathak land Raipur 100000
16 C/o Water tank GPS Raipur Raipur 30000
17 C/o Irr. Tank Upla raipur Raipur 100000
18 C/o Kuhal blood khad to gallu Raipur 80000
19 C/o Kuhal blood khad to salli ram house Raipur 100000
20 C/o Kuhal blood khad to ghandhi arjun land Raipur 200000
21 C/o Water tank talai roshan land Raipur 50000
22 C/o Soil cons. Work kouna ghar Raipur 200000
23 C/o Kuhal youri nalla to GSSS raipur Raipur 200000
24 C/o crate work padder draman Raipur 150000
25 C/o crate work praid Raipur 200000
26 C/o bowali at chail Raipur 30000
27 C/o Soil. Cons. Work  Raipur nalla both side  Raipur 200000
28 C/o irrigation Tank Luharka & Kluhal Raipur 300000
29 C/o Crate work kuddi ghar  Raipur 200000
30 C/o water tank Praid Raipur 50000
31 C/o bowali at ladoi  Raipur 30000
32 C/o Irrigation Tank Nadali Raipur 100000
33 C/o crate work at karar Raipur 100000
34 C/o  land dev. Work bagh raipur Raipur 100000
35 C/o Irr. Tank Meharna Raipur 100000
36 C/o crate work at bhagdani Raipur 100000
37 C/o crate work at dhali Raipur 100000
38 C/o  kuhal GSSS raipur to raipur Raipur 200000
39 C/o Kuhal youri nalla to youri Raipur 100000
40 C/o soil cons. Work Nadali Raipur 100000
41 C/o crate work nadali Raipur 100000
42 C/o Crate work narhelu Raipur 80000
43 C/o kuhal Balod khad to faati Raipur 200000
  Total   4970000
1 C/o Pacca Link Road main Road to mal Mata Sarog Rajain 300000
2 C/o Pacca Link Road Main Road to Draman S.C Basti  Rajain 200000
3 C/o Bawdy At Bounkhri Bhount Rajain 80000
4 C/o Pacci Kuhal Rajain Nala to Karnaid Rajain 300000
5 C/o Pacci kuhal dareg to Naddal Rajain 250000
6 C/o Pacci Kuhal Chanhal Khad to Kohldi  Rajain 300000
7 C/o Pacci Kuhal Jandli To Reda  Rajain 250000
8 C/o Pacci Kuhal Sihori to Naddal Rajain 150000
9 C/o Crate Work At Saned Nala Rajain 150000
10 C/o Crate Work At Sihoti Nala Rajain 80000
11 C/o Bawdy & Tank at Sarog Rajain 80000
12 C/o Pacci kuhal Rajain to Patoda Rajain 150000
13 C/o Bawady at Kehra Rajain 60000
14 C/o Bawdy at Pukhru & Khohli Rajain 60000
15 C/o crate work at Odla Nadlu to Kohldi Rajain 100000
16 C/o crate Work At Punga Kutla Nala Rajain 80000
17 C/o Water Tank Bad & tut Tappe da nal Rajain 80000
  Total   2670000
1 C/o Crate Work At Village kufru Kathala 100000
2 C/o Bawdy At lower Nahana Kathala 50000
3 C/o Crate Work &Galli Palling Kathla Near Moti Ram House Kathala 250000
4 C/o Pacci Kuhal Tilka Nala to Dalti Ram House Kathala 200000
5 C/o Crate Work Chafri Village Bhiyora Kathala 250000
6 Pipe Line & Tank Village nahana Kathala 200000
7 C/o Crate Work At Upper Nahana Kathala 100000
8 C/o Pacci Kuhal Gharana to Kut Nali & Tank Kathala 200000
9 C/o Crate Work At Maitihari Kathala 100000
10 C/o Pacca Talab Sanan Pani Bhiyora Lahar Kathala 90000
11 C/o Pacci Kuhal Nahana Nala to Upper Kathla Kathala 300000
12 C/o Pacci Kuhal Tilka Nala To Plah dramman Kathala 100000
13 C/o Bawdy At Bhiyora Kathala 50000
14 C/o Bawdy At Gouth Kathala 50000
15 C/o Crate Work At Athpathu & kut Kathala 200000
16 C/o Horticulture Plantation Work at Juhru Kathala 60000
17 C/o Horticulture Plantation Work at Kut Daleta Kathala 70000
18 C/o Crate Work At Nagan Kathala 75000
19 C/o Horticulture Plantation Work At Bassa Kathala 70000
20 C/o Horticulture Plantation Work Natod Nahana Kathala 70000
21 C/o Horticulture Plantation Work At Maitihari Kathala 80000
22 C/o Cheek Dam At Garniyara Nala Kathala 150000
23 C/o Pacci Pulli Barhal Khad Kathala 300000
24 C/o Crate work Near Animal Husbandary Kathla Kathala 80000
25 C/o Horticulture Plantation Work At Arad Kathala 60000
26 C/o Horticulture Plantation Work At Batolan Kathala 70000
  Total   3325000
1 C/o Crate Work nagni Nalla Bahadur Prithi Kairnail Land Garnotta 200000
2 C/o Jeepable Road Pulli To Chamaru Ram House Garnotta 300000
3 C/o Soil Con, Work Riyan Nalla Amar Singh Land Garnotta 200000
4 C/o Jeep Road Riyan Kulah To Sirli Nala Garnotta 200000
5 c/o crate work chambru Nalla Near Machine Garnotta 200000
6 C/o Kuhal Dainnag Nalla to Gared satpal Land Garnotta 160000
7 C/o Crate work Sahbo ram House Near Nalla Garnotta 200000
8 C/o Crate work At Kartar , Suffal Land Garnotta 200000
9 C/o Crate Work Garnotta Near Narso Ram Land Garnotta 200000
10 C/o JeepRoad Main road to ChailRam house  Garnotta 200000
11 C/o Soil Cons work Near Riyan Nalla Garnotta 200000
12 C/o Crate Work khagal kuhal to Suket Khadd Garnotta 200000
13 C/o Bobli At Sirli  Garnotta 150000
14 C/o Soil Cons Work Suket Khadd Baloo Garnotta 200000
15 C/o Kuhal Suket Khadd To Juhar Garnotta 100000
16 C/o Kuhal Sirli To Khola Garnotta 200000
17 C/o Kuhal Kuthal Garnotta Garnotta 100000
