Sanction No.-DRDA-CBA-(NREGA)/2008-07-1230-35 |
Dated:- 24/06/2008 |
|
Total No of Schemes: 572 |
Amount |
33760392 |
|
Sr. No. |
Name of Schemes |
Gram Panchayats |
Sanction Amount |
|
1 |
C/O Soil conservation work lower Dramman 1st phase |
Chalama |
50000 |
|
2 |
C/O Soil conservation work at Findal |
Chalama |
50000 |
|
3 |
C/O Soil conservation work Upper Dramman 2nd phase |
Chalama |
50000 |
|
4 |
C/O Soil conservation work at Mihal |
Chalama |
50000 |
|
|
TOTAL |
|
200000 |
|
1 |
C/O Soil Conservation work at Badhali |
Kakira Jarei |
30000 |
|
2 |
C/O Plantation work in Angela Village |
Kakira Jarei |
26392 |
|
3 |
C/O Talab near Duna Panihar |
Kakira Jarei |
20000 |
|
4 |
C/O Plantation work at Dhani Bairi |
Kakira Jarei |
40000 |
|
5 |
C/O Nursery near Manguh at gadiada |
Kakira Jarei |
25000 |
|
6 |
C/O Soil conservation work at Samlahad |
Kakira Jarei |
50000 |
|
7 |
C/O Boily at Magnooh |
Kakira Jarei |
30000 |
|
8 |
C/O Boily at Samlahad |
Kakira Jarei |
25000 |
|
9 |
C/O Talab at Nahlani |
Kakira Jarei |
15000 |
|
|
TOTAL |
|
261392 |
|
1 |
C/O Jeepable road main road balana to Bawa Peer |
Balana |
250000 |
|
2 |
C/O Link road - Basa to School Gata |
Balana |
100000 |
|
|
TOTAL |
|
350000 |
|
1 |
C/O Soil Conservation work near Bangotu |
Kakroti |
50000 |
|
2 |
C/O Jeepable road Mahernu to Balla |
Kakroti |
220000 |
|
3 |
C/O Soil Conservation work Village Churnal |
Kakroti |
70000 |
|
4 |
C/O Soil Conservation work at Kakroti |
Kakroti |
200000 |
|
|
TOTAL |
|
540000 |
|
1 |
C/O Khul at gharat Nala o Duman Nala |
Hatli |
50000 |
|
2 |
C/O Talab at Balla |
Hatli |
15000 |
|
|
TOTAL |
|
65000 |
|
1 |
C/O Tank at Village Matt |
Thulel |
30000 |
|
2 |
C/O Soil Conservation work at Dhanot |
Thulel |
30000 |
|
3 |
C/O Soil Conservation work at Kholu Khadana |
Thulel |
80000 |
|
4 |
C/O Bowdi at Nalad |
Thulel |
30000 |
|
5 |
C/O Khul at Chanata to Bajlori |
Thulel |
100000 |
|
6 |
C/O Bowdi at Bassa |
Thulel |
50000 |
|
7 |
C/O Talab at Anai |
Thulel |
20000 |
|
8 |
C/O Soil Conservation work at Kyadi Anai |
Thulel |
20000 |
|
9 |
C/O Soil Conservation work at Khola |
Thulel |
100000 |
|
10 |
C/O Water Tank at Khadana |
Thulel |
30000 |
|
11 |
C/O Soil Conservation work at Badla Laad Bhagyani |
Thulel |
40000 |
|
12 |
C/O Soil Conservation work at Anai Khas |
Thulel |
20000 |
|
13 |
C/O Khul at Kholu to Bhasla |
Thulel |
30000 |
|
14 |
C/O Soil Conservation work at Suradi |
Thulel |
20000 |
|
15 |
C/O Soil Conservation work at Sudda |
Thulel |
80000 |
|
16 |
C/O Plantation Bagbani at Badla |
Thulel |
25000 |
|
17 |
C/O Plantation work at Bhayani |
Thulel |
25000 |
|
18 |
C/O Khul at Dhandhar to Dugli |
Thulel |
25000 |
|
19 |
C/O Khul at Farm to Satbotu |
Thulel |
30000 |
|
20 |
C/O Soil Conservation work at Drabah |
Thulel |
20000 |
|
21 |
C/O Soil Conservation work at Balli to Banoli |
Thulel |
20000 |
|
22 |
C/O Bowdi at Seer |
Thulel |
30000 |
|
23 |
C/O Tank at Sudly |
Thulel |
30000 |
|
|
TOTAL |
|
885000 |
|
1 |
C/O Crate work at Chhawalu |
Awahn |
60000 |
|
2 |
C/O Soil Conservation work at Satroli |
Awahn |
56000 |
|
3 |
C/O Panihar at Chhabalu |
Awahn |
36000 |
|
4 |
C/O Panihar at Paleth |
Awahn |
36000 |
|
5 |
C/O Soil Conservation work at upper Banuni |
Awahn |
100000 |
|
6 |
C/O Soil Conservation work at Jhande di Mall |
Awahn |
50000 |
|
7 |
C/O Soil Conservation work at Bainska Nala |
Awahn |
100000 |
|
8 |
C/O Soil Conservation work at Lanjera |
Awahn |
100000 |
|
9 |
C/O Crate work at Padi Nala |
Awahn |
160000 |
|
10 |
C/O Panihar at Baroian ki bodi |
Awahn |
50000 |
|
11 |
C/O Panihar at Dhamkheli Sail Nala |
Awahn |
36000 |
|
|
TOTAL |
|
784000 |
|
1 |
C/O Soil Conservation work at Bhalbar |
Hobar |
100000 |
|
2 |
C/O Talab at Bhalbar |
Hobar |
50000 |
|
3 |
C/O Bowdi at Bhalbar |
Hobar |
20000 |
|
4 |
C/O Bowdi at Garoda |
Hobar |
20000 |
|
5 |
C/O Bowdi & Panihar at Hadda |
Hobar |
30000 |
|
6 |
C/O Bowdi & Panihar at Dramman |
Hobar |
30000 |
|
7 |
C/O Panihar at Utki |
Hobar |
20000 |
|
8 |
C/O Bowdi at Lahad |
Hobar |
20000 |
|
9 |
C/O Bowdi & Panihar at Bassa |
Hobar |
30000 |
|
10 |
C/O Soil Consrvation work at Katli to Nalni |
Hobar |
50000 |
|
11 |
C/O Bowdi Jadoli Nala |
Hobar |
30000 |
|
12 |
C/O Conservation work at Garoda |
Hobar |
50000 |
|
13 |
C/O Talab at village Lahad |
Hobar |
30000 |
|
14 |
C/O Crate work at Matihar |
Hobar |
50000 |
|
15 |
C/O Crate work at Hathola |
Hobar |
50000 |
|
16 |