18 C/o Crate Work Chambru nalla Near Lamber Notod Garnotta 100000
19 C/o Bowli Near Chambru Nalla Garnotta 100000
  Total   3410000
1 C/o Bowali Durdalla Challara 60000
2 C/o flood Protection Challara Nalla Challara 500000
3 C/o Check dam Thakoli Nalla Challara 300000
4 C/o Bowli Mandralla Challara 60000
5 C/o Bowli Lower Durdalla Challara 60000
6 C/o Link Road Suda To Gangar Challara 300000
7 C/o Check Dam Bai Da Khola Challara 200000
8 C/o Link Road IPH Office To Gattu Challara 200000
9 C/o Crate Work Duwalla Nalla Challara 100000
10 C/o Irri. Kulah Naseeb House To Mariyari Challara 200000
11 C/o Crate work Nanholi Nalla Ghar  Challara 300000
12 C/o Link Road Main Road To GPS Challara Challara 300000
13 C/o Pulli Challara Near Bagtour House Challara 100000
14 C/o Check Dam Bai Da Khola  Badiya Da Bai Near Nalla Challara 100000
15 C/o Check Dam Near Noun  Challara 100000
  Total   2880000
1 C/o Jeep Road Main Road To Shamshan Ghat Chanhall Khadd Sihunta 150000
2 C/o Prevent Soil Errison Crate Work At Badiyan Di Bai 10 No  Sihunta 150000
3 C/o Jeep Road Shamshan Ghat Narelu Nalla  Sihunta 150000
4 C/o Bowli Miyan Da Bassa Sihunta 60000
5 C/o Jeep Road Dhadi Main Road To Raj Kumar House Sihunta 150000
6 C/o Bowli & Panihar With waterPond At Nagban Sihunta 100000
7 C/o Bowli Kanshi Ram House Sihunta 150000
8 C/o Irrigation Tank Dhoban At Surinder Land Sihunta 50000
9 C/o Talab At Smbal Sihunta 100000
10 C/o Pucca Sampark Marg Main Road To Patwar Khanna & Forest Rang Office Sihunta 80000
11 Bowli At Thapla Sihunta 60000
12 C/o Panihar At Kohaldi Sihunta 80000
13 C/o Bowli At Niyai Sihunta 60000
14 C/o Jeep Road Joof Khan House To Choubatta Sihunta 80000
15 C/o Kulah Main Road To Badi Sihunta 120000
16 C/o Jeep Road Bar To Tiyukra Sihunta 150000
17 C/o Talab at GPS Niyai Sihunta 150000
18 C/o Jeepable Pulli Belli Ram House Sihunta 200000
19 C/o Jeep Road Main Road To Chaman Singh House Near Tehsil Sihunta 80000
  Total   2120000
1 Talab At Kharal  DHULARA 80000
2 Gully PlugingAt Malhetra DHULARA 45000
3 C/o Soil' Cons' Work At Fatt DHULARA 80000
4 C/o Talab At Narehlu Chhapiyaru DHULARA 60000
5 C/o Irri Kuhal gagan House ToGPS kharander DHULARA 150000
6 C/O Irri' Kuhal Pritam House To Lower Mehra DHULARA 300000
7 C/O Irri' Kuhal Rappad To Rede Da Bad DHULARA 300000
8 C/oIrri Tank At Maltra DHULARA 200000
9 C/o Kuhal/Drain Main Road To Charah DHULARA 120000
10 C/o Drain Bahal To Luned Khad DHULARA 40000
11 C/o Gully Pluging At Chhoyey Di Nalli DHULARA 40000
12 C/o Soil Cons Work At Ralban DHULARA 40000
13 C/o Soil Cons Work At Lodhargarh DHULARA 40000
14 C/o Jeep Road Dugred To Mansa Matta Mander DHULARA 900000
15 C/o jeep road Main Road To bassa DHULARA 600000
16 C/o Jeep Road babdi To Ralban DHULARA 250000
17 C/o irri Tank mahinder Land DHULARA 80000
18 Irri Tank Bishan land DHULARA 80000
19 C/o Irri tank Shakti Chand land DHULARA 80000
20 C/o Bowli At Kulfain DHULARA 100000
21 C/oPannihar At dadar DHULARA 50000
22 C/o Bowli Qat Khabbar DHULARA 80000
23 C/o Soil Cons Work Mahinder land Ralban S/c DHULARA 120000
24 C/o Crate Work At Bassa DHULARA 80000
25 Pucca Jeep RoadMain Road To Lodhar Gar (PS) Dullara 500000
26 C/o Bowli At Tindlu DHULARA 80000
  Total   4495000
1 C/o Soil Cons Work At Sapru Nala Kakroti 120000
2 C/o Irri Tank At Gorat Kakroti 80000
3 C/o Soil Cons Work At GMS kakroti Kakroti 400000
4 C/o Check Dam At Suda Nala Kakroti 60000
5 C/o Irri tank At sandh Kakroti 70000
6 C/o Irri Tank Gorat Near Parakash Kakroti 70000
7 C/o Jeep Road main road To Gorat Kakroti 500000
8  C/o Bowli At Chalerna Kakroti 60000
9 C/o Jeep Road mahernu Tu Bassa Kakroti 150000
10 C/o Ambulance Road Vill Gorat Kakroti 200000
11 C/o Ambulance Road Dugrad To Chalerna Kakroti 300000
12 C/o Pacci jeep Road At Mahernu Kakroti 120000
13 C/o Check Dam At Sandh Nala Kakroti 80000
14 C/o Check dam At Tini Nala Kakroti 100000
  Total   2310000
1 C/o Irri Kuhal Kholi To Baldi THULEL 300000
2 C/o Check Dam At Jamni Da Khola THULEL 150000
3 C/o Jeep Road At brahmin House To Kharana THULEL 400000
4 C/o Water Tank At Drangri THULEL 150000
5 C/o Crate Work At Dhanot THULEL 200000
6 C/o Talab At Bardramman THULEL 300000
7 C/o Jeep Road At Tola Matta  To Kut THULEL 400000
8 C/o Plantatoin Work At Banoli  THULEL 100000
9 C/o Drain Work Amb To  Kopru THULEL 300000
10 C/O Check Dam At Bagi Nala THULEL 200000
11 C/o Jeep Road Goswami House To New Basti THULEL 150000
12 C/o Crate Work At Pandrah nala THULEL 60000
13 C/o water Tanki At Kelong Mander THULEL 80000
14 C/o Check Danm At Rachholi Khad THULEL 200000
15 C/o Crate Work At Noun Nala THULEL 200000
16 C/o Crate At Gsss THULEL THULEL 240000
17 C/o Horticulture Dev Work At Bhangian THULEL 100000
  Total   3530000
1 C/o Bawali at Bane Da Nala Upla Godhara Kathet 50000
2 C/o Irri. Kuhal at Dharla Kathet 200000
3 C/o Talab at Madiyan Di Dhar Kathet 100000
4 C/o Irr. Kuhal at Ruhani Kathet Kathet 300000
5 C/o Water Tank at Dohada Kathet 100000
6 C/o Irri. Kuhal at Majhali to Tharnka Kathet 250000
7 C/o Water Tank at Drumma Kathet 200000
8 C/o Talab at Kayari Kathet 100000
9 C/o Irri. Tank at Luhani Nalah Kathet 100000
10 C/o Irr. Tank at Jheda Sahala Kathet 200000
11 C/o Talab at Swaran Di Dhar  Kathet 200000
12 C/o Talab at Gatliyan Dhar Kathet 200000
13 C/o Talab at Bhatola Di Loon Kathet 200000
14 C/o Water Tan at Luharda Kahtet Kathet 100000
15 C/o Water Tank at Dal Kathet 100000
16 C/o Water Tank at Auasi Chhatreel Kathet 100000
17 C/o Irri .Kuhal at Sahala tu Nadda Kathet 200000
18 C/o Water Tank at Ghanger Kathet 150000
19 C/o Talab at Bharna Da Bassa Kathet 100000
20 C/o Kuhal at Lahari Kathet 100000
21 C/o Bawali at Kutt Vill. Chhatreel Kathet 50000
22 C/o Talab at Badi Dhar Kathet 100000
23 C/o Talab at Mad  Kathet 100000
24 C/o Talab at Bathun Kathet 100000
25 C/o Jeep Road at Godhara to Dal Bassa Kathet 500000
26 C/o Drain at R.D No.40/02 to 43/840 Kathet 200000
                                 Total   4100000
1 C/o Jeep Road Panchyat Ghar to Mohari Tundi 500000
2 C/o Jeep Road S.C Basti Dharna Tundi 300000
3 C/o Jeep Road Main Road to Shamshan Ghat  Bhalet  Tundi 300000
4 C/o Jeep Road Karnog to Chhountlu Tundi 300000
5 C/o Water Tank at Bharadi Tundi 100000
6 C/o Jeep Road Main Road to Banoli Tundi 300000
7 C/o Soil Cons. Work at Malotar Basti Banoli Tundi 300000
8 C/o Water Tank at Vill. Chhountlu Tundi 100000
9 C/o Jeep Road Main Road Bhedi Di Bhet Nali Tundi 300000
10 C/o Pucci Nali Near Ram Krishan House to Rakh Tundi 200000
11 C/o Jeep Road Main Road to Mehad Tundi 300000
12 C/o Jeep Road at G.P.S nBanoli to Louni Tundi 300000
13 C/o Soil Cons. Work at Kutt Tundi 300000
14 C/o Water Tank at Looni Tundi 100000
15 C/o Water Tank at Bari Tundi 100000
16 C/o Water Tank at Mohari Tundi 100000
17 C/o Water Tank Banoli Tundi 100000
18  C/o Water Tank at Tundi Tundi 100000
19 C/o Water Yojana at Ander Nalah to Bharadi,Kutt, Looni Tundi 200000
20 C/o Water Tank at Chhountlu Roof Rain Tundi 60000
21  C/o Water Tank at Banoli Roor Rain Tundi 60000
22 C/o Water Tank at Bharadi Roof Rain Tundi 60000
23 C/o Water Tank at Kutt Roof Rain Tundi 60000
24 C/o Water Tank at Bhasala Roof Rain Tundi 60000
25 C/o Water Tank at Baag Roof Rain Tundi 60000
26 C/o Water Tank at Bhedi Di Bhet Roor Rain Tundi 60000
27 C/o Water Tank at Ander Nalah Roof Rain Tundi 60000
28 C/o Water Tank at Chhountlu Near Satpal House Tundi 60000
29 C/o Water Tank at Mohari Roof Rain Tundi 60000
30 C/o Water Tank Near Nurdeen House Tundi 60000
                                  Total   4960000
1 C/o soil cons. Work at lohad Draman near Chhing Ground Chalama 100000
2 C/o Irr. Tank at Langhera Chalama 150000
3 C/o Drainking water Tank at Chalama-II  Chalama 150000
4 C/o soil cons . Work at  Mihall Chalama 100000
5 C/o soil cons. Work at Salodka Chalama 100000
6 C/o Jeep road main road to Dilbhadur house Chalama 200000
7 C/o Create work at Bonglla Chalama 150000
8 C/o soil cons work at Drabad Chalama 150000
                                    Total   1100000
1 C/o Talab at upper Kuntla Gadana 60000
2 C/o Draining dust water at lower Kuntla Gadana 100000
3 C/o Plantation work at Mangat Ram Land Bassa I.R.D.P Gadana 70000
4 C/o Draining dust water at Banohi Gadana 150000
5 C/o soil cons work at lower Nadinal Mariyala Gadana 150000
6 C/o Bowadi at lower Atwali near Jaisi Ram Ghar Gadana 50000
7 C/o soil cons. Work at lower Fogla Kutt Gadana 150000
8 C/o Bowadi  Lower Fogla at Madou Gadana 50000
9 C/o soil cons.work at Mornach Kathnu Gadana 200000
10 C/o soil cons. Work at lower Atwali Near Jaisi Ram Land Gadana 250000
11 C/o Bowadi at Gadana Gadana 40000
12 C/o Bowadi at Killa Gadana 50000
13 C/o soil cons work at Ghatnu near Hans Raj Land I.R.D.P Gadana 200000
14 C/o Bowadi at Mariyata Gadana 50000
15 C/o soil cons. Work at lower Fogla near main Path Gadana 150000
16 C/o soil cons. Work at Draman Gadana 150000
17 C/o Bowadi at Kihar Gadana 40000
18 C/o Bowadi at Bassi Gadana 60000
19 C/o soil cons work at Banohi Gadana 200000
20 C/o soil cons. Work at lower Dharmain Gadana 150000
21 C/o Bowadi at Ruhni Gadana 50000
                                        Total   2370000
1 C/o Galli Plagiing at Dhurasapad Jiyunta 150000
2 C/o soil cons work at vill. Bailly Jiyunta 200000
3 C/o Kuhal Lahad nala to Juhad Jiyunta 200000