C/O Panihar & Bowdi at Thandapani |
Hobar |
25000 |
|
17 |
C/O Bowdi Garkhada |
Hobar |
30000 |
|
18 |
C/O Nursery at Jadoli |
Hobar |
100000 |
|
|
TOTAL |
|
735000 |
|
1 |
C/O Nursery Devlopment At Gtanedy Kalampul |
Parchhod |
50000 |
|
2 |
C/O Soil Conservation work at Naddal Khaggal |
Parchhod |
100000 |
|
3 |
C/O Land Development work at chakkipul -ll |
Parchhod |
20000 |
|
4 |
C/O Bowdi Village Katly Basa |
Parchhod |
50000 |
|
5 |
C/O Soil Conservation work at Narola-l |
Parchhod |
50000 |
|
6 |
C/O Soil Conservation work at Parchhod-ll |
Parchhod |
50000 |
|
7 |
C/O Land Development work at Naddal Than-ll |
Parchhod |
50000 |
|
8 |
C/O Soil Conservation work at Village Tribbly-l |
Parchhod |
50000 |
|
9 |
C/O Soil Conservation work at Narola-ll |
Parchhod |
50000 |
|
10 |
C/O Soil Conservation work at Kattal ward Hathidhar-l |
Parchhod |
50000 |
|
11 |
C/O Soil Conservation work at Pail Chakki Pul |
Parchhod |
50000 |
|
12 |
C/O Tank at Village Narola near Chanoli |
Parchhod |
25000 |
|
13 |
R/o Talab at BhigoDad Burj |
Parchhod |
20000 |
|
14 |
C/O Soil Conservation work at Village Lahru-l |
Parchhod |
50000 |
|
15 |
C/O Bowdi at Lahri Bhati |
Parchhod |
35000 |
|
16 |
C/O Plantation at Harijan Basti Samna Bassa |
Parchhod |
20000 |
|
17 |
C/O Bowdi at Village Trimbly |
Parchhod |
40000 |
|
18 |
C/O Soil Protection work at vill. Pravat-l |
Parchhod |
50000 |
|
19 |
C/O Bowdi & R/o Well at Village Parvai |
Parchhod |
60000 |
|
20 |
C/O Plantation at Village Ghaiyan da Ghar |
Parchhod |
30000 |
|
21 |
R/o Well at Lower Narola |
Parchhod |
20000 |
|
22 |
C/O Bowdi at Village Parchhod |
Parchhod |
40000 |
|
23 |
C/O Plantation at Village Naddal |
Parchhod |
25000 |
|
24 |
C/O Soil Conservation work at Parvai-l |
Parchhod |
50000 |
|
25 |
C/O Soil Conservation work at Bai da nala-l |
Parchhod |
50000 |
|
26 |
C/O Soil Conservation work at Village Barla-ll |
Parchhod |
50000 |
|
27 |
C/O Soil Conservation work at lower.Narola-l |
Parchhod |
50000 |
|
28 |
C/O Soil Conservation work at Lahru-l |
Parchhod |
50000 |
|
29 |
C/O Soil Conservation Work near Chaniyah Bowdi - I |
Parchhod |
50000 |
|
30 |
R/o Talab at Parchore |
Parchhod |
50000 |
|
31 |
C/O Bowdi at Chouradu & Garli |
Parchhod |
50000 |
|
32 |
R/o Talab at Kathlu & Hathidhar |
Parchhod |
20000 |
|
|
TOTAL |
|
1405000 |
|
1 |
C/O Tank at Tulud |
Ghatsani |
30000 |
|
|
TOTAL |
|
30000 |
|
1 |
C/O Plantation at Lahari Salam |
Sudli |
50000 |
|
|
TOTAL |
|
50000 |
|
1 |
C/O Soil conservation Work at vill. Badel |
Nanikhadd |
100000 |
|
2 |
C/O Soil Conservation Work at Nanikhud (Jarai) |
Nanikhadd |
100000 |
|
3 |
C/O Plantation at road side at Badel |
Nanikhadd |
80000 |
|
4 |
C/O Panihar at Ganod |
Nanikhadd |
20000 |
|
|
TOTAL |
|
300000 |
|
1 |
C/O Soil Conservation Work at upper Guna Nalla |
Tunuhatti |
15000 |
|
2 |
C/O Bowdi at vill. Dagoh |
Tunuhatti |
30000 |
|
3 |
C/O Bowdi at vill. Barula |
Tunuhatti |
23000 |
|
4 |
C./o Talab at Rouni |
Tunuhatti |
40000 |
|
5 |
C/O Soil Conservation Work at Garnairi |
Tunuhatti |
15000 |
|
|
TOTAL |
|
123000 |
|
1 |
C/O Soil Conservation Work at Bailla nalla |
Kharera |
50000 |
|
2 |
C/O Soil Conservation Work at Faner Drabber |
Kharera |
50000 |
|
3 |
C/O Soil Conservation Work at Ohar near Bowdi |
Kharera |
50000 |
|
4 |
C/O Plantation at Ghjuien |
Kharera |
100000 |
|
5 |
C/O Soil Conservation Work at Sapari nalla |
Kharera |
20000 |
|
6 |
C/O Soil Conservation Work at Talatu |
Kharera |
42000 |
|
7 |
C/O Check Dam from Kali Matti to Salyana Da Bassa |
Kharera |
40000 |
|
8 |
C/O Soil Conservation Work at Gharuien |
Kharera |
30000 |
|
9 |
C/O Soil Conservation Work at vill. Mohat |
Kharera |
72000 |
|
10 |
C/O Check Dam at Dhiuen Dhar |
Kharera |
30000 |
|
11 |
C/O Bowdi at Hulatter |
Kharera |
30000 |
|
12 |
C/O Soil Conservation Work at Bhand Ki Bowdi |
Kharera |
50000 |
|
13 |
C/O check Dam at Dola nalla |
Kharera |
40000 |
|
|
TOTAL |
|
604000 |
|
1 |
C/O Soil Conservation Work at Bhutani nalla |
Taragrah |
40000 |
|
2 |
C/O Soil Conservation Work at Bindli |
Taragrah |
40000 |
|
3 |
C/O Soil Conservation Work at Mahala |
Taragrah |
40000 |
|
4 |
C/O Soil Conservation Work at Kutt |
Taragrah |
40000 |
|
5 |
C/O Soil Conservation Work at Batti |
Taragrah |
40000 |
|
6 |
C/O Soil Conservation Work at Bhadela |
Taragrah |
40000 |
|
7 |
C/O Soil Conservation Work at dangari Nala |
Taragrah |
40000 |
|
8 |
C/O Soil Conservation Work at Dangari Katlu |
Taragrah |