4 C/o Bawadi at Ghuanidhar Jiyunta 50000
5 C/o Kuhal Khorti Kheranala Jiyunta 200000
6 C/o kuhal at Khaninala to Kuddi Jiyunta 300000
7 C/o Kuhal at Kurla Jiyunta 100000
8 C/o Bowadi at Dhundiyara (Salera) Jiyunta 50000
9 C/o Bowadi at Kunna near road Jiyunta 50000
10 C/o soil cons work at Aled Jiyunta 150000
11 C/o Link pucca path main road to Bastikutt Jiyunta 150000
12 C/o kuhal at upper Sakrera Jiyunta 300000
13 C/o land dev. at  Rakesh Kumar land at Khalaru(Kunna) I.R.D.P Jiyunta 50000
14 C/o Bowadi at Siyugat Nala Jiyunta 50000
15 C/o Draining dust water vill. Kurla Jiyunta 150000
16 C/o Check Dam at Lahad Jiyunta 150000
17 C/o Link path main road Punchpulla to Panchayat Ghar Jiyunta 150000
                                        Total   2450000
1 C/o Drinking Water Tank at Vill. Arufer Jandrog 80000
2 C/o Bowali at Bhabnetar (SC) Jandrog 50000
3 C/o Water Storage Check Dam on the  Kharadu Kuhal Jandrog 500000
4 C/o Plantation Work Vill. Rathbhoor Jandrog 200000
5 C/o Kuhal at Sairi Da Haar Jandrog 200000
6 C/o Plantation Work at Matiyal Chakki Jandrog 160000
7 C/o Kuhal from Randoli to lahri Bhagera Jandrog 150000
8 C/o Irr. Tank (Community) vill. Daliyal Jandrog 150000
9 C/o Road Repair Work (PWD) Dadriara to Baiska Jandrog 200000
10 C/o Kuhal Aenad Nadda to Bhabhnetar Kuldhar  Jandrog 200000
11 C/o Irr. Tank Bheem Singh S/o Machlu R/o Bhabhnetar (ST) Jandrog 120000
   Total   2010000
1 C/o Water Tank P/Manhuta (Tappa) Manhuta 120000
2 C/o Crate Work Kathuna (Khajoor) Manhuta 150000
3 C/o Soil Cons. Work at P/Manhuta Manhuta 150000
4 C/o Crate Work Kathuna (Har)  Upper Pulli Manhuta 150000
5 C/o Water Tank at Ruhni at the land of Janak  Manhuta 120000
6 C/o Soil Cons Work at Thehdu Brahman P/Manhutta Manhuta 120000
7 C/o Jeep Road Guffa Nalla to Bailla Manhuta 500000
8 C/o Crate work at Ladera Ghhar Manhuta 150000
9 C/o Soil Cons. Work at Daliya Di Bhaa Manhuta 300000
10 C/o Water Tank at Gadet Manhuta 100000
11 C/o Crate Work at Luhala Manhuta 120000
12 C/o Crate Work at Chirdi Nalli (P/Manhutta) Manhuta 130000
13 C/o Water Tank at Salana (Lahad) Manhuta 90000
14 C/o Soil Cons. Work at Ghared (Manhutta) Manhuta 125000
15 C/o Soil Cons. Work at Parli Siyun Nabathod Manhuta 150000
16 C/o Kuhal Gharat to Kattal Sammu Manhuta 200000
17 C/o Soil Cons. Work at Dhokdu Manhuta 125000
18 C/o Kuhal From Nagni to Ladera Manhuta 200000
19 C/o Watar Tank at Bhatti (Drouni) Manhuta 100000
20 C/o Land Dev. Work at Awansi (Siyun) Manhuta 125000
21 C/o Watar Tank Manhuta at the land of Shamdeen Manhuta 100000
22 C/o Kuhal at Chandroad (Sammu) Manhuta 2000000
23 C/o Water Tank Upper Kumahri Chiyun (PS) Manhuta 300000
24 C/o Crate Work at Kai (Kathuna) Manhuta 190000
   Total   5815000
1 C/o Kuhal from siyaran to Padrotu Parsiyara 250000
2 C /o Kuhal Nadlu to Dhanoo Parsiyara 80000
3 C/o Land Slide Work at Rupaiana Parsiyara 80000
4 C/o Irr. Tank at Uttam Chand ST Land Parsiyara 80000
5 C/o Bowali at Briada Parsiyara 30000
6 C/o Kuhal Lohlu Khad to Ghangaru Parsiyara 50000
7 C/o Land Slide Work at Dev. Raj R/o Kothipadar(IRDP) Parsiyara 70000
8 C/o Irr. Tank at Lahri Parsiyara 200000
9 C/o Kuhal Gharuru Nalla to Pukhar Parsiyara 200000
10 C/o Irr. Tank Rattno IRDP  Parsiyara 80000
11 C/o Land Dev. Work at Padhrut Parsiyara 80000
12 C/o Land Dev. At the land of Sant Ram ST R/o Kothipdar Parsiyara 90000
13 C/o Bowali at Ghatuna Parsiyara 30000
14 C/o Check Dam Nathod nalli Pukhar Parsiyara 200000
15 C/o Bowali at Khabar Parsiyara 30000
16 C/o Land Dev. Work at the land of Chandarmani IRDP R/o Mihar Parsiyara 40000
17 C/o Bowali at Salli Parsiyara 30000
18 C/o Land Dev work at the land of Simlo IRDP R/o Ghatuna Parsiyara 40000
19 C/o Irr. Tank at Siyaran Parsiyara 70000
20 C/o Check Dam  (RCC) Nadd Parsiyara 200000
21 C/o Irr. Tank at Upper Lahri Parsiyara 100000
22 C/o land Dev. Work Saran & Pakhandi R/o Bhatala Land Parsiyara 70000
23 C/o Land Dev. Work at Gharana Parsiyara 200000
24 C/o Crate work at Kutla Parsiyara 40000
25 C/o Land Dev. At the land of Onkar Singh R/o Lahri(IRDP) Parsiyara 35000
26 C/o Irr. Tank at Chanood Parsiyara 200000
27 C/o Land Dev. Work at the land of Naryan Singh (IRDP) Parsiyara 35000
28 C/o Land Slide Work at Kothipadar Parsiyara 200000
29 C/o Soil Con. Work at Ghatuna Parsiyara 80000
30 C/o Land Dev. Work at Karam Chand ST R/o Ghatuna Parsiyara 35000
31 C/o Bowali at Gadd Parsiyara 30000
32 C/o Land Work at Odiyal(Rupiana) Parsiyara 80000
33 C/o Land Slide Work Near GMS Paraiyara Parsiyara 200000
34 C/o Land Dev. Work at Jamna IRDP Land Parsiyara 40000
35 C/o Plantation Work at Sunita Devi SC Land R/o Talai Parsiyara 40000