50000 |
|
9 |
C/O Jeepable Road at Katori to Khui |
Taragrah |
50000 |
|
10 |
C/O Soil Conservation Work at Ludhian |
Taragrah |
40000 |
|
11 |
C/O Soil Conservation Work at Jajdi |
Taragrah |
50000 |
|
12 |
C/O Bowdi at Sapdia |
Taragrah |
50000 |
|
13 |
C/O Bowdi Alo |
Taragrah |
40000 |
|
14 |
C/O Soil Conservation Work at Baredu |
Taragrah |
40000 |
|
|
TOTAL |
|
600000 |
|
1 |
C/O Soil Conservation Work at Kaluganj |
Kakira Kasba |
75000 |
|
2 |
C/O Puli at Badnala Village Talara |
Kakira Kasba |
50000 |
|
|
TOTAL |
|
125000 |
|
1 |
C/O Bowdi Barla |
Mail |
25000 |
|
2 |
C/O Land Developmant Work at Tanukhar |
Mail |
50000 |
|
3 |
C/O Soil Conservation. Work at Parla Mail |
Mail |
50000 |
|
4 |
C/O Panihar at Maniyara da Bassa |
Mail |
25000 |
|
5 |
C/O Soil Conservation Work at Kattal |
Mail |
50000 |
|
6 |
C/O Bowdi Charmani |
Mail |
25000 |
|
7 |
C/O Nursary arasing at Kulther |
Mail |
50000 |
|
8 |
C/O Khul from Jawali to Drabber |
Mail |
50000 |
|
9 |
C/O Puli at Gudnala |
Mail |
70000 |
|
10 |
C/O Land Development Work at Kapadi |
Mail |
50000 |
|
11 |
C/O Soil Conseration Work at Dramman |
Mail |
50000 |
|
12 |
C/O Pulli at Palai nalla |
Mail |
50000 |
|
13 |
C/O Water Tank at Panjola |
Mail |
50000 |
|
14 |
C/ o Check Dam at Delag |
Mail |
50000 |
|
|
TOTAL |
|
645000 |
|
1 |
C/O Khul Lalhed to Miornu |
Mornu |
150000 |
|
2 |
C/O Bowdi at vill. Mariyala |
Mornu |
40000 |
|
3 |
C/O Pulli near Bag nalla vill. Klalhed |
Mornu |
40000 |
|
4 |
C/O Soil Conservation Near Khud nalla Kehal |
Mornu |
100000 |
|
|
TOTAL |
|
330000 |
|
1 |
C/O Soil Conservation Work at Garh Dhar Drabber |
Chuhan |
100000 |
|
2 |
C/O Irrigation Tank at Mihanu thera |
Chuhan |
50000 |
|
3 |
C/O Plantation from Garh nalla to Buhanna road side |
Chuhan |
20000 |
|
|
TOTAL |
|
170000 |
|
1 |
C/O Puli at Banet nalla |
Kahari |
100000 |
|
2 |
C/O Soil Conservation Work at Kulbara |
Kahari |
100000 |
|
3 |
C/O Puli at Raid nalla |
Kahari |
100000 |
|
4 |
C/O Soil Conservation Work at Rakhed |
Kahari |
100000 |
|
5 |
C/O Puli at Banni boat nalla |
Kahari |
100000 |
|
6 |
C/O Soil Conservation Work at Kali ghori |
Kahari |
100000 |
|
7 |
C/O Puli at Alen khol nalla |
Kahari |
100000 |
|
8 |
C/O Khul from Chouri to Kahari |
Kahari |
100000 |
|
9 |
C/O Puli at Kathyaru nalla |
Kahari |
100000 |
|
|
TOTAL |
|
900000 |
|
1 |
C/O Bowdi at Banar |
Manola |
36000 |
|
2 |
C/O Plantation at Mandhiyar |
Manola |
48000 |
|
3 |
C/O Puli at Khangala nalla |
Manola |
42000 |
|
4 |
C/O Nursary arasing at Tikkru nalla |
Manola |
60000 |
|
5 |
C/O Creat work at Granger to Tikkru |
Manola |
90000 |
|
6 |
C/O Khul from Khangakla to Jokna |
Manola |
48000 |
|
7 |
C/O Soil conservation Work at Tivvi nalla |
Manola |
60000 |
|
8 |
C/O Creat work from main road to Manola |
Manola |
90000 |
|
9 |
C/O Plantation at Tikkru niharu |
Manola |
60000 |
|
10 |
C/O Plantation at Manola |
Manola |
48000 |
|
11 |
C/O Creat work at Ghared |
Manola |
48000 |
|
12 |
C/O Pulli at Tikkru nalla |
Manola |
24000 |
|
13 |
C/O Tank at Niharu |
Manola |
24000 |
|
14 |
C/O Khul from Dhayanu to Tikkru |
Manola |
30000 |
|
|
TOTAL |
|
708000 |
|
1 |
C/O Bowdi at Village Bhiyura |
Gola |
25000 |
|
2 |
C/O Water Conservation. at vill. Gorat |
Gola |
5000 |
|
3 |
C/O Creat Work at Manjholka |
Gola |
60000 |
|
|
TOTAL |
|
90000 |
|
1 |
C/O Panihar at Village Bainska |
Ossal |
40000 |
|
2 |
C/O Soil conservation work at Bhiknu Nala |
Ossal |
50000 |
|
3 |
C/O Talab at Village Ray Bhatoli |
Ossal |
40000 |
|
4 |
C/O Puli at Kurag Nala |
Ossal |
160000 |
|
5 |
C/O Irrigation Tank at Bhikhanu |
Ossal |
160000 |
|
|
TOTAL |
|
450000 |
|
1 |
C/O Jeepable Road at Thanda Pani to Drabbad |
Padhrotu |
100000 |
|
2 |
C/O Soil conservation Work at Drammnu, Bhagudi, Danun,ThandaPani |
Padhrotu |
50000 |
|
3 |
C/O Jeepable Road at Matola to Lubane da Dera |
Padhrotu |
100000 |
|
4 |
C/O Plantation work at Chalun & Nabasi |
Padhrotu |
54000 |
|
5 |
C/O Panihar at Kabaintu |
Padhrotu |
22000 |
|
6 |
C/O Nursery at Matola |
Padhrotu |
100000 |
|
7 |
C/O Puli Nudd School to Thandapani |
Padhrotu |
50000 |
|
8 |
C/O Tank Tikkar |
Padhrotu |
50000 |
|
9 |
C/O Soil Conservation. Work at Matola. Khadava, Libane da Dera |
Padhrotu |
50000 |
|
10 |
C/O Plantation at Jangle Matola |
Padhrotu |
54000 |
|
11 |
C/O Tank Pukhari |
Padhrotu |
50000 |
|
12 |
C/O Soil Conservation. Work at Tikkar & Padhrotu |
Padhrotu |
50000 |
|
13 |
C/O Talab at Chaloon |