36 C/o Plantation Work at Lahri Parsiyara 200000
37 C/o Land Dev. Work at kesar Singh ST Land R/o Parsiyara Parsiyara 35000
38 C/o Paniyar at Nagal Parsiyara 30000
39 C /o Irr. Tank at Chad ST Land R/o Parsiyara Parsiyara 70000
40 C/o Crate Work & Land Dev. Woek Nihar (PS) Parsiyara 500000
41 C/o Soil Con. Work at Dhroni (Chhow) Parsiyara 200000
   Total   4350000
1 C/o Watar tank at Baliyar nala Kudnu 275000
2 C/o Kuhal  Baliyar nala to gharate da badara tak  Kudnu 300000
3 C/o Crate work at Nag Mandhour  Kudnu 250000
4 C/o kuhal Baliyar to piyaje khet tak  Kudnu 160000
5 C/o Bowali & soil conss. Work  at Bhukaru  Kudnu 150000
6 C/o Bowali at Nag Mandhour Kudnu 175000
7 C/o kuhal at bhukaru nalla to Maaluba Kudnu 400000
8 C/o Kuhal talata to kuther  Kudnu 400000
9 C/o Bowali &soil. Cons. Work Langhin Kudnu 150000
10 c/o Soil cons. Work at kudnu  Kudnu 200000
11 C/o Kuhal Chambe to Sasan  Kudnu 425000
12 C/o Bobali & check daim vill. Ulehad  Kudnu 150000
13 C/o Crate work near by Chambe Kudnu 125000
14 C/o Kuhal Bhukaru to Salli  Kudnu 300000
15 C/o Water tank at Jhanuee Kudnu 200000
16 C/o Bowali & check dam at Talata  Kudnu 150000
17 C/o Crate work at Chamunda mata mandir near by Mankotia  Kudnu 200000
18 C/o Water tank at bhukru nada Kudnu 200000
   Total   4210000
1 C/o Soil cons. Work at Nichali Rouni Tunuatti 150000
2 C/o Jeep road main road to Hattali 2 Tunuatti 400000
3 C/o Soil cons. Work at Dagaho Tunuatti 100000
4 C/o Jeep roed main road Dagaho to Dravadi Tunuatti 400000
5 C/o Jeep road main road to Nichali Rouni Tunuatti 250000
6 C/o Panihar at Barula  Tunuatti 50000
7 C/o Babali at Dagaho Tunuatti 40000
8 C/o Kuhal at Khad to Amichand land Tunuatti 150000
9 C/o R/o Jeep road at Ghad to Dagho  Tunuatti 400000
10 C/o R/o Jeep roed Garniadi Tunuatti 500000
11 C/o Jeep road Parli Rouni Tunuatti 150000
12 C/o R/o jeep road Uppali Rouni  Tunuatti 250000
13 C/o Bobali at Bathroom Dravadi Tunuatti 50000
14 C/o Babali at Rouni Tunuatti 50000
15 C/o Soil cons. Work at Sunagar Dravadi Tunuatti 200000
16 C/o Soil cons. Work at Garniadi  Tunuatti 150000
17 C/o Soil cons. Work at Chhamber Tunuatti 200000
18 C/o Soil cons. Work at Khadi khad Tunuatti 150000
19 C/o Soil cons. Work at Jounda Tunuatti 50000
   Total   3690000
1 C/o Panihar at Goth (Badei) Malunda 50000
2 C/o Bobali at Nichali Bihali Malunda 50000
3 C/o Bobali at Nichla Samlot Malunda 50000
4 C/o Drain &Nalian at Kutt to Jot Malunda 1000000
5 C/o Bobali & Check Daim at Jawalamukhi  Mata Mandir Malunda 100000
6 C/o Drain at Draini to Jajadi Malunda 1000000
7 C/o Pipe line  Kidaki Kasrodi to Bhadua Malunda 300000
8 C/o Kuhal at Nada to Cheer Malunda 500000
9 C/o Babali at Baingla Malunda 100000
10 C/o Bobali & Snananghar near Masa ram house Malunda 100000
11 C/o Land Dev.Work at Kali mata mandir Samlot Malunda 500000
12 C/o Bobali AT Upla Khalotu Malunda 50000
13 R/o Plantaion work at Bhadrada Malunda 600000
14 R/o Plantaion work at Gwalnu Malunda 600000
15 R/o Plantaion work at Badei Rijarv Malunda 500000
16 R/o plantaion work at Dobhu jot Malunda 1000000
17 C/o Land dev. Work at Bankhandi mata Near Dhadu  Malunda 300000
18 C/o Soil Cons. Work Vill. BharaiNear Bowbli To Kararu (PS) Maloonda 300000
19 C/o Cheak daim at Bhavled Malunda 100000
   Total   7200000
1 C/o Kuhal Malhed to Banolag Banet 100000
2 C/o Panihar at Parryungal Banet 40000
3 C/o Kuhal Seri to Dugh Banet 50000
4 C/o Kuhal & soil cons.work at Saila  Banet 50000
5 C/o Kuhal & soil cons. Work at Gehrna Banet 100000
6 C/o Soil cons. Work at near pulli Naroli nalla Banet 100000
7 C/o Kuhal Chudana To Ghna Banet 150000
8 C/o Soil cons. Work at Banet nalla near DharamChand house ST Banet 240000
9 C/o Kuhal Graini to Dadara Near by Tippari Banet 50000
10 C/o Kuhal Chatolinala to Chatoli Banet 100000
11 C/o Soil cons. Work at GMS Banet Banet 100000
12 C/o Kuhal Malhed to Bhulaki Banet 100000
13 C/o Bobali at Uppali Chatoli Banet 50000
14 C/o Kuhal Narolinalla to Dakrouta Lakhnat Banet 150000
15 C/o Kuhal Paryungalnala to Dadariadi Banet 200000
16 C/o Kuhal Jatoonnala to Jatoon Banet 50000
17 C/o Bobali at Pukhari Banet 50000
18 C/o Kuhal Nichali naroli to Naera Banet 50000
19 C/o Jeep road Kainthly road to GMS Banet Banet 300000
20 C/o Flood cont. work at Jattoon Banet 300000
21 Soil cons. Work at Talaee Banet 60000
22 Soil cons. Work & Barist wall Kainthly road (HPPWD) Banet 200000
23 C/o Crate work at Chowari Banet road 0/410 to 2/280 (HPPWD) Banet 300000
24 C/o Irri. Tank Vill Priungal (PS) Banet 200000
25 C/o Irri. Tank Vill Khabbar (PS) Banet 200000
26 Soil Cons. Work at Talie Banet 60000
  Total   3350000
1 C/o Link road to main road to Kuhka  Bailly 300000
2 C/o Kuhal at Khadinala to Khadi  Bailly 200000
3 C/o Bobali at Tagloot Bailly 50000
4 C/o Bobali & Sananghar at Khadi Bailly 100000
5 C/o Kuhal Ronana Khaddi to Khadi  Bailly 200000
6 C/o Kuhal at Dhola to Khadi  Bailly 50000
7 C/o Water tank at Dravad  Bailly 300000
9 C/o Bobali at Draved Bailly 50000
10 C/o Link road Main road to Bhatoli Bailly 200000
11 C/o Bpbali at Lahad  Bailly 50000
12 C/o Plantaion work at Main roed to Panchyat Ghar  Bailly 200000
13 C/o Bobali at vill. Loona  Bailly 50000
  Total   1750000
1 C/O PUCCA TALAB AT VILLAGE KHUDRU MOTLA 300000
2 C/O PUCCA IRREGATION TANK AT VILLAGE NALOGA MOTLA 150000
3 C/O PUCCA IRREGATION TANK AT VILLAGE THATRA MOTLA 200000
4 C/O PUCCI KUHAL FROM KHADIARUNALA TO KUMAH VILLAGE RIHALI MOTLA 100000
5 C/O KUCHA IRREGATION TANK AT BAGGA MOTLA 80000
6 C/O PUCCA IRREGATION TANK AT VILLAGE PANIHADI MOTLA MOTLA 150000
7 C/O PUCCI KUHAL FROM KHADIYARU NALA TO SAIR LAND KUTHARA MOTLA 100000
8 C/O SOIL CONSERVATION WORK AT NALOGA KUTLI MOTLA 200000
9 C/O PUCCI KUHAL FROM DRON NALA TO CHAIN SINGH'S HOUSE MOTLA 150000
10 C/O PUCCI KUHAL FROM VILLAGE BEHI TO GHATIALU MOTLA 200000
11 C/O PUCCI KUHAL FROM KHADIARUNALA TO PATTI MOTLA 150000
12 C/O PUCCA IRREGATION TANK AT VILLAGE GHUANTLU MOTLA 150000
13 C/O PUCCA LINK ROAD FROM MAIN ROAD MOTLA TO BADLOI MOTLA 150000
14 C/O PUCCI KUHAL FROM KHUDRU NALA TO SAMIR KUMAR'S LAND MOTLA 300000
15 C/O IRREGATION TANK AT VILLAGE DAROGI ON AMAR SINGH'S LAND MOTLA 150000
16 C/O CHECK DAM WORK AT UPPER DRON NALA  MOTLA 150000
17 LAND DEVELOPMENT WORK AT RIHALI ON THAKUR RAM'S LAND MOTLA 50000
18 C/O PUCCI KUHAL AT VILLAGE BAGGA MOTLA 300000
19 C/O CHECK DAM AT VILLAGE MOTLA NALI MOTLA 150000
20 C/O LINK ROAD KHULLAR TO BHETHA VILLAGE MOTLA 500000
21 C/O LINK ROAD KUCHA FROM VILLAGE NALOH TO KHUDRU MOTLA 300000
22 C/O PUCCA LINK ROAD UPTO VILLAGE NERTA MOTLA 500000
23 C/O OF BABDI AT VILLAGE SUGARI AND RIHALI MOTLA 100000
24 C/O CHECK DAM NEAR CHANAL KHADD MOTLA MOTLA 500000
25 LAND DEVELOPMENT WORK MOTLA BAIR DRAMMAN MOTLA 100000
26 C/O CHECK DAM SC BASTI KUTHARA MOTLA 150000
27 LAND DEVELOPMENT WORK AT KHULAR BRAIH S.C. FAMILY MOTLA 100000
28 C/O LINK ROAD FROM MAIN ROAD MOTLA TO KHOHRA VILLAGE MOTLA 150000
29 PANIHAR AT VILLAGE DAROGI MOTLA 100000
30 C/O CHECK DAM AT GHUHANTAL NALA MOTLA 150000
31 C/O PUCCI KUHAL FROM DUUM TO KOLHI KUTHARA VILLAGE MOTLA 150000
32 C/O CHECK DAM AT SARALI NALA MOTLA 300000
33 LAND DEVELOPMENT WORK NEAR G.M.S. NALOH MOTLA 300000
34 C/O KUCHA JEEP ROAD G.P.S. NALOH TO VILLAGE NALOH MOTLA 300000
  Total   6880000
1 C/O Irrgation Tank At Vill Khajja BINNA 300000
2 C/O Bowly At Nirhelu BINNA 120000
3 C/O Irrigatioin Tank At Kotla BINNA 100000
4 C/O Water Tank At Simblu BINNA 100000
5 C/O Bowly Nirman At Dahad BINNA 100000
6 C/O Kuhal Nirman Bandhi To Chonthadu BINNA 150000
7 C/O Kuhal Nirman Sihayi To Ghutkar BINNA 200000
8 C/O Geep Road  Binna To Khalala -2 BINNA 300000
9 C/O Bowly Nirman At Bassa BINNA 100000
10 C/o Water Tank Kanjroti (PS) Binna 250000
11 C/O Bowly Nirman At Ghared BINNA 100000
  Total   1820000
1 R C C check Dem Near Chafaru nalla Morthu 200000
2 C /O bowaly Khawar Mohalla  Morthu 40000
3 C/O Bowaly Dukhadda Morthu 40000
4 C/O Bowaly Ghaloon Morthu 40000
5 C/O Bowaly Paralla Khuwara Morthu 40000
6 C/o Bowaly Bhatti Morthu 40000
7 C/O Talab Ghaloon Morthu 150000
8 C/O Talab at Hadathi Morthu 150000
9 C/O Bowaly Dhar Morthu 40000
10 C/O Bowaly at Bassa Morthu 40000
  Total   780000
1 C/O kuhal Upper bowaly To Dhroon Dhroon 200000
2 Water Tank Pidigarh Dhroon 100000
3 C/O Bowaly Malwan Near Bawd Dhroon 40000
4 C/O Bowaly Bhutal Dhroon 40000
5 C/O Bowaly Kawar Dhroon 40000
6 C/O Check Dem dhari nalla Dhroon 200000
7 C/O Check dem Bhutal nalla Dhroon 200000
8 C/o check dem at kabar nala Dhroon 150000
9 C/o chek dam at Nalah nalabuhtal Dhroon 150000
10 C./o Water tank at Nalah Dhroon 50000
11 C/o Water tank Gandhi Ram Julrh Dhroon 50000
12 C/o Water tank at Tilak Raj Malwan Dhroon 50000
13 C/o Jeeproad Main nRoad to G.P.S Buhtal Dhroon 400000
  Total   1670000
1 C/o Check Dam & Nali Near Shiv Mandhir Jolna Jolna 150000
2 C/o Bowali at Lahri Jolna 50000
3 C/o Pipe Line Ghar to Chackra Jolna 200000
4 C/o,bowal at Trratti Jolna 50000
5 C/o Bowali Rapair at Jolana Khas Jolna 30000
6 C/o Bowali & R.C.C Kuali Gungrah Jolna 150000
7 C/o Kuhal lahri to Chelrna Jolna 150000
8 C/o Bowali at Seta Bassa Jolna 50000
9 C/o Bowali at bhanwara Jolna 50000
10 C/o Bowali at Bhanlarhi Jolna 50000
11 C/o Bowali repair at Chachkra Jolna 30000
12 C/o Bowali at Kartha Di all Jolna 50000
13 C/o Jeeproad at Kawali to Nothore to Lundhra Jolna 100000