Padhrotu |
50000 |
|
14 |
C/O Plantation work at Bhagudi, Dramnu,Pukhari,Gumla |
Padhrotu |
54000 |
|
15 |
C/O Soil Conservation. Work at Nabasi & Chaloon |
Padhrotu |
50000 |
|
16 |
C/O Plantation Work at Jangle Padhrotu & Tikkar |
Padhrotu |
54000 |
|
17 |
C/O Panihar Tabela |
Padhrotu |
25000 |
|
18 |
C/O Water Tank at Tabela |
Padhrotu |
23000 |
|
19 |
C/O Plantation Work at Matola |
Padhrotu |
36000 |
|
|
TOTAL |
|
1022000 |
|
1 |
C/O Soil Conservation. Work at Kunna Bassa |
Jolna |
100000 |
|
2 |
C/O Soil Conservation. Work at Chhachhkda |
Jolna |
60000 |
|
3 |
C/O Jeeable Road at Amb ke Fer to Chaldani |
Jolna |
100000 |
|
4 |
C/O Soil Conservation. Work at Kotha |
Jolna |
50000 |
|
5 |
C/O Soil Conservation. Work at Harijan Basti |
Jolna |
100000 |
|
6 |
C/O Soil Conservation. Work at Ludera |
Jolna |
50000 |
|
7 |
C/O Link Road - Main Jolna to Upper Jolna |
Jolna |
200000 |
|
|
TOTAL |
|
660000 |
|
1 |
C/O Soil Conservation. Work at Village Drabbad |
Balera |
80000 |
|
2 |
C/O Soil Conservation. Work at Village Damredu |
Balera |
60000 |
|
3 |
C/O Soil Conservation. Work at Village Chatluni |
Balera |
50000 |
|
4 |
C/O Soil Conservation. Work at Village Kutt No 11 |
Balera |
50000 |
|
|
TOTAL |
|
240000 |
|
1 |
C/O Khul Bithat Nala to Lower Bithal |
Khargat |
100000 |
|
2 |
C/O Crate Work at Nagan |
Khargat |
70000 |
|
3 |
C/O Khul at Vill Nalatu to Nagan |
Khargat |
100000 |
|
4 |
C/O Jeepable road at Chhuad to Dharbai |
Khargat |
150000 |
|
5 |
C/O Check Damat Dron Nala |
Khargat |
80000 |
|
6 |
C/O Talab at Vill Jameyadu Talai Banoi |
Khargat |
80000 |
|
7 |
C/O Soil Conservation. Work at Kaliyana |
Khargat |
55000 |
|
8 |
C/O Puli at Village Lohali Khadd l |
Khargat |
100000 |
|
9 |
C/O Crate work at Lower Nagani & Nalatu Nala |
Khargat |
60000 |
|
10 |
C/O Land Development Work at Khargat |
Khargat |
100000 |
|
11 |
C/O Crate Work at Ruhad, Khakhrun,Trimble Nala |
Khargat |
60000 |
|
12 |
C/O Puli at Village Lohali Khadd ll |
Khargat |
100000 |
|
13 |
C/O Khul at Ket to Chhardani |
Khargat |
80000 |
|
|
TOTAL |
|
1135000 |
|
1 |
C/O Khul at Lahad Nala to Dramman |
Tikkari |
100000 |
|
2 |
C/O Puli at Khahar Nala |
Tikkari |
100000 |
|
|
TOTAL |
|
200000 |
|
1 |
C/O Puli at Chamani Khadd |
Tappar |
250000 |
|
2 |
C/O Panihar at Vill Garani |
Tappar |
50000 |
|
3 |
C/O Soil Conservation Work at Dabrain |
Tappar |
75000 |
|
4 |
C/O Bowdi at Dhunera |
Tappar |
33000 |
|
5 |
C/O Soil Conservation. Kannaid to Lunah |
Tappar |
40000 |
|
|
TOTAL |
|
448000 |
|
1 |
C/O Bowdi at Natoud Lower Fogla |
Gadana |
20000 |
|
2 |
C/O Soil Conservation Work at Kharoti |
Gadana |
40000 |
|
3 |
C/O Bowdi Lower Atwal |
Gadana |
20000 |
|
4 |
C/O Soil Conservation at Lower Fogla |
Gadana |
60000 |
|
5 |
C/O Bowdi Nadi Nall |
Gadana |
20000 |
|
6 |
C/O Soil Conservation At Upper Nadinal |
Gadana |
30000 |
|
7 |
C/O Soil Conservation At Lower Chalera |
Gadana |
40000 |
|
8 |
C/O Nursery & Tank at Bharadi |
Gadana |
40000 |
|
9 |
C/O Soil Conservation at Kihar |
Gadana |
50000 |
|
10 |
C/O Soil Conservation at Ghatnu |
Gadana |
40000 |
|
11 |
C/O Soil Conservation at Gadana |
Gadana |
30000 |
|
12 |
C/O Bowdi at Mornach |
Gadana |
30000 |
|
13 |
C/O Soil Conservation at Malohad |
Gadana |
30000 |
|
|
TOTAL |
|
450000 |
|
1 |
C/O Soil Conservation Work at Dhuda sappad |
Jiyunata |
50000 |
|
2 |
C/O Soil Conservation work at Sakrera |
Jiyunata |
50000 |
|
3 |
C/O Khul at Drabbad to Katli |
Jiyunata |
100000 |
|
4 |
C/O Puli at Khairty Khair nala |
Jiyunata |
100000 |
|
5 |
C/O Bowdi at Tritha No 2 |
Jiyunata |
50000 |
|
6 |
C/O Puli at Village Kurla Khadd |
Jiyunata |
50000 |
|
7 |
C/O Panihar at Kunna |
Jiyunata |
50000 |
|
8 |
C/O soil Conservation Work at Tritha |
Jiyunata |
50000 |
|
9 |
C/O Soil Conservation Work at Dhura Sappad |
Jiyunata |
50000 |
|
10 |
C/O Tank at Uled |
Jiyunata |
50000 |
|
11 |
C/O Soil Conservation Work at Khorati |
Jiyunata |
50000 |
|
12 |
C/O Bowdi at Khurla |
Jiyunata |
50000 |
|
|
TOTAL |
|
700000 |
|
1 |
C/O Soil Conservation work at Lower Maled |
Nagali |
100000 |
|
2 |
C/O Soil Conservation work at Lower Nanahara |
Nagali |
100000 |
|
3 |
C/O Soil Conseration work at Lower Kunera |
Nagali |
60000 |
|
|
TOTAL |
|
260000 |
|
1 |
C/O Khul at Village Sakadia to Village Tunka |
Baghdhar |
60000 |
|
2 |
C/O Soil Conservation Work at Kapal Nali to Khodu Nala |
Baghdhar |
50000 |
|
|
TOTAL |
|
110000 |
|
1 |
C/O Soil Conservation work at Village Baad |