14 C/o Bowali at Bhanglahri R/W 2 Jolna 80000
  Total   1190000
1 C/oJeeproad atbvKohlan Head pump to Ghattu Balna 300000
2 C/o Kuhal at Dhamnta Khudd to Onthli Balna 150000
3 C/o Pulli at Riyarhu Near Shamshan Ghatt Balna 150000
4 C/o Kuhal at Thara to Sibhal Larah Balna 200000
5 C/o Jeeproad at Plah Balli to Vill. Bhatti Balna 250000
6 C/o Check dam at Kolhan Nala Balna 150000
7 C/o Talab at Bhated Balna 100000
8 C/o Soil Protection , at G.ms Baasa Balna 400000
9 C/o Check Dam at Cherla Khudd Balna 150000
10 C/o Kuhal At Ghattun to Saklah Balna 250000
11 C/o Jeeproad at Mian Road to Dignali Balna 400000
12 C/o Creat work at Larhu Thatra Balna 100000
13 C/o Creat waork at Ghatta Balna 100000
  Total   2700000
1 C/o Bowali Near Saligram House ward 2 Banikhet 25000
2 C/o Rain Water tank at Nirmla Duneria 3 Banikhet 50000
3 C/o Completion Link Road at Dhobi Mohhala Banikhet 400000
  Total   475000
1 C/o Soil Prot, Vill Dangral Talrhu Pukhri 70000
2 C/o  Bowali at Surkhigalla Pukhri 50000
3 C/o Bowali Vill, Kanda 2 Pukhri 50000
4 C/o Bowali Vill, Kahallu Pukhri 1 Pukhri 50000
5  C/o Sarak G.P.S Pukhri to Kanda Pukhri 100000
6 C/o Craet work Sallicoat Surkhigalla Pukhri 40000
  Total   360000
1 C/o Water tank at Gandyra Near Lekh Raj Gola 70000
2 C/o Bowali at Gandhyra Gola 50000
3 C/o Bowali at Seer Nala Gola 30000
4 C/o Water tank at Dharm Singh Parol Gola 45000
5 C/o Road Bhiora to Thoda Gola 140000
6 C/o Bowali at Sakunali Gola 40000
7 C/o Craet Work at Upper Bhiora Gola 150000
8 C/o Jeeproad Thamba to Dheriana Gola 350000
9 C/o Jeeproad at Parol to Bhiora Gola 500000
10 C/o Road Dheryan to Ghandhyra Gola 450000
11 C/o Soil Prot. Near G.P.S Bhiora Gola 300000
  Total   2125000
1 c/o Talab work at Baad Mornu 150000
2 c/o Bawali work at Kaniyarka Mornu 50000
3 c/o Kuhal work at Mornu to Dharoon Mornu 400000
4 c/o Pacci Nali (Drain) vill. Kail Mornu 300000
5 c/o Talab work at Lalhed Mornu 150000
6 c/o Bawali work at Baas Mornu 50000
7 c/o Bawali work at Kaniyarka-II Mornu 50000
8 c/o pacci Nali (Drain) vill.Bakan Mornu 150000
9 c/o Bawali work at Bakan Mornu 50000
10 c/o Bawali work at Gad Mornu 50000
11 c/o Bawali work at Dugh Mornu 50000
12 c/o Pacci Nali (Drain) Bakan-II Mornu 300000
  Total   1750000
1 c/o panihar at churhara Tapper 50000
2 c/o panihar at saluin tappar Tapper 50000
3 c/o panihar at jadinu dhunera Tapper 50000
4 c/o panihar at jukiyani kaniyarka Tapper 50000
5 c/o kuhal juhad to shiwala kuthed Tapper 300000
6 c/o panihar at chunheter near house of gian chand tappar Tapper 50000
7 c/o bawli at rithanu samma Tapper 50000
8 c/o drainage line basa to kaniyarka Tapper 300000
9 c/o bawli at dhunera Tapper 50000
10 c/o panihar at vill. chambi Tapper 50000
11 c/o water tank at tappar Tapper 100000
12 c/o drainage line at vill. danar Tapper 200000
13 c/o bawli at ghattu dhunera Tapper 50000
14 c/o drainage line at vill. tappar Tapper 300000
15 c/o panihar at vill dhamoie Tapper 50000
16 c/o water tank at vill. lulhar kut Tapper 150000
17 c/o bawli at lunah Tapper 50000
18 c/o land protection work vill tappar Tapper 300000
19 c/o link road main road to kuthed Tapper 300000
20 c/o link road lunah to kut Tapper 300000
21 c/o link road sama to saluin Tapper 500000
22 c/o link road chaman to sama phese-2 Tapper 400000
  TOTAL   3700000
1 C/o Linkroad Bag Balla to Rasloi Changrta Hatli 1500000
2 C/o Check Dam at Mahru Nala Ward no 2 Hatli 200000
3 C/o Jeeproad Loter to Shamshan Ghatt Hatli 480000
4 C/o Tarcol jeeproadmainroad to Saligram home Hatli 480000
5 C/o Pucci Kuhal to Main Kuhal road Ward 1 Hatli 200000
6 C/o Jeeproad Main road to Kewal Dogra House Hatli 200000
7 C/o Irr, Tank at mahru Ward no 2 Hatli 450000
8 C/o Kuhal Bhatti to Bhandola Hatli 480000
9 Hoti. Plan. Near A.D.M House Gudwana Hatli 400000
10 C/o Jeeproad at Shamshan Ghatt to Noan Hatli 480000
11 C/o Kuhal thatru to Dosla Hatli 300000
12 C/o Pucci kuhal Main Kuhal to Link Road Hatli 300000
13 C/o Jeeproad Changrta Bowali to Kahan Nali Hatli 400000
14 C/oJeeproad G.S.s.S Hatli to Gudwana Nala Hatli 500000
15 C/o Soil Port, Work Near Mahru Road Hatli 200000
  TOTAL   6570000
1 c/o Talab work at Malunda Bathri 300000
2 c/o Panihar work at Potka Bathri 100000
3 c/o Panihar work at Sangaui Bathri 60000
4 c/o Water tank work at dadgiyaar Bathri 300000
5 c/o Jeep Road main Road to GPS Malunda biya Nowasi Bathri 500000
6 c/o Talab work at Talatu Bathri 300000
7 c/o Water tank water supply with pipe work at malunda to Matiyana Bathri 500000
8 c/oWater Tank work at Kuhal Kotha to Bati Bathri 800000
9 c/o Kuhal work at Patwar Khana to Panchayt Ghar Bathri 300000