Dhalog |
50000 |
|
2 |
C/O Plantation at bani Badadu |
Dhalog |
50000 |
|
3 |
C/O Soil Conservation Work at Badadu Nala |
Dhalog |
100000 |
|
4 |
C/O Bowdi Bagota Nala |
Dhalog |
50000 |
|
5 |
C/O Bowdi Vill thamb |
Dhalog |
50000 |
|
6 |
C/O Plantation at Basti to vill Dalog |
Dhalog |
100000 |
|
7 |
C/O Bawaly at Dhar |
Dhalog |
50000 |
|
8 |
C/O Check Dam at Bangota Nala |
|
100000 |
|
|
TOTAL |
|
550000 |
|
1 |
C/O Tank at Village Baili |
Baili |
100000 |
|
2 |
C/O Soil Conservation At Khaddi |
Baili |
50000 |
|
3 |
C/O Soil Conservation At Lahad |
Baili |
50000 |
|
4 |
C/O Soil Conservation at Duhka |
Baili |
50000 |
|
5 |
C/O Soil Conservation at Luna |
Baili |
200000 |
|
6 |
C/O Bowdi at Anen |
Baili |
50000 |
|
|
TOTAL |
|
500000 |
|
1 |
C/O Link road At Ara Machine to Dhobi Moh. |
Banikhet |
200000 |
|
2 |
C/O Soil Conservation Work at Dhobi Mohh. |
Banikhet |
200000 |
|
|
TOTAL |
|
400000 |
|
1 |
C/O Bowdi Vill Kotha |
Bathari |
50000 |
|
|
TOTAL |
|
50000 |
|
1 |
C/O Soil Conservation At Baag vill Kandei |
Samleu |
80000 |
|
2 |
C/O Soil Conservation At Balela Nala vill Kandai |
Samleu |
80000 |
|
3 |
C/O Puli at Suta Nala vill Kandei |
Samleu |
80000 |
|
4 |
C/O Link road At Pipal Ke Ped to Chamera Hospital |
Samleu |
100000 |
|
5 |
C/O Puli at Balela nala vill kandei |
Samleu |
80000 |
|
6 |
C/O Soil Conservation Khudku Khadd to Lower Samleu |
Samleu |
100000 |
|
|
TOTAL |
|
520000 |
|
1 |
C/O Khul at Badei Nala to Village Badei Malunda |
Malunda |
80000 |
|
2 |
C/O Puli at Bhadua Nala Kheda Nala di Bhui Malunda |
Malunda |
100000 |
|
3 |
C/O Water Storage Talab at Lagot |
Malunda |
100000 |
|
4 |
C/O Bowdi Village Lower Thadu l,Thadi ii, Bhadua 3 , Khalotu 3 |
Malunda |
200000 |
|
5 |
C/O Soil Conservation at Badei |
Malunda |
20000 |
|
6 |
C/O Khul at Sanghadi ghodi to lohani |
Malunda |
100000 |
|
7 |
C/O Soil Conservation At near Badei Chashma |
Malunda |
20000 |
|
8 |
C/O Puli at Gavalnu Nala Vill Chohda Chakka |
Malunda |
50000 |
|
9 |
C/O Soil Conservation At Carse Bhadua to Dhadu |
Malunda |
50000 |
|
10 |
C/O Bowdi at vill Dhanodi |
Malunda |
25000 |
|
11 |
C/O Puli at Badei nala Dhankhnda |
Malunda |
100000 |
|
12 |
C/O Crate work at Chamrog |
Malunda |
30000 |
|
13 |
C/O Bowdi at Kafradi |
Malunda |
25000 |
|
14 |
C/O Bowdi at Badei |
Malunda |
20000 |
|
15 |
C/O Bowdi at Lohani |
Malunda |
25000 |
|
|
TOTAL |
|
945000 |
|
1 |
C/O Bowdi at Bhati |
Morthu |
40000 |
|
2 |
C/O Talab at Vill Hathia |
Morthu |
125000 |
|
3 |
C/O Puli at Chamral Khadd |
Morthu |
125000 |
|
4 |
C/O Land Development at Bhati |
Morthu |
185000 |
|
5 |
C/O Land Development at Upper Morthu |
Morthu |
37000 |
|
6 |
C/O Crate Work at Bhatlahdi & Hathia |
Morthu |
110000 |
|
7 |
C/O Crate work at Brea & Khajoorna |
Morthu |
60000 |
|
8 |
C/O Create work at Jhandi |
Morthu |
15000 |
|
|
TOTAL |
|
697000 |
|
1 |
C/O Khul at Dornda to Thehdi |
Kamala |
150000 |
|
2 |
C/O Soil Conservation At Village Kamala |
Kamala |
150000 |
|
3 |
C/O Khul at Dugah to Jamman |
Kamala |
40000 |
|
4 |
C/O Puli at Sirli Nala |
Kamala |
15000 |
|
5 |
C/O Check Damat Tippri |
Kamala |
80000 |
|
6 |
C/O Khul at Sirli to Kudath |
Kamala |
100000 |
|
7 |
C/O Crate work at near Sirli Kahadd |
Kamala |
80000 |
|
|
TOTAL |
|
615000 |
|
1 |
C/O Puli at Andernala |
Tundi |
150000 |
|
2 |
C/O Plantation at Bhated |
Tundi |
30000 |
|
3 |
C/O Check Dam at Chhotlu |
Tundi |
40000 |
|
4 |
C/O Crate work at Mohari |
Tundi |
70000 |
|
5 |
C/O Soil Conservation At Gadiyade di Bheth Bharadi |
Tundi |
60000 |
|
6 |
C/O Puli at Logani Nala |
Tundi |
100000 |
|
7 |
C/O Crate work at Chhotlu thehda |
Tundi |
50000 |
|
8 |
C/O Soil Conservation At Badi Khul |
Tundi |
50000 |
|
9 |
C/O Soil Conservation At badi Kholu |
Tundi |
80000 |
|
10 |
C/O Bowdi at Lahadi Dharna |
Tundi |
30000 |
|
11 |
C/O Soil Conservation At Nihadi vill Chhotlu |
Tundi |
30000 |
|
12 |
C/O Crate Work at Bhasla |
Tundi |
40000 |
|
13 |
C/O Soil Conservation At Mehli |
Tundi |
60000 |
|
14 |
C/O Plantation at Village Badi (Navatod) |
Tundi |
50000 |
|
15 |
C/O Soil Conservation At Dharna |
Tundi |
50000 |
|
16 |
C/O Soil Cons at. Drabbad |
Tundi |
50000 |
|
|
TOTAL |
|
940000 |
|
1 |
C/O Soil Conservation At Khreda |
Jatruhan |
60000 |
|
2 |
C/O Bowdi at Village Bharampla |
Jatruhan |
50000 |
|
3 |
C/O Soil Conservation At Jangla |
Jatruhan |
50000 |
|
4 |
C/O Panihar at Sarna |
Jatruhan |
60000 |
|
5 |
C/O Soil Conservation At Chhou to Sarna |
Jatruhan |
50000 |
|
6 |
C/O Soil Conservation At Bharampla |
Jatruhan |
50000 |
|
7 |
C/O Soil Conservation At vill Bholag ,Kangar, Chiyod |
Jatruhan |
70000 |
|
8 |
C/O Panihar at Chiyod Nala |
Jatruhan |
50000 |
|
9 |
C/O Panihar at Sarna nala |
Jatruhan |
70000 |
|
10 |
C/O Plantation at Bholag, Chiyod, Kangar |
Jatruhan |
50000 |
|
11 |
C/O soil Cons, at Saloh |
Jatruhan |
50000 |
|
12 |
C/O Soil Conservation At Kalheter |
Jatruhan |
50000 |
|
13 |
C/O Plantation at Sarna |
Jatruhan |
80000 |
|
14 |
C/O Plantation at Jatruhan |
Jatruhan |
60000 |
|
15 |
C/O Soil Cons at Bholag |
Jatruhan |
50000 |
|
16 |
R/o Panihar & bawaly at vill Dadriyadu |
Jatruhan |
60000 |
|
17 |
R/o Well at Jatruhan ward |
Jatruhan |
30000 |
|
|
TOTAL |
|
940000 |
|
1 |
C/O Bawaly Village Kunde |
Banet |
20000 |
|
2 |
C/O Khul at Nalsra Banet to Bade da Paind |
Banet |
200000 |
|
3 |
C/O Puli at Bhulki Seer Khadd |
Banet |
120000 |
|
4 |
C/O Bowdi at Thandi Nali Village Cheli |
Banet |
20000 |
|
5 |
C/O Panihar at Nehar Nala |
Banet |
35000 |
|
6 |
C/O Soil Conservation At Matoyana to cheli nala |
Banet |
20000 |
|
7 |
C/O Panihar at Bhanwra to Chudhana |
Banet |
30000 |
|
8 |
C/O Khul at Chudhana to Dhana |
Banet |
50000 |
|
9 |
C/O Panihar at Vill Khabbar |
Banet |
50000 |
|
10 |
C/O Soil Conservation Work at Vill Lagdu Dramman Sere da Chundu |
Banet |
150000 |
|
|
TOTAL |
|
695000 |
|
1 |
C/O Bowdi at Harijan Kuthehad |
Kudunu |
30000 |
|
|
TOTAL |
|
30000 |
|
1 |
C/O Create work at Naroli nala to Faat |
Samote |
50000 |
|
2 |
C/O Crate work at Chatoli Nala |
Samote |
100000 |
|
3 |
C/O Khul at Athwad to Pukhar |
Samote |
50000 |
|
4 |
C/O Crate work at Mahla & Sairi |
Samote |
100000 |
|
5 |
C/O Soil Conservation Work at Village Jasoor |
Samote |
50000 |
|
6 |
C/O Crate Work at Chavashu Nala |
Samote |
80000 |
|
|
TOTAL |
|
430000 |
|
1 |
C/O Crate Work at Village Gummu |
Kathet |
100000 |
|
2 |
C/O Crate work at Bont Dramman |
Kathet |
120000 |
|
3 |
C/O Crate Work at Madia di Dhaar |
Kathet |
100000 |
|
4 |
C/O Crate work at Khajrod |
Kathet |
100000 |
|
5 |
C/O Crate work at rog |
Kathet |
80000 |
|
6 |
C/O Puli at Sarpada Nala |
Kathet |
100000 |
|
7 |
C/O Crate work at Gstiliysn di Dhar |
Kathet |
100000 |
|
8 |
C/O Pilu Juda da Nala |
Kathet |
100000 |
|
9 |
C/O Crate work at Kathet |
Kathet |
70000 |
|
10 |
C/O Crate work at Luhani |
Kathet |
100000 |
|
11 |
C/O Crate work at Basa |
Kathet |
150000 |
|
12 |
C/O Puli at Drala Nala |
Kathet |
50000 |
|
13 |
C/O Check Dam at Sahala Birnu |
Kathet |
100000 |
|
14 |
C/O Crate work at Badi Dhar |
Kathet |
100000 |
|
15 |
C/O Crate work at Jhola |
Kathet |
100000 |
|
16 |
C/O Crate work at Bhatola di Luhan |
Kathet |
100000 |
|
17 |
C/O Khul Vill Nouni |
Kathet |
5000 |
|
18 |
C/O Bowdi at vill. Nog |
Kathet |
10000 |
|
|
TOTAL |
|
1585000 |
|
1 |
C/O Soil Conservation Work at Jhuled Nali Gumrahar |
Surpada |
200000 |
|
2 |
C/O Soil Conservation Work at Khola Nala l |
Surpada |
100000 |
|
3 |
C/O Land Development At Surpada |
Surpada |
100000 |
|
4 |
C/O Land Development Work at Village Thehda |
Surpada |
100000 |
|
5 |
C/O Soil Conservation Work at Khola Nala ll |
Surpada |
100000 |
|
6 |
C/O Plantation at Vill Gumrahar 5 Hect. |
Surpada |
90000 |
|
7 |
C/O Bowdi at Halani |
Surpada |
30000 |
|
8 |
C/O Bowdi at Chafadu |
Surpada |
30000 |
|
9 |
C/O Bowdi at Kui |
Surpada |
30000 |
|
10 |
C/O Land Development Work at Kui |
Surpada |
100000 |
|
|
TOTAL |
|
880000 |
|
1 |
C/O Bowdi at Kabar |
Dharoon |
25000 |
|
2 |
C/O Bowdi at Village Kathiyadi l |
Dharoon |
25000 |
|
3 |
C/O Bowdi at Bhutal |
Dharoon |
25000 |
|
4 |
C/O Bowdi at Malwan |
Dharoon |
25000 |
|
5 |
C/O Bowdi at Julahkad Basa |
Dharoon |
25000 |
|
6 |
C/O Land Development Work at Kiyod |
Dharoon |
40000 |
|
7 |
C/O Land Development At Badotru Bassa |
Dharoon |
25000 |
|
8 |
C/O Land Development At Kathiyadi |
Dharoon |
40000 |
|
9 |
C/O Land Development At Banet |
Dharoon |
80000 |
|
10 |
C/O Land Development At Sodar Khola |
Dharoon |
40000 |
|
11 |
C/O Bowdi at Kathiyadi ll |
Dharoon |
25000 |
|
12 |
C/O Land Development At Banmala Basa |
Dharoon |
50000 |
|
13 |
C/O Land Development At Kutani Nala |
Dharoon |
50000 |
|
14 |
C/O Bowdi at Nali |
Dharoon |
25000 |
|
15 |
C/O Plantation work at Chownki |
Dharoon |
50000 |
|
16 |
C/O Plantation work at Harodi |
Dharoon |
70000 |
|
17 |
C/O Plantation work at Khenta |
Dharoon |
50000 |