10 c/o Crate work at bathri Bathri 500000
11 c/o Crate work at Kumarka Bathri 200000
  TOTAL   3860000
1 c/o Water Tank Bajrerakdi Padhrotu 100000
2 c/o panihaar work at vill. Tikkar Padhrotu 100000
3 c/o Land Dev. Work & Soil Cons. Work at Bagudi Padhrotu 200000
4 c/o Panihaar work at vill.Khadawna Padhrotu 100000
5 c/o Panihar work at vill. Dramanu Padhrotu 100000
6 c/o Plantation work at Chalauni Jangul Padhrotu 60000
7 c/o Water sinchai tank Khalayu ram vill. Padhrotu Padhrotu 100000
8 c/o Bawali work at vill. Matola Padhrotu 50000
9 c/o Panihaar work vill Padhrotu Padhrotu 100000
10 c/o Land Dev. & Soil cons work at Matola to Talai Padhrotu 400000
  Total   1310000
1 c/o Talab work at Bhatoli Ossal 60000
2 c/o Talab work at  Reh Bhatoli Ossal 60000
3 c/o Water Tank work at Chaman Lal House to Khadnda Ossal 80000
4 c/o Water diveration Drain & Pacci Naliya work at vill. Khadnda Ossal 100000
5 c/o Panihaar work at Khadnda Ossal 40000
6 c/o Talab work at vill Rikhnali Ossal 70000
7 c/o Pacci Nali vill. Kadhyatti Harizen Basti Ossal 100000
8 c/o Talab work at vill. Guniyalla Ossal 80000
9 c/o Land Dev. & Soil Cons. Work at vill. Devidera Ossal 500000
  Total   1090000
1 c/o Water tank work at Rakesh's Land Gharota Rulyani 100000
2 c/o Water tank work at Sadhu Ram's Land Sodhana Rulyani 100000
3 c/o Water Tank work at Kasturi Lal's Land Bhadeeni Rulyani 100000
4 c/o Water Tank work at Rajender Ram's Land Bhadeeni Rulyani 100000
5 c/o Water Tank work at Kuldeep Ram's Land at Bhadeeni Rulyani 100000
6 c/o Water Tank work at AmeChand's Land Sodhana Rulyani 100000
7 c/o Water Tank work at Ajeet Kumar's Land Rulyani Rulyani 100000
8 c/o Water Tank work & Panihaar work at Rulyani Nalla Rulyani 100000
9 c/o Panihaar work at Kutt Rulyani Rulyani 150000
10 c/o Kuhal work at Sehla Nala to Nanku Ram's House Rulyani 200000
11 c/o Kuhal work at Panchayat Ghar to Chain Lal House Rulyani 200000
  Total   1350000
1  c/oChashma work at Laharu Gagaala Kamla 80000
2 c/o Kuhal work at Jaman to Khola Kamla 300000
3 c/o Bawali work at Nadd Kamla 80000
4 c/o Kuhal work at Tounr to Dramani Kamla 200000
5 c/o Kuhal work at Kunj Lal's Shop to KulBhushan Baag Kamla 80000
6 c/o Kuhal work at Kunj Lal's Shop to Kudhat Kamla 200000
7 c/o Pulli work at Sirli Nalla Kamla 300000
8 c/o Crate work at Suked Khad Kamla 200000
9 c/o Crate work at Dehar Khad Garneda Kamla 250000
10 c/o Crate work at Dehri Khad Kamla 200000
11 c/o Kuhal work at Suked Khad to Kaku Ram's Gharat Kamla 100000
12 c/o Chashma work at Targanda Painkhadi Kamla 80000
13 c/o Kuhal work at Suked Nalla to Sirli Nall Kamla 150000
14 c/o Soil Cons work at Laharu Kamla 100000
  Total   2320000
1 c/o Repair  Jeep Road karnata se Saloh bia Sarna  (For. Deppt) Jatroon 700000
2 c/o Repair  Jeep Road  Lahar to Saloh (For. Deppt.) Jatroon 500000
3 c/o Repair jeep Road Trimth to Jangla  (For. Deppt.) Jatroon 700000
4 c/o Jeep Road work at Bholag to Dadriydu (For. Deppt.) Jatroon 300000
5 c/o Repair Link Road Main road to jatroon (For. Deppt.) Jatroon 400000
6 c/o Work Water store Tank Chaman Singh's Land Kalehter ST Jatroon 300000
7 c/o Land Dev. Work at Surednder's Land Chou ST Jatroon 300000
8 c/o Drain & Pacci Naliya work at Trimth (PWD) Jatroon 500000
9 c/o Drain & Pacci Naliya work at Chuwadi to Lahar Raipur Road  (PWD) Jatroon 500000
10 c/o Water Store Tank work at  Near Lodhar Nalla Jangla Nalla Jatroon 200000
11 c/o Link Raod work  Saloh to Kalehetr(For. Deppt.) Jatroon 400000
12 c/o Link Raod work at Ghattu to Chou(For. Deppt.) Jatroon 400000
  Total   5200000
1 C/o Afforstation Work at Maghiyar Manola 50000
2 C/o Pucca talab at Niharu Khad Manola 80000
3 C/o Afforstation work at Kalodi Manola 40000
4 C/o Panihar at Dobra Manola 50000
5 C/o Pucci nali & Water Store Tank Manola 150000
6 C/o Pucci nali & Water Store Tank Gargad Manola 250000
7 C/o Soil prot. Work at Mukat Manola 80000
8 C/o Panihar at Khabbar Manola 50000
9 C/o Pucci nali & Water Store Tank Manola Manola 200000
10 C/o Pucci nali & Water Store Tank Tikkaru Manola 200000
11 C/o Soil prot. Work at Ghudyani Manola 80000
12 C/o Soil prot. Work at Kahliyata Manola 100000
13 C/o Pucca talab at Zhaluda Khad  Manola 80000
14 C/o Pucci nali & Water Store Tank Lahad Chhana Manola 200000
15 C/o Soil prot. Work at Gadiyar Manola 100000
16 C/o Check Dam at Thanda Paani Manola 150000
17 C/o Road from Link Road to Khilpad Manola 200000
18 C/o Kuhal from Khangla to Jokna Manola 200000
19 C/o Panihar at Jankhara Manola 50000
20 C/o Soil prot. Work at Bagga to Luharka Manola 80000
21 C/o Soil Prot. Work at Near Bharudi Pulli Manola 300000
  Total 2690000
1243 Grand Total   197950000