|
18 |
C/O Tank at Baroh |
Dharoon |
50000 |
|
|
TOTAL |
|
720000 |
|
1 |
C/O Soil Conservation Work at Dharuna di Bei |
Jandrog |
50000 |
|
2 |
C/O Soil Cons work at Chil Bei |
Jandrog |
50000 |
|
3 |
C/O Soil Conservation Work at Thehda |
Jandrog |
50000 |
|
4 |
C/O Bowdi at Kuldhar |
Jandrog |
30000 |
|
5 |
C/O Soil Conservation At Muni Bei |
Jandrog |
50000 |
|
6 |
C/O Bowdi Rath Bhora |
Jandrog |
30000 |
|
7 |
C/O Water Tank at Chakdan thehdu |
Jandrog |
50000 |
|
8 |
C/O Soil Conservation Work at Kutt |
Jandrog |
100000 |
|
9 |
C/O Panihar at Dadriyada |
Jandrog |
20000 |
|
10 |
C/O Water tank at Thehda |
Jandrog |
50000 |
|
11 |
C/O Soil Conservation At Roleta Chakki |
Jandrog |
50000 |
|
12 |
C/O Soil Cons at Batal Behi |
Jandrog |
50000 |
|
13 |
C/O Soil Conservation Work at Nidhut Nali ll |
Jandrog |
80000 |
|
14 |
C/O Soil Conservation At Village Matt |
Jandrog |
50000 |
|
15 |
C/O Khul at Jhanjher Nala to Daukbali |
Jandrog |
50000 |
|
16 |
C/O Water Tank at Ganth |
Jandrog |
50000 |
|
17 |
C/O Soil Conservation At Vill Arupher |
Jandrog |
50000 |
|
18 |
C/O Plantation at Ahan |
Jandrog |
35000 |
|
19 |
C/O Soil Conservation At Lahad Nali |
Jandrog |
50000 |
|
20 |
C/O Soil Conservation At Lahad |
Jandrog |
50000 |
|
21 |
C/O Khul at Kutt to Khaladu |
Jandrog |
50000 |
|
22 |
C/O Soil Conservation Work at Ruhadu |
Jandrog |
100000 |
|
23 |
C/O Plantation work at Drabbad |
Jandrog |
30000 |
|
24 |
C/O Plantation work at Chakdan |
Jandrog |
30000 |
|
|
TOTAL |
|
1205000 |
|
1 |
C/O Talab at Village Baila |
Manhuta |
50000 |
|
2 |
C/O Check Dam at Khajoor |
Manhuta |
50000 |
|
3 |
C/O Khul at Gharat to Paind |
Manhuta |
60000 |
|
4 |
C/O Soil conservation work at Bade d Kheter |
Manhuta |
60000 |
|
5 |
C/O Khul at Kharedu to Nali |
Manhuta |
50000 |
|
6 |
C/O Check Dam at Baie Gadet |
Manhuta |
60000 |
|
7 |
C/O Soil Conservation at Bhati Ladera Nali |
Manhuta |
80000 |
|
8 |
C/O Check Dam Banotu Ban |
Manhuta |
60000 |
|
9 |
C/O Puli Chirdi Nala |
Manhuta |
90000 |
|
10 |
C/O Check Dam at Chamarka bali |
Manhuta |
60000 |
|
11 |
C/O Land Development work at Nagani Nala |
Manhuta |
80000 |
|
12 |
C/O Khul at Dhangdu to Papanthi |
Manhuta |
60000 |
|
13 |
C/O Check Dam Nalu |
Manhuta |
60000 |
|
14 |
C/O Puli Droni Mandir Nala |
Manhuta |
80000 |
|
|
TOTAL |
|
900000 |
|
1 |
C/O Soil Conservation work at Muradi |
Raipur |
50000 |
|
2 |
C/O Soil Conservation work at Raipur Nala lll |
Raipur |
50000 |
|
3 |
C/O Khul at Bilohad Khadd to Bhandala |
Raipur |
80000 |
|
4 |
C/O Talab at Village Singa di Ray |
Raipur |
50000 |
|
5 |
C/O Bowdi at Dhamnadi |
Raipur |
22000 |
|
6 |
C/O Khul at Danali to Maradi Kapadi |
Raipur |
80000 |
|
7 |
C/O Water Tank at Marad Bhatola di Tol |
Raipur |
40000 |
|
8 |
C/O Soil Conservation work at Bhatolan |
Raipur |
50000 |
|
9 |
C/O Bowdi at Raipur |
Raipur |
20000 |
|
10 |
C/O Bowdi at Khabrotu l |
Raipur |
30000 |
|
11 |
C/O Bowdi at Yori Nala |
Raipur |
20000 |
|
12 |
C/O Nursery at Dhamnadi |
Raipur |
40000 |
|
13 |
C/O Bowdi at Dramman |
Raipur |
22000 |
|
14 |
C/O Bowdi at Chhafad |
Raipur |
20000 |
|
15 |
C/O Bowdi at Luharka |
Raipur |
20000 |
|
16 |
C/O Plantation work at Raipur Chowki |
Raipur |
30000 |
|
17 |
C/O Talab at Bhagdani |
Raipur |
50000 |
|
18 |
C/O Soil Conservation work at Narhelu |
Raipur |
50000 |
|
19 |
C/O Irrigation Tank at Narhelu |
Raipur |
50000 |
|
20 |
C/O Bowdi at Khabrotu ll |
Raipur |
30000 |
|
21 |
C/O Soil Conservation work at Raipur Jarie Nala l |
Raipur |
50000 |
|
22 |
C/O Plantation at Raipur Jarei |
Raipur |
20000 |
|
23 |
C/O Bowdi at Paddar |
Raipur |
20000 |
|
24 |
C/O Bowdi at Kuddi Parli |
Raipur |
20000 |
|
25 |
C/O Bowdi at Khare da Drabbad |
Raipur |
20000 |
|
26 |
C/O Bowdi at Kathoon |
Raipur |
20000 |
|
|
TOTAL |
|
954000 |
|
1 |
C/O Puli at Jiyad Nala |
Binna |
180000 |
|
2 |
C/O Jeepable road at Khajja to Garna |
Binna |
100000 |
|
|
TOTAL |
|
280000 |
|
1 |
C/O Bowdi at Lower Durdala |
Chhalada |
25000 |
|
2 |
C/O Khul at Ghagar to Uansi |
Chhalada |
50000 |
|
3 |
C/O Talab at Upper Durdala |
Chhalada |
20000 |
|
4 |
C/O Plantation at Durdala |
Chhalada |
70000 |
|
5 |
C/O Crate work at Harijan Basti Chhalada near Harijan |
Chhalada |
60000 |
|
6 |
C/O Soil Conservation work at Balthadi Thathal Khadd |
Chhalada |
30000 |
|
|
TOTAL |
|
255000 |
|
1 |
C/O Soil Conservation work at Chanot |
Khanoda |
50000 |
|
2 |
C/O Bowdi at Ghaghani Jhulada |
Khanoda |
30000 |
|
3 |
C/O Bowdi at Sola Dramman |
Khanoda |
30000 |
|
4 |
C/O Khul at Kholi to Kakkad nala |
Khanoda |
60000 |
|
5 |
C/O Khul at Jhulada to Jhamali |
Khanoda |
50000 |
|
6 |
C/O Bowdi at Ghaghoot |
Khanoda |
30000 |
|
7 |
C/O Piuli at Nadu Nala |
Khanoda |
50000 |
|
8 |
C/O Bowdi at Kakkad Nala |
Khanoda |
30000 |
|
9 |
C/O Bowdi at Bokad Nala Jhulada |
Khanoda |
30000 |
|
10 |
C/O Bowdi at medi di ray |
Khanoda |
30000 |
|
11 |
C/O Plantation at Motu |
Khanoda |
50000 |
|
12 |
C/O Bowdi at Beri da Langa |
Khanoda |
30000 |
|
13 |
C/O Plantation at Garned Malayan |
Khanoda |
50000 |
|
|
TOTAL |
|
520000 |
|
1 |
C/O Soil Conservation work at Lower Saroh |
Parsiara |
60000 |
|
2 |
C/O Puli at Saroh Nala |
Parsiara |
80000 |
|
3 |
C/O Soil Conservation work at Kothi Paddar |
Parsiara |
70000 |
|
4 |
C/O Soil Conservation work at Sarohfati |
Parsiara |
70000 |
|
5 |
C/O Puli at Bhaliyada Nala |
Parsiara |
80000 |
|
6 |
C/O Bowdi at Lahadi |
Parsiara |
40000 |
|
7 |
C/O Soil Conservation work at Chanood |
Parsiara |
70000 |
|
8 |
C/O Khul at Midah Bua Nala to Ghanghru |
Parsiara |
100000 |
|
9 |
C/O Puli at Simble da Gharat Kothi Paddar Nala |
Parsiara |
80000 |
|
10 |
C/O Soil Conservation work at Bharianu Parsiara |
Parsiara |
50000 |
|
11 |
C/O Soil Conservation work at Ard Jood Dramman |
Parsiara |
50000 |
|
12 |
C/O Soil Conservation work at Pukhar |
Parsiara |
40000 |
|
13 |
C/O Land Development at Village Arad |
Parsiara |
80000 |
|
14 |
C/O Soil Conservation work at Mihad |
Parsiara |
70000 |
|
|
TOTAL |
|
940000 |
|
1 |
C/O Link Road at Dainag to Bhagiana |
Garnota |
150000 |
|
2 |
C/O Nursery at Village Jiu |
Garnota |
100000 |
|
3 |
C/O Puli at Balu nala |
Garnota |
100000 |
|
4 |
C/O Khul at Suked khadd to Riyan |
Garnota |
100000 |
|
5 |
C/O Khul at Dharad to triu |
Garnota |
100000 |
|
6 |
C/O Bowdi at Padwal |
Garnota |
30000 |
|
7 |
C/O Bowdi at Jiu |
Garnota |
30000 |
|
8 |
C/O Plantation work at Padwal |
Garnota |
60000 |
|
9 |
C/O Puli at Dornda Sirli Nala |
Garnota |
100000 |
|
10 |
C/O Khul at Main Khul to Dorda |
Garnota |
60000 |
|
11 |
C/O Plantation at Gunali Nala |
Garnota |
20000 |
|
12 |
C/O Crate work at Nagani Nala |
Garnota |
100000 |
|
13 |
C/O Khul at Nagani nala to Dreg Jiu |
Garnota |
50000 |
|
|
TOTAL |
|
1000000 |
|
1 |
C/O Water tank at Khilla |
Dhulara |
50000 |
|
2 |
C/O Soil conservation work at Drammnala |
Dhulara |
50000 |
|
3 |
C/O Bowdi at Chho Village Khadander |
Dhulara |
40000 |
|
4 |
C/O Bowdi at Battoi Malhetra |
Dhulara |
30000 |
|
5 |
C/O Plantation work at Bassa |
Dhulara |
64000 |
|
6 |
C/O Soil Conservation work at Khandander |
Dhulara |
40000 |
|
7 |
C/O Soil Conservation work at Khilla |
Dhulara |
50000 |
|
8 |
C/O Soil Conservation work at Ali da Faat |
Dhulara |
40000 |
|
9 |
C/O Soil Conservation work at Kharal |
Dhulara |
40000 |
|
10 |
C/O Bowdi at Lodergarh |
Dhulara |
30000 |
|
11 |
C/O Panihar at Ali da Faat |
Dhulara |
20000 |
|
|
TOTAL |
|
454000 |
|
1 |
C/O Land development at Nyai |
Sihunta |
100000 |
|
2 |
C/O Land Development at Upper Malahad |
Sihunta |
100000 |
|
3 |
C/O Talab at Bantor |
Sihunta |
80000 |
|
4 |
C/O Khul at Badd to Jangla |
Sihunta |
80000 |
|
5 |
C/O Talab Sukhroi Badd |
Sihunta |
80000 |
|
|
TOTAL |
|
440000 |
|
1 |
C/O Khul at Kalihara di Khul Vill Doth |
Sadal |
50000 |
|
2 |
C/O Soil Conservation work at Village Dholi |
Sadal |
30000 |
|
3 |
C/O Talab at Gachhiar |
Sadal |
100000 |
|
4 |
C/O Soil Conservation work at Chaladi Nala |
Sadal |
40000 |
|
5 |
C/O Water Conservation at Village Manooh |
Sadal |
25000 |
|
6 |
C/O Soil Conservation work at Gudunu da nala Village Doth |
Sadal |
50000 |
|
7 |
C/O Soil Conservation work at Kugnar Ghar |
Sadal |
50000 |
|
8 |
C/O Khul at Charadi nala to Khet |
Sadal |
30000 |
|
9 |
C/O Check Dam at Rand |
Sadal |
25000 |
|
10 |
C/O Soil Conservation work at Nadu |
Sadal |
50000 |
|
11 |
C/O Soil Conservation work at Rand Nala |
Sadal |
20000 |
|
12 |
C/O Soil Conservation work at Rakh da Nala |
Sadal |
50000 |
|
13 |
C/O Soil Conservation work at Ghatu Dhar |
Sadal |
50000 |
|
14 |
C/O Bowdi at Patloi di banvillage Kelen |
Sadal |
20000 |
|
|
TOTAL |
|
590000 |
|
1 |
C/O Bowdi Bhont |
Rajain |
40000 |
|
2 |
C/O Soil Conservation work at Pukhru to kholi |
Rajain |
30000 |
|
3 |
C/O Bowdi Pukharu |
Rajain |
50000 |
|
4 |
C/O Khul at Bhadela Nala to Village Bhadela |
Rajain |
30000 |
|
|
TOTAL |
|
150000 |
|
|
Grand Total |
33760392 |